CHANGE STATUS TO (I) | | | 4/19/1999 | | |
|
|
|
|
Receive PAYMENT IN FULL | | | 4/16/1999 | | |
|
|
|
|
(F) Reprint permit | | | 3/1/1999 | | |
|
|
|
|
(F) Reprint permit | | | 9/9/1998 | | |
|
|
|
|
CHANGE STATUS TO (F) | | | 9/9/1998 | | |
|
|
|
ADDITIONAL VALUE SENT TO GC THEY CALLED AND SAID THEY DIDN'T PAY PERMITS THAT THIS SCOTT SHEAD IS TO PAY PERMIT LH 2/3/99
|
Fee Review-notes | 9/9/1998 | | 9/9/1998 | | FEE |
|
|
|
ADDITIONAL FEES
|
INSP - Final | 6/26/1998 | 6/29/1998 | 6/29/1998 | A | NR |
|
|
|
06/29/98 338 - blaine ###-#### NOT READY OCC REQ CARD NOT ON SITE
|
INSP - Conference | 6/29/1998 | 6/29/1998 | 6/29/1998 | | PART |
|
|
|
/ / 338 - TO SET UP TIME FOR P.M.INSPECTION
|
INSP - Final | 6/22/1998 | 6/23/1998 | 6/24/1998 | A | FAIL |
Jim Storey
|
|
|
06/24/98 301 - final blaine/###-####
|
INSP - Final | 6/10/1998 | 6/11/1998 | 6/11/1998 | A | PART |
|
|
|
06/12/98 338 - Office ###-#### Pager ###-#### Allan Reeser he will be around in the morning to meet you out there
|
INSP - Conference | 5/13/1998 | 5/13/1998 | 5/13/1998 | | PART |
|
|
|
/ / 338 - TEST OF EMERGENCY SYSTEMS FOR SMOKE EVAC SPRINKS AND ALARMS.
|
INSP-Alarm Testing | 4/30/1998 | 5/13/1998 | 5/13/1998 | A | PART |
Joe Tawney
|
|
|
05/13/98 406 - ALAN/###-#### - WITNESS AND TEST OF ALARM SYSTEM. 9AM REQ ALARM SYSTEM OK EXC RECALIBRATE BEAM DETECTOR & REPROGRAM MANUAL SWITCHE
|
INSP - Framing/Rough-in | 4/22/1998 | 4/22/1998 | 4/22/1998 | P | PART |
|
|
|
04/22/98 338 - ###-####/ALAN - RE-INSP. ON ABOVE CEILING GRID.
|
INSP-Sprinkler Rough-in/Hydro | 4/17/1998 | 4/17/1998 | 4/17/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST
|
INSP - Framing/Rough-in | 4/16/1998 | 4/17/1998 | 4/17/1998 | A | PART |
|
|
|
04/17/98 338 - C/N MADE OK TO DROP IN TILE IINFO CO COME BY FAX ABOVE DR
|
INSP-Supply line flush | 3/31/1998 | 3/31/1998 | 3/31/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Foundation | 3/9/1998 | 3/10/1998 | 3/11/1998 | P | PASS |
|
|
|
03/11/98 338 - footings not ready will recall will be ok to pour with sp
|
INSP - Framing/Rough-in | 3/9/1998 | 3/10/1998 | 3/11/1998 | A | PART |
|
|
|
03/11/98 338 - partial framing allen ###-#### restrooms expansion made o
|
INSP - Conference | 3/10/1998 | 3/10/1998 | 3/10/1998 | | PASS |
|
|
|
/ / 338 - contr. changed insp on frame till early p.m. to be done with
|
INSP-Sprinkler Rough-in/Hydro | 3/6/1998 | 3/9/1998 | 3/9/1998 | A | PART |
Joe Tawney
|
|
|
03/09/98 406 - BATHROOM AREA 2ND FLOOR NORTH EAST CORNER ERICK ###-#### OK ON ROUGH IN FOR 2ND FLOOR
|
INSP - Framing/Rough-in | 2/18/1998 | 2/18/1998 | 2/18/1998 | P | NH |
Wes Worcester
|
|
|
02/18/98 342 - EXPANSION--ALAN ###-####--PARTIAL reached answering machi
|
INSP - Framing/Rough-in | 2/16/1998 | 2/17/1998 | 2/18/1998 | A | PART |
Wes Worcester
|
|
|
02/17/98 342 - screw off bottom plate, address penetrations in 1 hr corr blocking
|
INSP - Conference | 1/30/1998 | 2/3/1998 | 2/3/1998 | P | PASS |
|
|
|
02/03/98 338 - ###-#### 2:30 is the appointment doug t. (arch) will be there also
|
INSP - Framing/Rough-in | 1/20/1998 | 1/21/1998 | 1/21/1998 | A | PASS |
|
|
|
01/21/98 338 - MASONARY\ALAN ###-#### ok to pour with spcl insp approva
|
INSP - Framing/Rough-in | 1/9/1998 | 1/9/1998 | 1/9/1998 | P | PART |
|
|
|
01/09/98 338 - ###-#### Allen grouting at 2pm masonry wall Strata willbe SP INSP APPROVAL
|
