Permanent occupancy | | | 12/21/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7563 issued 12-21-98 to St. Al's Ofc., #5 for the Idaho E.N.T.
|
Permanent Occupancy | | 11/17/1998 | 11/17/1998 | | DONE |
|
|
|
|
INSP - Final | 11/16/1998 | 11/16/1998 | 11/16/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 10/29/1998 | 10/29/1998 | 10/29/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL ALARM PACKAGE MED GAS PAPERWORK PER NFPA 99
|
INSP - Occup. violation notice | 10/12/1998 | 10/12/1998 | 10/12/1998 | | PART |
|
|
|
/ / 338 - TO KREISENBECK OFF IC TRAILER AT THE CECIL WILL EXPE DITE
|
INSP - Carpentry | 11/19/1997 | 11/20/1997 | 11/20/1997 | A | PART |
|
|
|
for the 2-hour assy at the underside of the floor drains at the 4th floor sinks
|
Temporary occupancy | | | 11/17/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3505 issued 11-17-97 to Idaho E.N.T.
|
INSP - Final | 11/6/1997 | 11/6/1997 | 11/6/1997 | P | PART |
|
|
|
11/06/97 333 - temp ok
|
INSP - Final | 11/6/1997 | 11/6/1997 | 11/6/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR TEMP OCC ALARM SUBMITTAL MED GAS PAP RM
|
INSP-Final Inspection | 11/3/1997 | 11/4/1997 | 11/4/1997 | P | FAIL |
Joe Tawney
|
|
|
11/04/97 406 - FINAL NOT COMPLETED RESUME 11/5/97
|
INSP-Final Inspection | 10/28/1997 | 10/30/1997 | 10/30/1997 | P | NR |
Joe Tawney
|
|
|
10/30/97 406 - FINAL NOT READY DIG DIALER NOT INSTALLED
|
INSP - Framing/Rough-in | 10/17/1997 | 10/20/1997 | 10/20/1997 | A | PART |
|
|
|
REINSPECTION, FIRE PENETRATION verbal corrections put down on the pre lim punch list.
|
INSP - Framing/Rough-in | 10/8/1997 | 10/9/1997 | 10/9/1997 | A | PART |
|
|
|
10/09/97 338 - partial made ok c/n issued
|
INSP - Framing/Rough-in | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | PASS |
|
|
|
08/26/97 338 - OUT OF TIME WILL DO 08-27-97 EARLY AS POSSIBLE
|
INSP - Conference | 8/11/1997 | 8/11/1997 | 8/11/1997 | | PASS |
|
|
|
/ / 338 - MADE OK ACCEPTED THE RESUBMITTAL FOR FIRE PROTECTION DETAIL
|
INSP - Conference | 8/11/1997 | 8/11/1997 | 8/11/1997 | P | CANC |
|
|
|
08/11/97 338 - out of time will do #1 tom
|
INSP - Resubmittals | 8/11/1997 | 8/11/1997 | 8/11/1997 | | PASS |
|
|
|
/ / 338 - MADE OK FOR TH E2-HOUR PENETRATION AT THE MEDICAL GAS VALVES
|
INSP - Conference | 8/6/1997 | 8/7/1997 | 8/7/1997 | A | FAIL |
|
|
|
08/06/97 338 - 2-hr walls penes not acceptable
|
INSP - Resubmittals | 8/5/1997 | 8/5/1997 | 8/5/1997 | | PASS |
|
|
|
/ / 338 - approved assy that matches the as built on the top of the ra
|
INSP - Framing/Rough-in | 8/4/1997 | 8/5/1997 | 8/5/1997 | A | PASS |
|
|
|
08/05/97 338 - south end f/ pene ok
|
INSP - Conference | 7/31/1997 | 8/4/1997 | 8/4/1997 | A | CANC |
Russ Owen
|
|
|
08/04/97 407 - as you requested/one of the sweet ladies. will re-schedual with pery.
|
INSP - Framing/Rough-in | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | PART |
|
|
|
07/31/97 338 - 4th floorthrough pennetration fire stops
|
INSP - Conference | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | CANC |
|
|
|
07/31/97 338 - cancelled till next week
|
INSP - Framing/Rough-in | 7/29/1997 | 7/30/1997 | 7/30/1997 | A | PART |
|
|
|
07/30/97 338 - misc framing on th enew 4th floor south 1/4 of the structure
|
Plan assigned to (DRS) | 4/1/1997 | | 7/23/1997 | | PASS |
Dan Stuart
|
|
|
07/23/97 10:13:29 DRS - this action updated by action script from <<>> in Case No. BLD97-0730
|
Issue PAID IN FULL permit | | | 7/23/1997 | | |
|
|
|
|
Telephone call | | | 7/23/1997 | | |
|
|
|
CALLED ROB PERMIT READY
|
Inspection Record Card- Bld | | | 7/23/1997 | | |
|
|
|
|
(F) Reprint permit | | | 7/23/1997 | | |
|
|
|
|
Print Occupancy Form | | | 7/23/1997 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/23/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/1997 | | PASS |
|
|
|
Approved as noted and attached. Stamped plans for electrical division that hey will be reviewed in the field.
