INSP-Final Inspection | 8/25/1997 | 8/29/1997 | 8/29/1997 | A | PART |
Joe Tawney
|
|
|
08/29/97 406 - hydro final OK ON HYDRO TEST OF 2 SYSTEMS NEED HYDRO ON FDC PIPING OK ON ROUGH IN OF SYSTEMS
|
INSP-Final Inspection | 8/25/1997 | 8/28/1997 | 8/28/1997 | A | CANC |
Joe Tawney
|
|
|
08/27/97 406 - hydro finish CANCELED RESCH FOR 8/29/97
|
INSP-Supply line flush | 8/22/1997 | 8/25/1997 | 8/25/1997 | P | PART |
Joe Tawney
|
|
|
08/25/97 406 - WILL CALL YOU IN MORNING TO CHECK WITH YOU.... OK ON UNDERGROUND FLUSH FOR EAST SHELL BLDG
|
INSP-Final Inspection | 8/22/1997 | 8/22/1997 | 8/22/1997 | P | PART |
Joe Tawney
|
|
|
08/22/97 406 - OK ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 8/18/1997 | 8/19/1997 | 8/19/1997 | A | CANC |
|
|
|
08/19/97 338 - not required for commercial const
|
INSP - Framing/Rough-in | 8/11/1997 | 8/12/1997 | 8/11/1997 | A | PASS |
|
|
|
08/12/97 338 - INSULATION OK TO COVER THE EXT WALL FURRING
|
INSP - Framing/Rough-in | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | PASS |
|
|
|
08/08/97 338 - partial on the canopies (sp) madeok with ele insp approva
|
90 day tracking............. | | 5/1/1997 | 7/30/1997 | | PEND |
|
|
|
|
INSP - Masonry | 7/8/1997 | 7/9/1997 | 7/9/1997 | A | PASS |
|
|
|
07/10/97 338 - GROUT MASN-REBAR OK OK WITH SP INSP APPROVAL
|
INSP - Masonry | 7/8/1997 | 7/8/1997 | 7/8/1997 | P | PASS |
|
|
|
07/08/97 338 - made ok with sp insp aproval
|
INSP - Foundation | 7/8/1997 | 7/8/1997 | 7/8/1997 | P | PASS |
|
|
|
07/08/97 338 - made ok with sp insp qapproval MASN-REBAR OK
|
INSP - Foundation | 7/1/1997 | 7/1/1997 | 7/1/1997 | P | PASS |
|
|
|
07/01/97 338 - made ok with sp insp approval
|
INSP - Footings | 6/30/1997 | 6/30/1997 | 7/1/1997 | P | PASS |
|
|
|
06/30/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/25/1997 | 6/25/1997 | 6/25/1997 | P | PASS |
|
|
|
06/25/97 338 - made ok with sp insp approval
|
INSP - Footings | 6/23/1997 | 6/24/1997 | 6/24/1997 | P | PASS |
|
|
|
06/24/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/23/1997 | 6/23/1997 | 6/23/1997 | P | PASS |
|
|
|
06/23/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/19/1997 | 6/20/1997 | 6/20/1997 | P | PART |
Tom Arcoraci
|
|
|
STEM WALL spec insp
|
INSP - Footings | 6/18/1997 | 6/19/1997 | 6/19/1997 | P | PASS |
|
|
|
06/19/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/17/1997 | 6/18/1997 | 6/18/1997 | A | PASS |
|
|
|
06/18/97 338 - made ok with sp insp approva;
|
INSP - Footings | 6/13/1997 | 6/16/1997 | 6/16/1997 | A | PART |
|
|
|
06/16/97 338 - partial made ok south wall engineering to follow for chan
|
(F) Reprint permit | | | 6/16/1997 | | |
|
|
|
|
Plan assigned to (M_O) | 6/2/1997 | | 6/13/1997 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 6/13/1997 | | |
|
|
|
|
Print Occupancy Form | | | 6/13/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/13/1997 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/13/1997 | | |
|
|
|
Received pkg one back from fire on 6-12-97. Reviewed resubmittals from 6-5-97 and completed processing plans. on 6-13-97 MO.
|
Routing - PLAN CHECK | 6/12/1997 | | 6/13/1997 | | PASS |
|
|
|
PACKAGE #1
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/20/1997 | | 6/13/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing Off Site - STRUCTURAL | 5/7/1997 | | 6/13/1997 | | PASS |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL FOR OUTSIDE ENGINEERING. SOILS REPORT NEEDS TO BE STAMPED AND SIGNED RECEIVED STAMPED AND SIGNED TITLE PAGES FOR PACKAGE #3 5-7-97
|
Received Certificate of Value | | | 6/12/1997 | | |
|
|
|
Received final certificate of value MO.
|
Routing - FIRE | 6/10/1997 | | 6/10/1997 | | PASS |
|
|
|
PACKAGE #1
|
Plan resubmittals received | | | 6/6/1997 | | |
|
|
|
Letter received from JP Realty, Inc. dated June 3, 1997 stating that they (the owner BTS Properties, L.C.) have no intention of subdividing the property in any fashion.
|
Plan resubmittals received | | | 6/5/1997 | | |
|
|
|
|
Plan resubmittals requested | | | 6/3/1997 | | FAIL |
|
|
|
PLAN REVIEW FAXED AND MAILED TO ARCHITECT. MO
|
Plan assigned to (RGG) | 5/5/1997 | | 6/2/1997 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 5/7/1997 | | 5/28/1997 | | PEND |
|
|
|
PACKAGE #4 CONTACTED SCOTT HENSON AT ###-#### TO TAKE PLANS OUT TO ACHD. ACHD FEES NOT PAID.
|
Routing - PLUMBING | 5/23/1997 | | 5/23/1997 | | PASS |
|
|
|
package #1
|
Routing - PLAN CHECK | 5/16/1997 | | 5/23/1997 | | |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 5/13/1997 | | 5/16/1997 | | PASS |
|
|
|
PACKAGE #2 X-REF: CU-97-95 & DR-38-97. APPROVED BY BB.
|
Routing - ELECTRICAL | 5/12/1997 | | 5/16/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 5/7/1997 | | 5/13/1997 | | PASS |
|
|
|
PACKAGE #2
|
Plan resubmittals received | | | 5/13/1997 | | |
|
|
|
PLUMBING RESUBS C6 SHEETS PUT WITH PLANS PACKAGE #2
|
Routing - PLUMBING | 5/7/1997 | | 5/12/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Plan routing begun/NEW & ADDTN | | | 5/7/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/7/1997 | | PASS |
|
|
|
RECEIVED SIX SITE PLANS AND STAMPED AND SIGNED SOILS TITLE SHEETS FOR PACKAGE #3
|
Plan assigned to (MYS) | 5/1/1997 | | 5/5/1997 | | |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 5/5/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/5/1997 | | HOLD |
|
|
|
PACKAGES #1,2,&,4 REQUIRE SITE PLANS (SIX TOTAL) PACKAGE #3 NEEDS SOILS REPORT TO BE STAMPED AND SIGNED. CONTACTED SCOTT HENSON OF THESE NEEDS.
|
Plan routing begun/NEW & ADDTN | | | 5/5/1997 | | HOLD |
|
|
|
SEE ACTION 007
|
Application received | | | 5/1/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/1/1997 | | |
|
|
|
|