Information based on query as of Sunday, July 7, 2024.
Permit Information
Permit NumberBLD97-00876
StatusFinaled
Name BOISE SENIOR CENTER
Site Address 690 ROBBINS RD
Project NameBOISE SR. CENTER
Customer Number 
ePlanReviewNo
Description
BOISE SENIOR CENTER, PHASE I * TO ADD APPRXIMATELY 2,160 SQ. FT. OF NEW OFFICE SPACE TO THE EXISTING SENIOR CENTER AND TO RENOVATE AND REMODEL THE EXISTING CORRIDORS AND FRONT LOBBY AREA TO MEET ONE-HOUR CORRIDOR REQUIREMENTS. THIS BUILDING IS TO BE FULLY FIRE SPRINKLERED AND IS BEING USED TO SUBSTITUTE FOR ONE-HOUR CONSTRUCTION REQUIREMENTS PER UBC SECTION 508. THE WORK SHALL BE PHASED INTO THREE PHASES. THIS PERMIT PERTAINS TO PHASE I. PHASE I SHALL BE AS FOLLOWED: SITE PREPARATION FOR CONSTRUCTION OF NEW ADDITION AND RELATED SITE UTILITIES. BEGIN CONSTRUCTION OF UNISEX ACCESSIBLE RESTROOM. CORRIDOR UPGRADES ADJACENT TO RESTROOMS AS INDICATED ON DRAWINGS. BEGINNING OF INSTALLATION OF NEW FIRE ALARM SYSTEM, WHILE MAINTAINING EXISTING FIRE ALARM SYSTEM FULLY FUNCTIONAL. UPGRADE OF FASCIAL/SOFFIT ON EXISTING BUILDING. HVAC, AND PLUMBING. MJP (PC#189-97) THIS PROJECT IS LOCATED IN THE FLOOD PLAIN AND A CERTIFICATE OF ELEVATION MUST BE SUBMITTED.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/14/1998 9/10/1998
Plan resubmittals received  7/10/1998
RECEIVED 1 COPY OF PHOTO OF KITCHEN EXHAUST HOOD 1 COPY OF 3M FIREMASTER PRODUCT LITERATURE (3 PG) ROUTED TO RICK JACKSON
INSP - Final1/26/19981/26/19981/26/1998PPASS
Details
01/26/98 333 - CARD SIGNED FOR PERM PHASE 1
Permanent Occupancy 1/26/19981/26/1998 DONE
Details
Permanent occupancy  1/26/1998 PASS
Perm. Occ. Cert. #7112 issued 1-26-98 to the Boise Senior Center for the addn.
INSP-Final Inspection1/20/19981/20/19981/20/1998PPASS
DetailsRick Jackson
Phase 1 completed. strobe device relocated and functional. c/o approved - card not on-site to sign.
INSP-Final Inspection1/13/19981/13/19981/13/1998PPART
DetailsRick Jackson
tested alarms - pass. kitchen extinguishing system, outside sprinkler control valve and monitoring to be part of Phase 2 permit. dampers in corridor functioned properly
INSP-Final Inspection1/9/19981/9/19981/9/1998PNR
DetailsRick Jackson
alarms not ready. sprinkler riser/PIV not monitored.
INSP - Final1/8/19981/9/19981/9/1998PPASS
Details
01/09/98 333 - OTH-OTHER AGENCIES NOT APPROVED
INSP-Final Inspection1/7/19981/8/19981/9/1998PPART
DetailsRick Jackson
01/08/98 409 - he will call you. checked devices/placement. will test in 1/9/98
INSP - Final1/7/19981/8/19981/8/1998PFAIL
Details
01/08/98 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Sprinkler Rough-in/Hydro12/16/199712/16/199712/16/1997APASS
DetailsRick Jackson
hydro test of anti-freeze system
INSP - Framing/Rough-in12/16/199712/16/199712/16/1997PPASS
Details
12/16/97 333 - BOISE SENIOR CENTER/ LAST PARTIAL OF CH STUD CEILING. WOULD LIKE AROUND 4:00 ceiling ok will check firestops later
INSP - Framing/Rough-in12/11/199712/11/199712/11/1997PPART
Details
12/11/97 333 - CLG -OK CEILING COVER
INSP-Sprinkler Rough-in/Hydro12/10/199712/11/199712/11/1997PCANC
DetailsRick Jackson
12/11/97 409 - ANTI-FREEZE FLUSH--PAGE DOUG AT ###-#### TO MEET YOU doug didn't answer page at 4:00 pm.