INSP - Conference | 12/11/1997 | 12/11/1997 | 12/12/1997 | P | PASS |
|
|
|
12/12/97 338 - met with allen walked the remodel anmd the project ok to floor when weather protection is in place. the special inspector is wit charge to confirm compliance
|
INSP - Framing/Rough-in | 12/10/1997 | 12/11/1997 | 12/12/1997 | A | PART |
|
|
|
12/11/97 338 - 2ND FLOOR alan called cancelled till tomorrow
|
INSP - Miscellaneous | 11/28/1997 | 12/1/1997 | 12/1/1997 | A | PASS |
|
|
|
12/01/97 338 - GROUT--ENGINEER LOOKING AT THIS ALSO made ok with the eng
|
INSP - Foundation | 10/2/1997 | 10/2/1997 | 10/2/1997 | P | PASS |
|
|
|
10/02/97 338 - SLAB-OK SLAB
|
INSP - Foundation | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PASS |
|
|
|
09/23/97 338 - MADE OK WITH THE BLESSING OF THE SPECIAL INSPECTOR
|
INSP - Carpentry | 9/17/1997 | 9/18/1997 | 9/18/1997 | A | FAIL |
|
|
|
09/18/97 338 - 12 foot to the south end and tapered to the north end ble c/n issued for the eng of record to submit fix and demo proceedures prio reconstruction. also stated ubc 3303 for pedestrial protection
|
INSP - Carpentry | 9/17/1997 | 9/17/1997 | 9/17/1997 | P | PASS |
|
|
|
09/17/97 338 - SPECIAL INSPECTION AT 12:00 AND 4:00 made ok with sp insp
|
INSP - Masonry | 9/16/1997 | 9/16/1997 | 9/16/1997 | | PASS |
|
|
|
/ / 338 - for grout cells and reinforcing ok with sp insp approval
|
INSP - Framing/Rough-in | 9/16/1997 | 9/16/1997 | 9/16/1997 | P | CANC |
|
|
|
09/16/97 338 - SPE. INSPECTOR WILL BE THERE AT 1:30 should be a masonry
|
INSP - Masonry | 9/15/1997 | 9/15/1997 | 9/15/1997 | | PASS |
|
|
|
/ / 338 - bond beam and rebar
|
INSP - Framing/Rough-in | 9/12/1997 | 9/15/1997 | 9/15/1997 | P | CANC |
|
|
|
09/15/97 338 - SPECIAL INSPECTIONthis is to be a masonry
|
INSP - Masonry | 9/15/1997 | 9/15/1997 | 9/15/1997 | | PASS |
|
|
|
/ / 338 - for p.m. bond beam r-bar and grout made ok only with sp insp approval
|
INSP - Framing/Rough-in | 9/12/1997 | 9/15/1997 | 9/15/1997 | A | CANC |
|
|
|
09/15/97 338 - CENTER BLOCK GROUTING SPECIAL INSPECTOR AT 10:30 AND 3:30 masonry grout and reinf
|
INSP - Masonry | 9/15/1997 | 9/15/1997 | 9/15/1997 | | PASS |
|
|
|
/ / 338 - for bond beam and reinf MASN-REBAR OK
|
INSP - Masonry | 9/14/1997 | 9/14/1997 | 9/14/1997 | | PASS |
|
|
|
/ / 338 - north wall to the 12' ele +- with sp insp approval
|
INSP - Miscellaneous | 9/11/1997 | 9/12/1997 | 9/14/1997 | A | PASS |
|
|
|
09/12/97 338 - made ik with sp inspa pproval MASN-REBAR OK
|
INSP - Masonry | 9/11/1997 | 9/11/1997 | 9/11/1997 | | PART |
|
|
|
/ / 338 - west wall to the 17' level ok with sp insp approval
|
INSP - Foundation | 9/11/1997 | 9/11/1997 | 9/11/1997 | P | CANC |
|
|
|
09/11/97 338 - GROUTING MASNORY WALLS SPEC. INSPECTOR GROUTING AT 4 P.M. this sjould be a masonry insp
|
INSP - Framing/Rough-in | 9/10/1997 | 9/10/1997 | 9/10/1997 | P | CANC |
|
|
|
09/10/97 338 - Scheduled by Hello! on 09/10/97 at 08:42:30. pouring concrete for masonery walls
|
INSP - Masonry | 9/10/1997 | 9/10/1997 | 9/10/1997 | | PART |
|
|
|
/ / 338 - poured the 2nd bond bea at the 8-0"level west wall only
|
INSP - Wall cover | 9/9/1997 | 9/9/1997 | 9/9/1997 | P | PART |
|
|
|
09/09/97 338 - CONCRETE MASONARY WALL HE WILL HAVE A SPECIAL INSPECTOR A need to have confomation of the lack f bond beam over the doorways plan calls for solid grouting to the 8'-0" height.
