CHANGE STATUS TO (I) | | | 9/10/1998 | | |
|
|
|
|
Fee Review-notes | 7/14/1998 | | 9/10/1998 | | DONE |
|
|
|
|
Receive PAYMENT IN FULL | | | 8/13/1998 | | |
|
|
|
|
CHANGE STATUS TO (F) | | | 7/29/1998 | | |
|
|
|
ADD VALUE
|
Permanent occupancy | | | 6/19/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7282 issued 6-19-98 to St. Al's.
|
Permanent Occupancy | | 6/17/1998 | 6/17/1998 | | DONE |
|
|
|
|
INSP - Final | 5/20/1998 | 5/20/1998 | 5/20/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION
|
INSP - Final | 5/20/1998 | 5/21/1998 | 5/12/1998 | A | PASS |
|
|
|
SIGNED THE OCC REQ CARD FINAL AND DELIVERED TO CATHY
|
INSP-Final Inspection | 5/12/1998 | 5/12/1998 | 5/12/1998 | A | PART |
Joe Tawney
|
|
|
05/12/98 406 - ###-#### FINAL ON X RAY ROOM OK STILL NEED MED GAS TEST REPORT TO CLOSE PERMIT
|
INSP - Final | 5/12/1998 | 5/12/1998 | 5/12/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL ON X RAY ROOM FAIL SPKLR HEAD OVERSPACED FROM WALL
|
INSP-Sprinkler Rough-in/Hydro | 2/2/1998 | 2/2/1998 | 2/2/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST
|
INSP - Final | 12/23/1997 | 12/26/1997 | 12/26/1997 | A | PART |
|
|
|
12/26/97 338 - 5TH FLOOR TELEMETRY phase 1- only for temp occ signed the
|
INSP-Final Inspection | 12/23/1997 | 12/24/1997 | 12/26/1997 | A | PASS |
Joe Tawney
|
|
|
12/24/97 406 - 5TH FLOOR TELEMETRY TOWER/ 10:00 APT FINAL OK FOR TEMP OCC
|
INSP-Final Inspection | 12/18/1997 | 12/19/1997 | 12/19/1997 | P | CANC |
Joe Tawney
|
|
|
12/19/97 406 - FINAL NOT READY INSPECTION CANCELLED
|
Print Occupancy Form | | | 12/5/1997 | | |
|
|
|
|
Print Occupancy Form | | | 12/5/1997 | | |
|
|
|
|
INSP - Framing/Rough-in | 10/29/1997 | 10/29/1997 | 10/29/1997 | P | |
|
|
|
NORTH TOWER--5TH FLOOR
|
INSP - Framing/Rough-in | 10/27/1997 | 10/27/1997 | 10/27/1997 | P | PART |
|
|
|
TELEMETRY AT ST AL'S/ 5TH FLOOR this is a partial frame/conference
|
INSP - Framing/Rough-in | 9/26/1997 | 9/29/1997 | 9/29/1997 | A | NR |
|
|
|
09/29/97 338 - not ready for insp want to inspect with 1 layer of rock o
|
Issue PAID IN FULL permit | | | 9/16/1997 | | |
|
|
|
|
(F) Reprint permit | | | 9/16/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/15/1997 | | |
|
|
|
|
testing condition printout | | | 9/15/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/1997 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/15/1997 | | |
|
|
|
|
Telephone call | | | 9/15/1997 | | |
|
|
|
CALLED PAMELA PERMIT READY
|
Routing - PLAN CHECK | 9/12/1997 | | 9/15/1997 | | PASS |
|
|
|
Received final resubmittals. Inserted into plans after review. Processing for issuance of permit.
|
Plan assigned to (DRS) | 4/17/1997 | | 9/12/1997 | | PASS |
Dan Stuart
|
|
|
09/12/97 16:52:54 DRS - this action updated by action script from <<>> in Case No. BLD97-0926
|
Plan resubmittals received | | | 9/11/1997 | | |
|
|
|
Received updated mechanical & electrical plans for smoke fire damper location & controls and design for installation of shower stalls & maintenance of fire rating of floor.
|
Plan resubmittals requested | | | 8/18/1997 | | |
|
|
|
Ask for plan resubmittals of M2-501; 502; & 503 for fire/smoke damper locations & copied architect with previous plan review comments not answered.
|
Routing - PLAN CHECK | 8/15/1997 | | 8/18/1997 | | |
|
|
|
Plans on hold pending architects response to items of original plan review not addressed in his Aug. 1, 1997 response.
|
Telephone call | | | 8/15/1997 | | |
|
|
|
Call from Vince Johnson in behalf of Nick Schou concerning the Telemetry Unit plans, 5th floor North Tower SARMC. I was reviewing the resubmittals of Aug. 1 and composing a letter to cover items not completely addressed in the response. I told Vince some of the items and told him the request for more information would be sent out on Monday Aug. 18.
|
Plan resubmittals received | | | 8/1/1997 | | |
|
|
|
Received resubmittals of electrical sheets in response to Fire Dept. plan review comments. Inserted into plans. Fire Dept. had approved plan as noted.
|
Plan resubmittals received | | | 8/1/1997 | | |
|
|
|
Received resubmittals as supplement in book form for plan check review comments. Concerns of maintaining the fire resistive integrity of the two hou floor system at proposed new shower pan installations were not fully addressed. The architect noted that they were trying to come up with a method of installing the showers without disturbing the floor assembly. The architect & mechanical engineer did not address the smoke/fire damper requirements at penetrations of corridor walls at ducts penetrating the walls and connecting to the VAV boxes located in the corridor. Mechanical engineer made the statement that VAV boxes are not listed for use in corridors as smoke tight units and questioned why I had suggested he provide such evidence if available but he did not address the penetration issue.
|
Routing - FIRE | 6/25/1997 | | 6/27/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/17/1997 | | 6/25/1997 | | |
|
|
|
Finished preliminary plan review. Faxed & mailed copy of corrections to Nick Schou, Gerald R. Nichols & Assoc. Routing plans to F. D. for their review.
|
Plan resubmittals requested | | | 6/25/1997 | | |
|
|
|
Faxed & mailed copy of preliminary plan review to Nick Schou, architect; Dennis Adams, SARMC; Mark VanGulick, Kreizenbeck Constructors.
|
Print Pending Permit.LaserJet4 | | | 6/25/1997 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 6/17/1997 | | 6/17/1997 | | |
Dan Stuart
|
|
|
Picked up plans to begin review.
|
Routing - PLAN CHECK | 4/23/1997 | | 6/17/1997 | | |
|
|
|
Started preliminary plan review process.
|
Routing - PLUMBING | 4/21/1997 | | 4/23/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/17/1997 | | 4/18/1997 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 4/17/1997 | | |
|
|
|
Route to PUBLIC WORKS, PLUMBING then back to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT. (Mark all mechanical plans to be field verified.)
|
Application received | | | 4/16/1997 | | |
|
|
|
|