Permit Information
Permit NumberBLD97-01218
StatusFinaled
Name DILLARDS DEPARTMENT STORE
Site Address 430 N MILWAUKEE ST
Project NameBTS - DILLARD'S
Customer Number 
ePlanReviewNo
Description
DILLARD'S DEPARTMENT STORE * SHELL PACKAGE FOR DILLARD'S BUILDING ONLY AND LANDSCAPE ADJACENT TO THE DILLARD'S BUILDING. BUILDING IS A 186540SF, THREE STORY WITH CONCRETE DECKS, NON-RATED EXTERIOR WALLS OF METAL STUDS WITH MASONRY VENEER AND OR EIFS SIDING, 4 HOUR AREA SEPARATION WALL AT MALL, FOUR STAIR ENCLOSURES, ONE ESCALATOR, ONE PASSENGER ELEVATOR, ONE FREIGHT ELEVATOR, A SUPPLY RECIEVING AREA, REST ROOMS, EQUIPMENT ROOMS PER APPROVED PLANS. DR#147-96 AND DR#16-97 CU#8-96 AND CU#106-86/MOD (PC#257-97) PARKING LOT, GRADING AND DRAINAGE UNDER PERMIT BLD97-1168. THIS PROJECT IS SUBJECT TO APPROVAL BY THE FIRE DEPARTMENT OF THE SECURITY DOORS AT THE MAIN ENTRANCES AND FIRE HYDRANTS. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT, A SEPARATE TENANT IMPROVEMENT PERMIT MUST BE OBTAINED PRIOR TO GRANTING OCCUPANCY. PRP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  8/5/1998
INSP - Final7/21/19987/22/19987/24/1998APASS
Details
07/22/98 338 - l/c Nd occ cert delivered
Letter of compliance  7/24/1998 PASS
Letter of Compliance #15804 issued 7-24-98.
Code Occupancy Approval  7/24/1998 PASS
Complies with CU's & DR-147-96/DRH97-0016- Signed Final
Receive PAYMENT IN FULL PRINT  7/24/1998
INSP-Final Inspection7/23/19987/23/19987/23/1998PPASS
DetailsJoe Tawney
07/23/98 406 - connie ###-#### REINSP OK FOR CERT OF COMPLETION ON SHELL
Temporary occupancy  7/7/1998 PASS
Temp. Occ. Cert. #3651 issued 7-7-98 to Dillard's Dept. Store.
INSP - Final7/2/19987/2/19987/2/1998 PART
DetailsJoe Tawney
/ / 406 - FINAL OK FOR TEMP ON SHELL
INSP - Final6/17/19986/17/19986/17/1998 PART
DetailsJoe Tawney
/ / 406 - FINAL ON SPKLR SYSTEM ALARMS OK
INSP-Conference6/10/19986/10/19986/10/1998 PART
DetailsJoe Tawney
/ / 406 - WALK THRU OF 2ND AND 3RD FLOORS WITH PERRY AND GEN CONTR
INSP-Sprinkler Rough-in/Hydro6/4/19986/4/19986/4/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR HYDRO TEST FOR 1ST FLOOR
INSP-Sprinkler Rough-in/Hydro5/29/19985/29/19985/29/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON HYDRO TESTS FOR 2ND AND 3RD FLOORS
INSP-Supply line flush4/16/19984/16/19984/16/1998 PART
OK ON UNDERGROUND FLUSH
INSP-Sprinkler Rough-in/Hydro3/27/19983/27/19983/27/1998 PASS
DetailsJoe Tawney
/ / 406 - OK ON ROUGH IN OF FIRST FLOOR RISERS NOT YET INSTALLED
INSP - Framing/Rough-in1/20/19981/21/19981/21/1998APART
Details
this is a job review conference only
INSP-Sprinkler Rough-in/Hydro1/14/19981/14/19981/14/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR ROUGH IN FOR 2ND AND THIRD FLOORS & OK TO COVER
INSP - Framing/Rough-in1/5/19981/5/19981/5/1998PNR
Details
/ / 338 - they are only on the job site until 3:30 out of time will do thing E ISSUED # 014237
INSP - Framing/Rough-in12/17/199712/18/199712/18/1997PPART
Details
12/18/97 338 -
INSP - Framing/Rough-in12/3/199712/4/199712/4/1997APASS
Details
12/04/97 338 - made ok
INSP - Framing/Rough-in11/18/199711/19/199711/20/1997APASS
Details
made insp of the firestop product is ok
INSP - Framing/Rough-in11/12/199711/12/199711/12/1997PPART
Details
for 1st layer on the stair towers only
INSP - Framing/Rough-in10/29/199710/31/199710/31/1997PPASS
Details
OK TO START HANGING ROCK ON THE EXTERIOR WALLS AS THE FIRE PROOFING IS PLACED AT THE FLOOR LINE
INSP - Framing/Rough-in10/17/199710/20/199710/20/1997APART
Details
walk through only
INSP - Miscellaneous10/20/199710/20/199710/20/1997PPART
Details
GROUTING AT 1:00 made ok with sp insp approval
INSP - Miscellaneous9/30/199710/1/199710/2/1997PPASS
Details
10/02/97 338 - REBAR-GRADING made ok with the sp insp blessing
INSP - Foundation9/16/19979/17/19979/17/1997APASS
Details
09/17/97 338 - CONCRETE SLAB 2 full lenght bays on the 3rd floor south
INSP - Site Preparation9/12/19979/15/19979/15/1997ANR
Details
09/15/97 338 - SLAB not ready will recall for wed
INSP - Foundation9/2/19979/3/19979/3/1997APASS
Details
09/03/97 338 - POURED W/O INSP BY ME SP INSP MADE OK
(F) Reprint permit  8/29/1997
(F) Reprint permit  8/28/1997
Issue PAID IN FULL permit  8/28/1997
Plan assigned to (PRP)5/19/1997 8/27/1997 PASS
Details
DILLARD'S--SHELL 08/27/97 10:13:07 PRP - this action updated by action script from <<>> in Case No. BLD97-1218
Routing - PLAN CHECK8/8/1997 8/27/1997 PASS
PASS WITH NOTED EXCEPTIONS WRITTEN IN TEXT OF PERMIT DISCRIPTION. FIRE DEPARTMENT APPROVAL OF SECURITY DOORS AND FIRE HYDRANTS.