INSP-Final Inspection12/4/199712/5/199712/5/1997PPASS
DetailsRick Jackson
after 1:00 Doug ###-#### sprinkler hydro only - passed. not a final inspection for occupancy
INSP - Framing/Rough-in12/2/199712/3/199712/3/1997APASS
Details
12/03/97 333 - ch studs in phase 1 senior center corridor ceilings ok
INSP - Framing/Rough-in11/13/199711/14/199711/14/1997APASS
Details
11/14/97 333 - late am FRAM-OK FRAMING
INSP - Framing/Rough-in11/12/199711/12/199711/12/1997PPART
Details
11/12/97 333 - one side only
INSP - Roof11/6/199711/7/199711/7/1997APASS
Details
11/07/97 333 - ok
INSP - Framing/Rough-in10/31/199711/3/199711/3/1997APASS
Details
11/03/97 333 - roof ok to cover
INSP - Roof10/28/199710/28/199710/28/1997PPASS
Details
10/28/97 333 - mansard ok
INSP - Conference10/23/199710/23/199710/23/1997PPASS
Details
10/23/97 333 - ok on soffit detail
INSP - Carpentry10/10/199710/10/199710/10/1997APASS
Details
10/10/97 333 - resubmittal
INSP - Foundation10/9/199710/9/199710/9/1997PPASS
Details
10/09/97 333 - STEM WALL FDN -OK FOUNDATION
INSP - Footings10/8/199710/8/199710/8/1997PPASS
Details
10/08/97 333 - FTG -OK FOOTING
Issue PAID IN FULL permit  9/25/1997
Plan assigned to (M_P)6/20/1997 8/19/1997 PASS
DetailsMike Phillips
08/19/97 13:38:16 DAR - this action updated by action script from <<>> in Case No. BLD97-0876
PLANS/APPL TAKEN TO FRONT DESK  8/19/1997 PASS
Print Occupancy Form  8/19/1997
Inspection Record Card- Bld  8/19/1997
Print Pending Permit.LaserJet4  8/19/1997 PASS
NEED CONTRACTOR INFORMATION.
Plan Reviewer's activity  8/19/1997 PASS
NEED CONTRACTOR.
Telephone call  8/19/1997
CALLED DEAN..PERMIT READY
Plan resubmittals received  8/14/1997
Received plan resubmittals.
Routing - MECHANICAL  7/15/1997 PASS
PACKAGE #1 FIELD REVIEW.
Routing - FIRE7/1/1997 7/14/1997 PASS
PACKAGE #1
90 day tracking............. 4/10/19977/9/1997
Print Pending Permit.LaserJet4  6/30/1997 FAIL
SENT CORRECTION LIST
Plan Reviewer's activity  6/30/1997 FAIL
sent correction list to architect.
Plan assigned to (RGG)5/30/1997 6/20/1997
Routing Off Site - A.C.H.D6/2/1997 6/11/1997 PASS
PACKAGE #4 CONTACTED DEAN SHULTZ AT ###-#### TO TAKE PLANS OUT TO ACHD. NO IMPACT FEES DUE.
Routing - PLANNING6/6/1997 6/11/1997 PASS
PACKAGE #2 X-REF: AA-37-97, CU-87-78, FPR-10-95. APPROVED BY BB.
Routing - PUBLIC WORKS6/2/1997 6/6/1997 PASS
PACKAGE #2
Routing - ELECTRICAL6/4/1997 6/6/1997 PASS
PACKAGE #1 FIELD VERIFY PER 324.
Routing Off Site - STRUCTURAL6/2/1997 6/4/1997 PEND
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO STAPLEY ENGINEERING CORRECTION LIST RETURNED, FOLLOW UP REVIEW WILL BE DONE BY PLAN REVIEWER AT CITY.
Routing - PLUMBING6/2/1997 6/4/1997 PASS
PACKAGE #1
Plan routing begun/NEW & ADDTN  6/2/1997 PASS
Plans ACCEPTED BY PLAN CHECK  5/30/1997 PASS
PROJECT RECEIVED CUMOD #37-97. RECEIVED ADDITIONAL SET FOR PACKAGE #3 4-11-97.
Gay Receipt For Partial Pay  5/8/1997
FEE REVIEW-NOTES  4/14/1997 FEES
HAD PAID PLAN CHECK. AND BEFORE DEPOSIT THEY TOOK CHECK BACK. TOOK FEES OUT LH
Plans ACCEPTED BY PLAN CHECK  4/11/1997 HOLD
PLANS ARE ON HOLD AWAITING CONFIRMATION FROM P&Z AS TO A DR OR CU BEING REQUIRED. PACKAGE #3 REQUIRES AN ADDITIONAL SET. A SIGNED CERT. OF VALUE IS REQUIRED. I CONTACTED DEAN SHULTZ OF THESE NEEDS AT ###-#### KMM ROBERT HOBBS OF P&Z SAID PLANS REQUIRE A STAFF LEVEL CU MOD. HE CONTACTED DEARN SHULTZ AND TOLD HIM OF THIS NEED. KMM 4-11-97 AMY OF FINANCE CAME UP AND PUT A HOL ON THIS PROJECT. WAY OVER BUDGET, WILL CONTACT MAYORS OFFICE TO SEE IF MORE MONEY IS AVAILABLE OR IF THE PROJECT HAS BEEN DOWNSIZED. DAR 4/11/97
Plan routing begun/NEW & ADDTN  4/11/1997 HOLD
SEE ACTION 007
Received Certificate of Value  4/11/1997 FAIL
CERT. OF VALUE NEEDS TO BE SIGNED. I CONTACTED DEAN SHULTZ AT ###-#### AND TOLD HIM OF THIS NEED. KMM
Received Certificate of Value  4/11/1997 PASS
DEAN SIGNED CERT. OF VALUE.
Application received  4/10/1997
Routing - PLAN CHECK6/11/1997  
PACKAGE #4 NO ACHD FEES DUE.
Routing - PLAN CHECK6/13/1997  
PACKAGE #2
Routing - PLAN CHECK7/15/1997  
PACKAGE #1