|
Routing - PLAN CHECK | 7/17/1997 | | 7/23/1997 | | PASS |
|
|
|
Routed plans to Electrical Div. on 07/17/97 after talking with Jim Schmer to see if he needed to review the I1.1 Occupancy portion. 07/22/97 - Called Jim Schmer after receiving a call from Kreizenbeck Constructors inquiring about the permit. 07/23/97 - Plans returned to Dave Radford, by Jim Schmer, with instructions to stamp plans that electrical will be reviewed in the field. I have done this for Dave to help get the permit issued. Routing to process for issuance of permit.
|
Telephone call | | | 7/18/1997 | | |
|
|
|
PERMIT READY, FEE DUE/ TALKED TO ROB UHLORN
|
Routing - FIRE | 7/11/1997 | | 7/17/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/20/1997 | | 7/11/1997 | | |
|
|
|
|
Plan resubmittals received | | | 7/10/1997 | | |
|
|
|
Mechanical clarifcation still incomplete but in the effort to issue the permit I am attaching a copy of the UFC Sections in question as well as faxing a copy to the architect and then phoning him to discuss the question. Routing back to fire dept. for re-review.
|
Plan resubmittals requested | | | 7/3/1997 | | |
|
|
|
Sent ;etter to Sam Burrows for additional clarification not provided on plans.
|
Plan resubmittals received | | | 6/27/1997 | | PEND |
|
|
|
Received response and resubmittals. Resubmittals are not complete. Requesting additional clarification.
|
90 day tracking............. | | 3/28/1997 | 6/26/1997 | | PEND |
|
|
|
|
Routing - FIRE | 6/17/1997 | | 6/20/1997 | | FAIL |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/17/1997 | | PASS |
|
|
|
Routing to Fire dept.
|
Routing - PLAN CHECK | 5/22/1997 | | 6/17/1997 | | |
|
|
|
Finished preliminary plan review. Mailed & FAXED copy to Sam Burrows. Routinh to F.D.
|
Plan resubmittals requested | | | 6/16/1997 | | PEND |
|
|
|
Faxed and mailed copy of preliminary plan review to Sam Burrows for response. Routed plans to F. D.
|
Telephone call | | | 6/13/1997 | | |
|
|
|
Call from Sam Burrows asking about clearance at the water fountain / restroom door and if two fountains are required. I told him the clearance would have to meet code and that if a drinking fountain was provided it would need to be accessible per Sec. 1105.4.1, but more than one is not a requirement of the code for this occupancy type per Chapter 29.
|
Telephone call | | | 6/5/1997 | | |
|
|
|
Call to Sam Burrows concerning required door clearance on latch side at the door between the office/clerical area and the reception area.
|
Meeting | | | 6/2/1997 | | |
|
|
|
Met with Sam Burrows & Rob of Kreizenbeck Constructors. We went over the items I had noted to date in reviewing plans and Sam took notes and the form to be used to designate the architect of record so that he could start working on the correction while I continued my review. The meeting was a result of aphone conversation between Rob and me on concerns I had about the plans. During the conversation it was discovered that the latest copies of plans had not been submitted to the city for review and that many of my concerns may be alright if I were to get the current plans.
|
Routing - PLAN CHECK | 4/8/1997 | | 5/22/1997 | | |
|
|
|
Started plan review
|
Routing - PUBLIC WORKS | 4/4/1997 | | 4/8/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 3/28/1997 | | 4/1/1997 | | PASS |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 4/1/1997 | | |
|
|
|
Route to PUBLIC WORKS then back to Plan Check. After Plan Check route to FIRE DEPARTMENT.
|
Recd Pcfee & Taken To Pln CK | | | 3/28/1997 | | |
|
|
|
|
Application received | | | 3/28/1997 | | |
|
|
|
|
Telephone call | | | 5/29/1996 | | |
|
|
|
Call from Rob of Kreizenbeck Constructors to check on progress of plan review. We discussed a few of the items I had noted and Rob commented that his plans were different in some areas than mine. He asked if we could set up a meeting with himself and Sam Burrows, architect for the project. A time was set for June 2, at 2:30 p.m.
|