Case Summary (BLD) | | | 5/22/2003 | | |
|
|
|
|
DOC - Permit Finaled | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 1/24/2001 2:27:00 PM
|
Fee Review-notes | 11/20/1998 | | 12/15/1998 | | |
|
|
|
|
INSP - Final | 7/21/1998 | 7/21/1998 | 7/21/1998 | P | PASS |
|
|
|
FINALED AS PER 338/LC ISSUED BY PERRY
|
INSP - Final | 6/22/1998 | 6/22/1998 | 6/22/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION
|
Routing Off Site - A.C.H.D | 4/29/1997 | | 6/6/1998 | | PENG |
|
|
|
PACKAGE #4 CONTACTED CRICKET AT ###-#### TO TAKE PLANS OUT TO ACHD PASSED, ACHD IMPACT FEES DUE.6/8/97
|
Code Occupancy Approval | | | 5/21/1998 | | PASS |
|
|
|
Complies w/ DRH97-0043 - PASS
|
INSP - Final | 5/11/1998 | 5/11/1998 | 5/11/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR TEMP
|
INSP - Temporary occupancy | 5/11/1998 | 5/11/1998 | 5/11/1998 | | PASS |
|
|
|
/ / 338 - MADE OK OTHER SIGNOFFS OK
|
INSP-Final Inspection | 5/6/1998 | 5/8/1998 | 5/8/1998 | A | FAIL |
Joe Tawney
|
|
|
05/08/98 406 - ###-#### FINAL SHELL FAIL ALARM SYSTEM
|
INSP-Sprinkler Rough-in/Hydro | 10/23/1997 | 10/23/1997 | 10/23/1997 | P | PART |
Joe Tawney
|
|
|
10/23/97 406 - PUMPED UP OK ON HYDRO TEST OF FDC PIPING
|
INSP-Sprinkler Rough-in/Hydro | 10/21/1997 | 10/22/1997 | 10/23/1997 | P | PART |
Joe Tawney
|
|
|
10/22/97 406 - OK ON HYDRO TEST EXCEPT FOR FDC PIPING
|
INSP-Supply line flush | 10/20/1997 | 10/20/1997 | 10/20/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - 0K ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 9/30/1997 | 10/1/1997 | 10/1/1997 | A | PART |
|
|
|
10/01/97 338 - c/n issued ok to start cover
|
INSP - Framing/Rough-in | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | PART |
|
|
|
08/26/97 338 - ROOF NAILING ONLY MADE OK
|
INSP - Framing/Rough-in | 8/20/1997 | 8/20/1997 | 8/20/1997 | | CANC |
|
|
|
08/20/97 338 - perimeter roof sheathing ok ok to install crickets
|
90 day tracking............. | | 4/25/1997 | 7/24/1997 | | |
|
|
|
|
INSP - Foundation | 7/9/1997 | 7/9/1997 | 7/9/1997 | P | PASS |
|
|
|
07/10/97 338 - MADE OK WITH SP INSP APPROVAL
|
INSP - Footings | 7/8/1997 | 7/8/1997 | 7/8/1997 | P | PASS |
|
|
|
07/08/97 338 - made ok MASN-REBAR OK sp insp ok
|
INSP - Footings | 7/3/1997 | 7/7/1997 | 7/7/1997 | A | PASS |
|
|
|
07/07/97 338 - pouring at 10 a.m. first 1/2 MASN-REBAR OK FTG -OK FOOTING sp insp ok
|
(F) Reprint permit | | | 6/16/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/12/1997 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/12/1997 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/1997 | | |
|
|
|
|
Print Occupancy Form | | | 6/12/1997 | | |
|
|
|
|
Telephone call | | | 6/12/1997 | | PASS |
|
|
|
CALLED AND WENT OVER FEES WITH JOHNATHAN
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/23/1997 | | 6/11/1997 | | |
|
|
|
PACKAGE #2
|
Routing - PLAN CHECK | 6/8/1997 | | 6/11/1997 | | |
|
|
|
PACKAGE # 4
|
Routing - PUBLIC WORKS | 5/27/1997 | | 6/6/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/29/1997 | | 5/29/1997 | | PASS |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL ATTEN: CRAIG BARRETT. 05-29-97 PACKAGE THREE TO PLAN CHECKER.
|
INSP-Conference | 5/28/1997 | 5/28/1997 | 5/28/1997 | P | PASS |
|
|
|
reviewed and approved hydrant locations
|
Routing - PLANNING | 5/8/1997 | | 5/23/1997 | | PASS |
|
|
|
PACKAGE #2 X-REF: DR-43-97. APPROVED AS NOTED BY TKW.
|
Routing - FIRE | 5/14/1997 | | 5/15/1997 | | PASS |
|
|
|
PACKAGE #1
|
Plan assigned to (RGG) | 4/29/1997 | | 5/14/1997 | | PASS |
|
|
|
PC #231-97
|
Routing - PLAN CHECK | 5/8/1997 | | 5/14/1997 | | |
|
|
|
|
Routing - ELECTRICAL | 4/30/1997 | | 5/7/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 4/29/1997 | | 5/5/1997 | | FAIL |
|
|
|
PACKAGE #2 REQUIRES DRAINAGE PLAN REVISION. CS UTILITY PLAN NECESSARY SHOWING SEWER SYSTEM
|
Routing - PLUMBING | 4/29/1997 | | 4/30/1997 | | PASS |
|
|
|
PACKAGE #1
|
Plans ACCEPTED BY PLAN CHECK | | | 4/29/1997 | | PASS |
|
|
|
RECEIVED ALL REQUESTS FROM CRICKET CONCERNING A700 HOLD
|
Plan routing begun/NEW & ADDTN | | | 4/29/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 4/25/1997 | | 4/29/1997 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/25/1997 | | HOLD |
|
|
|
PACKAGES INCOMPLETE: FAX SENT TO CRICKET AND W.H. MOORE CO. REQUESTING 1) PACKAGE 1 NEEDS CIVIL SHEET DTL SIGNED BY BRIGGS. PLUMBING OK IT IS ON MECH. SHEETS. 2) PACKAGE 2 NEEDS CIVIL SHEET DTL SIGNED BY BRIGGS AND 2 SETS OF LANDSCAPE PLANS, AND TWO SETS OF MECH. PLANS. 3) PACKAGE 3 NEED AN ADDITIONAL THIRD SET, AND SOILS REPORT 4) PACKAGE 4 NEED CIVIL SHEET DTL SIGNED BY BRIGGS. KMM
|
Recd Pcfee & Taken To Pln CK | | | 4/25/1997 | | |
|
|
|
|
Application received | | | 4/25/1997 | | |
|
|
|
|