Permit NumberBLD97-00747
StatusFinaled
Name BUILDING #8 (TYPE I)
Site Address 6328 N PARK MEADOW WAY
Project NameRENAISSANCE
Customer Number 
ePlanReviewNo
Description
(BLD #8 - TYPE I - 24 UNIT APARTMENT BLDG) Fire sprinklers (NFPA 13R) are used to meet apartment provisions. To construct a new 19,284 square foot 3 story apartment building with 8 units (6,428 sq. ft.) per level. Two (2) units on the ground level are to be accessible to the disabled. Building elements include post tensioned slab on grade; 1-hr fire-resistive combustible walls, floor/ceilings (gypcrete topping), and roof/ceilings; asphalt shingles; fiber reinforced cement siding; masonry veneer; and a wood truss roof all per approved drawings, engineering, and plan check conditions on file. The fire sprinkler system shall comply with NFPA 13R as regulated by the Fire Department. DR-118-96; CU-22-96; PC-083-97 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  12/10/1998 PASS
Perm. Occ. Cert. #7535 issued 12-10-98 to the Renaissance Apts., Bldg. #8.
INSP - Final12/8/199812/8/199812/8/1998PPASS
DetailsJim Sly
12/08/98 316 -
Permanent Occupancy 12/8/199812/8/1998 DONE
Details
INSP - Final12/1/199812/2/199812/2/1998PFAIL
DetailsJim Sly
12/02/98 316 - Scheduled by Hello!.
Temporary occupancy  9/8/1998 PASS
Temp. Occ. Cert. #3691 issued 9-8-98 to the Renaissance Apts.
INSP-Final Inspection9/1/19989/3/19989/3/1998APASS
DetailsJoe Tawney
09/03/98 406 - Scheduled by Hello!. Contact phone is [9395335]. FINAL OK FOR PERM OCC
INSP - Final9/1/19989/3/19989/3/1998PPART
DetailsJim Sly
09/03/98 316 - OK for Temp Occ. C/N...1 1/2 " clear on handrails, adjust
INSP-Alarm Testing9/1/19989/3/19989/3/1998APASS
DetailsJoe Tawney
09/03/98 406 - Scheduled by Hello!. Contact phone is [9395335]. FINAL OK ON ALARM TEST
INSP-Sprinkler Rough-in/Hydro7/17/19987/17/19987/17/1998PPART
DetailsJoe Tawney
07/17/98 406 - ###-#### renaissance OK ON FDC HYDRO TEST
INSP - Energy code compliance6/12/19986/12/19986/12/1998PPASS
DetailsJim Sly
06/12/98 316 - Scheduled by Hello!. Contact phone is [9395335].
INSP - Framing/Rough-in6/11/19986/12/19986/12/1998AFAIL
DetailsJim Sly
06/12/98 316 - Complete prv corr notice.............. [9395335].
INSP - Framing/Rough-in6/12/19986/12/19986/12/1998PPASS
DetailsJim Sly
06/12/98 316 - Scheduled by Hello!. Contact phone is [9395335].
INSP - Framing/Rough-in6/11/19986/11/19986/11/1998PPART
DetailsJim Sly
06/11/98 316 - !st floor only....... Contact phone is [9395335].
INSP - Framing/Rough-in6/10/19986/10/19986/10/1998PFAIL
DetailsJim Sly
06/10/98 316 - C/N..Draftst, elect box 24" horiz, fireblk chimn, extend
INSP - Framing/Rough-in5/28/19985/29/19985/29/1998APART
DetailsJim Sly
05/29/98 316 - OK for pre rock only..Kitch Bath Utility..............
INSP - Framing/Rough-in5/20/19985/21/19985/21/1998AFAIL
DetailsJim Sly
05/21/98 316 - C/N...Complete chimn, firblk, fireclk, Cont gyp membr at
INSP - Framing/Rough-in5/19/19985/19/19985/19/1998PPART
DetailsJim Sly
05/19/98 316 - OK for pre-rock Bath, Kitch and util....
INSP-Supply line flush5/4/19985/4/19985/4/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Wall cover4/28/19984/29/19984/29/1998APART
DetailsJim Sly
04/29/98 316 - Shear and HDs OK at stair towers.
INSP - Framing/Rough-in4/22/19984/23/19984/23/1998AFAIL
DetailsJim Sly
04/23/98 316 - Missed holdown on S. E. stair tower...
INSP-Sprinkler Rough-in/Hydro4/10/19984/13/19984/13/1998APART
DetailsJoe Tawney
Scheduled by Hello!. Contact phone is [9395335]. OK ON ROUGH IN & OK ON HYDRO TEST EXC FDC PIPING
INSP - Foundation3/19/19983/20/19983/20/1998ACANC
DetailsTom Arcoraci
03/20/98 408 - Scheduled by Hello!. Contact phone is [9395335]. done by 316
INSP - Foundation3/4/19983/4/19983/4/1998PPART
DetailsJim Sly
03/04/98 316 - Holdowns only OK Contact phone is [9395335].
Issue PAID IN FULL permit  7/22/1997
Telephone call  7/1/1997
CALLED CINDY AT DUKE/ PERMITS READY, FEE DUE
PLANS/APPL TAKEN TO FRONT DESK  6/30/1997 PASS
Inspection Record Card- Bld  6/30/1997
Print Occupancy Form  6/30/1997
Print permit w/o conditions  6/24/1997
testing condition printout  6/24/1997
Plan Reviewer's activity  6/6/1997 PASS
Drawings approved June 6, 1997 after resubmittal review.
Plan resubmittals received  5/16/1997 PASS
Plan Reviewer's activity  4/30/1997
See actions attached to BLD97-0407 for additional information.
Plan Reviewer's activity  4/9/1997
UBC plan check started April 9, 1997 and completed April 16, 1997. Report sent to the Architect. A report slightly modified from the original was sent April 30, 1997.
Application received  2/25/1997