Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD97-01044
StatusFinaled
Name ROMANO'S MACARONI GRILL
Site Address 980 N MILWAUKEE ST
Project NameROMANOS MACARONI GRILL
Customer Number 
ePlanReviewNo
Description
TO BUILD A 8,073 SQ. FT. SINGLE STORY TYPE V-N, FULLY FIRE SPRINKLERED RESTAURANT. OTHER WORK INCLUDES ALL SITE IMPROVEMENTS, PAVING & LANDSCAPING AND TRASH ENCLOSURE PER DR24-97, CU13-96MOD, PC228-97. FIRE SPRINKLERS USED FOR AREA AT THIS TIME.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  6/28/1999
Permanent Occupancy 2/20/19982/20/1998 DONE
Details
Code Occupancy Approval  2/20/1998 PASS
All materials on site - border (rail) along south property line being worked, sand and rock for pathway on site - (to be laid 1/28/98), dumpster end. door and man gate being hung while I was there...bicycle rack yet to be picked up - signed temporary without bond. (They will probably be calling for Final Inspection by late tomorrow or Thursday. Everything done EXCEPT Bike Rack is not in (2/6/98). Everything in 2/20/98 - Final
Permanent occupancy  2/20/1998 PASS
Perm. Occ. Cert. #7142 issued 2-20-98 to Romano's Macaroni Grill.
INSP - Final2/19/19982/20/19982/19/1998APASS
Details
02/20/98 338 - pager ###-#### terry other agencies ok
INSP-Final Inspection2/18/19982/19/19982/19/1998APASS
DetailsJoe Tawney
02/19/98 406 - BRINKER REST--TERRY ###-#### REINSP FOR FINAL OK FOR PERM OCC
INSP-Final Inspection1/28/19981/29/19981/29/1998APASS
DetailsJoe Tawney
01/29/98 406 - TERRY ###-#### SECURITY, FIRE ALARM ANCEL FIRE SPRINKLER FINAL OK FOR TEMP OCC FDC ELECT OUTLET EMERG LIGHT PAPERWORK
INSP - Final1/23/19981/29/19981/29/1998PPART
Details
01/29/98 338 - TERRY ###-#### made ok for temp occ signed the temp col o
Temporary occupancy  1/29/1998 PASS
Temp. Occ. Cert. #3544 issued 1-29-98 to Romano's Macaroni Grill.
Code Occupancy Approval  1/23/1998 PEND
requested by: Terry Malarkay ###-#### pager ###-####
INSP-Alarm Testing1/22/19981/22/19981/22/1998PPART
DetailsJoe Tawney
01/22/98 406 - ###-#### mike or terry ALARM TEST OK EXC 2 DET FOR CONTROL PANELS & KEY PAD NOT READING TROUBLE
INSP-Conference1/21/19981/21/19981/21/1998 PASS
ADV CONTR THAT FDC NOT WITHIN 290 FT OF HYDRANT
INSP-Sprinkler Rough-in/Hydro1/16/19981/16/19981/16/1998 PASS
DetailsJoe Tawney
/ / 406 - OK ON SPKLR ROUGHIN & ABOVE GROUND & UNDERGROUND HYDRO TESTS
INSP - Framing/Rough-in1/9/19981/12/19981/12/1998APART
Details
01/12/98 338 - ceiling grid grid ok need attachment for diffusers at fle correction for penetrations of the fire shafts
INSP-Supply line flush11/25/199711/25/199711/25/1997PPART
DetailsJoe Tawney
11/25/97 406 - OK ON UNDERGROUND FLUSH AND PARTIAL ROUGH IN
INSP - Carpentry11/18/199711/19/199711/19/1997ACANC
Details
sent to 333
INSP - Framing/Rough-in11/19/199711/19/199711/19/1997 PART
Details
/ / 333 - walls ok do not hang lids
INSP - Framing/Rough-in11/10/199711/12/199711/12/1997APART
Details
for the shear panels only verbal corrections and request for detailed drawings for tunnel type ceiling
INSP - Foundation9/29/19979/30/19979/30/1997ACANC
Details
09/30/97 338 - e this is for a slab on grade at 13:23:36.
INSP - Foundation9/9/19979/10/19979/10/1997PPASS
Details
09/10/97 338 - made ok withthe sp insp approvalat 15:07:44.
INSP - Foundation9/3/19979/4/19979/4/1997PPASS
Details
09/04/97 338 - MADE OKULED MASN-REBAR OK
INSP - Foundation9/2/19979/3/19979/3/1997PNR
Details
09/03/97 338 - cancelled by the ctr. they will recall
INSP - Footings8/29/19978/29/19978/29/1997 NR
Details
/ / 338 - RESCHEDULED FOR P.M.
