INSP - Final | 4/20/1998 | 4/20/1998 | 4/20/1998 | P | PASS |
|
|
|
04/20/98 338 - MADE OK L/C ISSUED #014264
|
INSP - Final | 4/17/1998 | 4/17/1998 | 4/17/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION
|
INSP-Final Inspection | 4/9/1998 | 4/10/1998 | 4/10/1998 | A | FAIL |
Joe Tawney
|
|
|
###-####\\cesil\north tower FINAL FAIL ADD ONE STROBE AND MOVE ONE STROBE IN CORRIDOR
|
INSP - Framing/Rough-in | 2/20/1998 | 2/23/1998 | 2/23/1998 | A | PASS |
|
|
|
02/23/98 338 - FRAM-OK FRAMING
|
Issue PAID IN FULL permit | | | 1/14/1998 | | |
|
|
|
|
(F) Reprint permit | | | 1/14/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/9/1998 | | PASS |
|
|
|
|
Telephone call | | | 1/9/1998 | | |
|
|
|
CALLED KRIEZENBECK TOLD AMOUNT DUE
|
Inspection Record Card- Bld | | | 1/9/1998 | | |
|
|
|
|
Print Occupancy Form | | | 1/9/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/9/1998 | | 1/9/1998 | | PASS |
|
|
|
Reviewed resubmittal & inserted into plans. Upgraded scope of permit and plan review notes. Processing for issuance of permit.
|
Plan assigned to (DRS) | 4/24/1997 | | 1/9/1998 | | PASS |
Dan Stuart
|
|
|
01/09/98 12:12:29 DRS - this action updated by action script from <<>> in Case No. BLD97-1020
|
Plan resubmittals received | | | 1/2/1998 | | |
|
|
|
I RECEIVED TWO A1.0 SHEETS. A LETTER TO DAN STUART FROM VINSON M. JOHNSON REGUARDING PLAN COMMENTS FOR LOCKERS AT ST. ALPHONSUS RMC. KMM
|
Telephone call | | | 10/8/1997 | | |
|
|
|
Called Vince Johnson, architect, at ST. Al's. The occupant load for the basement will exceed 30 and most likely 50. This does require two safe ways out of the basement in a rated corridor or through a 2-hr. Horizontal Exit running North to South from floor to floor, that would separate the floor area into two areas and provide two required exists from each area, one through the horizontal exit and one through an adjoining room and then directly into the rated stair enclosure that will exit directly to the exterior. I told Vince that he needed to review the options of a rated corridor or horizontal exit with the hospital staff and provide plans indicating the method they want to use. Vince said he would get back with me shortly. He is at St. Al's since yesterday so he can review the qusetions in the filed with the hospital management staff.
|
Telephone call | | | 10/7/1997 | | |
|
|
|
Received call from Vince Johnson of Gerald R. Nichols Arch. concerning a fax communication he had sent me to review. I told him I would find the fax and review it in house and call him back tommorrow morning. The question remaining to be answered deals with the need for a rated corridor between the two stair enclosures based on the occupant load & uses within the basement for a staff & excercise room locker area and the exercise room plus existing storage areas.
|
90 day tracking............. | | 4/23/1997 | 7/22/1997 | | |
|
|
|
|
Routing - FIRE | 7/9/1997 | | 7/15/1997 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/9/1997 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 7/8/1997 | | 7/9/1997 | | PEND |
|
|
|
Started plan review for this project. Submitted preliminary review comments to architect for response. Routing to Fire Dept for review.
|
Telephone call | | | 7/9/1997 | | PEND |
|
|
|
Phone call from Dave Johnson to clarify questions. He will work at getting an asbuilt floor plan & use of areas for the basement and doing a code analysis and send copies of each to me for review. A corridor will be shown for construction if needed.
|
Plan resubmittals requested | | | 7/9/1997 | | PEND |
|
|
|
Need full basement floor plan indicating use of all areas to determine occupancy & occupant load. A rated corridor for exit purposes may be required. This was noted in the plan review for the August 1994 excercise room permit.
|
Telephone call | | | 7/9/1997 | | |
|
|
|
Phone call to Vince Johnson of Gerald Nochols & Assocs. concerning a full floor plan layout for the basement. Plan submitted shows only the West end layout. The plan also refers to an existing 680 s.f. area as a locker room. This area was permitted in August of 1994 as an excercise room and support area. It was noted on the plan review and response from architect of record that future remodel or additions in the basement area would require the construction of a one hour corridor in the basement between the two required exits. Vince Johnson was on vacation at this time so my call was taken by Dave Johnson. I explained the situation to him and requested a full basement floor plan with use of all areas defined for purpose of determining occupancy classification and occupant load of basement.
|
Routing - PLUMBING | 4/25/1997 | | 4/25/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/24/1997 | | 4/25/1997 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 4/24/1997 | | |
|
|
|
Route to PUBLIC WORKS, PLUMBING then back to PLAN CHECK. After Plan Check route to Fire Department.
|
Plan assigned to (MYS) | 4/23/1997 | | 4/24/1997 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/23/1997 | | PEND |
|
|
|
|
Application received | | | 4/23/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 4/25/1997 | | 7/8/1996 | | |
|
|
|
Picked up plans to start review.
|