|
INSP - Miscellaneous | 9/8/1997 | 9/9/1997 | 9/9/1997 | A | PASS |
|
|
|
09/09/97 338 - cinderblock MASN-REBAR OK
|
Print Occupancy Form | | | 9/8/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/1997 | | PASS |
|
|
|
|
(F) Reprint permit | | | 9/8/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/8/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/8/1997 | | |
|
|
|
|
Plan assigned to (JCM) | 6/4/1997 | | 9/8/1997 | | PASS |
John Menard
|
|
|
WHEN PROJECT WAS ASSIGNED ONLY THE STRUCTURAL PLAN SETS WERE AVAILABLE, THE FULL PROJECT PLANS SETS WERE STILL BEING ROUTED; I DID NOT RECEIVE THE PLANS FOR REVIEW UNTIL 7/18/97.
|
Routing - PLAN CHECK | 8/4/1997 | | 9/8/1997 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/5/1997 | | PASS |
|
|
|
PLAN REVISIONS RECEIVED IN RESPONSE TO TELEPHONE CONVERSATION 09/03/97.
|
Received Certificate of Value | | | 9/4/1997 | | PASS |
|
|
|
RECEIVED CERTIFICATE OF VALUE FROM INTERWEST CONSTRUCTION.
|
Telephone call | | | 9/3/1997 | | PEND |
|
|
|
I CALLED DOUGLAS THOMPSON AT LAW/KINGDON TO ADVISE HIM THAT ADDITIONAL PLAN REVISIONS WERE REQUIRED BASED ON HIS DETEMININATION THAT ALL MALL EXITWAYS WOULD BE DESIGNATED AS EXIT PASSAGEWAYS. AFTER FURTHER DISCUSSION MR. THOMPSON DETERMINED TO ONLY DESIGNATE CERTAIN EXITWAYS AS EXIT PASSAGEWAYS AND AGREED TO SEND REVISED PLANS INDICATING THIS CHANGE THE FOLLOWING DAY. I GAVE HIM THE ANTICIPATED PERMIT DOLLAR AMOUNT AND AGREED TO CONTINUE TO PROCESS THE PERMIT APPLICATION SO THAT IT WOULD BE READY WHEN THE REVISED PLANS ARRIVED. I ALSO REMINDED HIM THAT THE ACHD IMPACT FEES HAD NOT YET BEEN PAID. HE SAID HE THOUGHT THAT THE HIGHWAY DISTRICT HAD AGREED TO WAIVE THE FEES. I TOLD HIM WE WOULD NEED A VERIFICATION LETTER FROM ACHD INDICATING THAT THE FEES HAD BEEN WAIVED.
|
Plan resubmittals received | | | 8/29/1997 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 8/22/1997 | | PEND |
|
|
|
|
Plan resubmittals received | | | 8/14/1997 | | PEND |
|
|
|
|
Routing Off Site - A.C.H.D | 6/30/1997 | | 8/13/1997 | | PASS |
|
|
|
CONTACTED ALLEN REESER AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES NOT PAID 7/9/97. DAR - THE IMPACT FEES FOR THE MALL EXPANSION WAS WAIVED BY THE ADA COUNTY HIGHWAY DISTRICT AT THEIR JULY 2, 1997 COMMISSIONER'S MEETING. (SEE CONFIRMATION LETTER FROM MARKUS GREEN DATED AUGUST 13, 1997) JCM
|
Routing - FIRE | 7/31/1997 | | 8/4/1997 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 7/30/1997 | | PEND |
|
|
|
CORRECTION LIST MAILED TO ARCHITECT (DOUGLAS THOMAS)
|
Routing - PLAN CHECK | 7/18/1997 | | 7/30/1997 | | PEND |
|
|
|
|
90 day tracking............. | | 4/29/1997 | 7/28/1997 | | |
|
|
|
|
Routing - MECHANICAL | 7/18/1997 | | 7/18/1997 | | PASS |
|
|
|
NO REVIEW WILL FIELD VERIFY
|
Routing - PLUMBING | 7/11/1997 | | 7/17/1997 | | PASS |
|
|
|
|
Routing - ELECTRICAL | 7/9/1997 | | 7/11/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/11/1997 | | 7/11/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/11/1997 | | 6/23/1997 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISIONS (ODI 1160)
|
Routing - PLAN CHECK | 5/13/1997 | | 6/11/1997 | | |
|
|
|
ENGINEER COPIES.
|
Routing - PLANNING | 4/30/1997 | | 6/10/1997 | | PASS |
|
|
|
X-REF: CU-106-85,DR-147-96. APPROVED BY RLB & TKW.
|
Plan assigned to (RGG) | 4/29/1997 | | 6/4/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/1997 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/30/1997 | | 5/14/1997 | | |
|
|
|
CALLED PDQ TO TAKE 3 SETS OF STRUCTURAL PLANS OUT TO STAPLEY ENGINEERING. 5-8-97 Received a revised letter with engineers stamp and signature, for soils report. kmm Faxed over to Stapley engineering.
|
Plan routing begun/NEW & ADDTN | | | 4/30/1997 | | PASS |
|
|
|
|
Received Certificate of Value | | | 4/29/1997 | | PASS |
|
|
|
|
Application received | | | 4/29/1997 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/29/1997 | | PASS |
|
|
|
|