Inspection Record Card- Bld  8/27/1997
Plan Reviewer's activity  8/27/1997 PASS
REVIEWED PLANS AND FORWARD TO BOB GARRISON FOR OVER REVEIW, PREPARED CORRECTIONS AND FAX TO ARCH IN JULY, SEVERAL EXCHANGES OF INFORMATION FOR FINAL APPROVAL BETWEEN THEN AND 8/20/97. APPROVAL STAGE, FORWARD TO FIRE AND ACHD FOR FINAL.
Print Occupancy Form  8/27/1997
Print Pending Permit.LaserJet4  8/27/1997
Print Pending Permit.LaserJet4  8/27/1997 FILS
FILES
PLANS/APPL TAKEN TO FRONT DESK  8/27/1997 PASS
ISSUE
Telephone call  8/27/1997
CALLED JIM WILL BE IN 8-28-97
Routing - FIRE8/22/1997 8/26/1997 PASS
PACKAGE #1
Routing Off Site - A.C.H.D5/9/1997 8/26/1997 PASS
PACKAGE #4 CONTACTED JOE CASSEIRE AT ###-#### TO TAKE PLANS OUT TO ACHD. ACHD FEES WAIVED BY ACHD COUNTY COMMISSIONERS. LETTER ON FILE. 8/14/97 DAR
Routing - PUBLIC WORKS8/22/1997 8/26/1997 PASS
INSP - Conference8/11/19978/11/19978/11/1997 CANC
Details
08/12/97 338 - THIS IS NOT A VALID PEMIT AT THIS TIME THIS INSP IS TO BE
Routing Off Site - STRUCTURAL7/31/1997 8/8/1997
SENT ONE SET OF PLANS TO ATWOOD. REQUESTED THAT THESE PLANS BE RETURNED TO DICK PIERCE. THESE ARE REVISED PLANS. KMM
90 day tracking............. 5/8/19978/6/1997
Routing - PLAN CHECK5/22/1997 7/31/1997
PACKAGE #3 SENT ONE REVISED SET OF PLANS TO ATWOOD AND REQUESTED THAT WHEN THEY ARE DONE WITH THEIR REVIEW THEY BE RETURNED.
Plans ACCEPTED BY PLAN CHECK  5/29/1997 PEND
STARTED TO WORK ON PROJECT
Routing - PLANNING5/21/1997 5/23/1997 PASS
PACKAGE #2 X-REF: CU-8-96 & DR-106-85/MOD,DR-147-96.DR-16-97. APPROVED BY RC & TKW.
Routing Off Site - STRUCTURAL5/9/1997 5/22/1997
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN & JONES.
Routing - PUBLIC WORKS5/9/1997 5/21/1997 FAIL
PACKAGE #2 PROOF OF LEGAL LAND DIVISION AND REQUIRES DRAINAGE PLAN OK ON ODI 1173. PW BM
Plan assigned to (RGG)5/9/1997 5/19/1997
Routing - PLUMBING5/12/1997 5/19/1997 PASS
PACKAGE #1
Routing - ELECTRICAL5/9/1997 5/12/1997 PASS
PACKAGE #1
Plan routing begun/NEW & ADDTN  5/9/1997 PASS
Recd Pcfee & Taken To Pln CK  5/8/1997
Application received  5/8/1997
Plan assigned to (MYS)5/8/1997 5/8/1997
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  5/8/1997 PASS
Received Certificate of Value  5/8/1997 PASS
Routing - PLAN CHECK5/23/1997  
PACKAGE #2
Routing - PLAN CHECK5/20/1997  
PACKAGE #1
Routing - MECHANICAL   
PACKAGE #1