INSP - Footings8/28/19978/29/19978/29/1997APASS
Details
08/29/97 338 - OK TO POUR WITH SP INSP APPROVAL MASN-REBAR OKNG FTG -OK FOOTING
(F) Reprint permit  8/25/1997
(F) Reprint permit  8/18/1997
Issue PAID IN FULL permit  8/18/1997
PLANS/APPL TAKEN TO FRONT DESK  8/13/1997 PASS
Telephone call  8/13/1997
NO PHONE NUMBER LEFT FOR LORENZO REYES
Inspection Record Card- Bld  8/13/1997
Print Occupancy Form  8/13/1997
Plan assigned to (M_O)5/19/1997 8/12/1997 PASS
Routing - PUBLIC WORKS7/23/1997 8/8/1997 PASS
PACKAGE #2
Routing Off Site - C.D.H7/15/1997 8/4/1997 PASS
PACKAGE #2 CONTACTED LORENZO REYES AT ###-#### TO TAKE PLANS OUT TO CDH
Routing Off Site - A.C.H.D5/1/1997 8/1/1997 PASS
PACKAGE #4, CONTACTED LORENZO A. REYES (###-####) TO TAKE PLANS TO ACHD. VERBAL RELEASE BY MARCUS GREEN 8/7/97 NO ACHD FEES DUE DAR
Routing Off Site - STRUCTURAL7/9/1997 7/28/1997 PASS
PACKAGE #3 SENT OUT TO CH2MHILL FOR REREVIEW VIA PDQ.
90 day tracking............. 4/25/19977/24/1997
Routing - PLANNING7/3/1997 7/15/1997 PASS
X-REF: CU-13-96 & DR-24-97. APPROVED BY RLB & MGS.
Routing - PLUMBING7/10/1997 7/15/1997 PASS
PACKAGE #1
Plan resubmittals received  7/2/1997
Plan resubmittals received  6/23/1997
RESUBMITTALS FOR PKG 1
Routing - PUBLIC WORKS5/23/1997 6/9/1997 FAIL
PACKAGE #2 NEED NEW BAR LAYOUT AFTER SUBMITTED TO THE BUILDING DEPARTMENT. BAD DRAINAGE PLAN INCOMPLETE. CS REQUIRES PROOF OF LEGAL SUBDIVISION R.
Routing - FIRE6/2/1997 6/9/1997 PASS
PACKAGE #1
Plan resubmittals requested  6/2/1997 FAIL
corrections mailed and faxed to architect and project coordinator.MO
Routing Off Site - STRUCTURAL4/28/1997 5/29/1997 FAIL
SENT TO CH2MHILL VIA PDQ. 4/28/97 05-29-97 STRUCTURAL FAILED GAVE TO PLAN CHECKER
Routing - PLANNING5/15/1997 5/22/1997 FAIL
PACKAGE #2 X-REF: CU-13-96/MOD, DR-24-97. CU IS APPROVED BY BB. DR LANDSCAPE DESIGN WILL CHANGE DUE TO ACHD ROW & ADJUSTMENT OF PROPERTY LINE. ALSO DON BELTS DISCUSSED A NUMBER OF DESIGN ISSUES AND WILL BE REVISING THE LANDSCAPE PLAN.
Plan assigned to (RGG)4/28/1997 5/19/1997
Routing Off Site - C.D.H5/1/1997 5/15/1997 PASS
PACKAGE #2 CONTACTED LORENZO REYES AT ###-#### TO TAKE PLANS OUT TO CDH VIA PDQ.
Routing - PLUMBING5/6/1997 5/9/1997 FAIL
PACKAGE #2
Routing - ELECTRICAL4/28/1997 5/6/1997 PASS
PACKAGE #1
Plans ACCEPTED BY PLAN CHECK  5/1/1997 PASS
Plan routing begun/NEW & ADDTN  5/1/1997 PASS
PACKAGES #2 AND #4
Plans ACCEPTED BY PLAN CHECK  4/28/1997 PEND
PACKAGE #1 ROUTED, PACKAGE #2 0N HOLD AWAITING 2 SETS OF DRAINAGE PLANS AND 1 SET OF DRAINAGE CACULATIONS, PACKAGE #3 ROUTED AND PACKAGE #4 ON HOLD AWAITING 2 SET OF DRAINAGE PLANS AND ONE SET OF DRAINAGE CACULATIONS. DAR 4/28/97, LORENZO A. REYES ADVISED OF MISSING PLANS AND CACULATIONS ON 4/24/97 DAR. PACKAGE #2 ALSO REQUIRES 2 SETS OF A-4 THRU A-7 SHEETS AND 2 SETS OF K-4 ELEVATIONS SHEETS. 4-28-97 RECEIVED FOR PACKAGE #2 DRAINAGE CALCS. AND TWO SETS OF SHEETS A-4 THRU A-7. RECEIVED K-4 SHEETS 5-1-97 RECEIVED 2 MORE GRADING SHEETS FOR DRAINAGE SHEETS I GUESS. WILL ROUTE TO CDH, PW, AND P&Z ANYWAY.
Plan routing begun/NEW & ADDTN  4/28/1997 PASS
PACKAGES #1 AND #3
Recd Pcfee & Taken To Pln CK  4/25/1997
Application received  4/25/1997