Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD97-01245
StatusFinaled
Name ROBERT HOSAC
Site Address 6759 S SUPPLY WAY
Project NameBOISE IND-HOSAC BLDG
Customer Number 
ePlanReviewNo
Description
HOSAC BOISE INDUSTRIAL BUILDING * TO CONSTRUCT A NEW APPROXIMATELY 31,500 SQ.FT., TYPE II-N, FULLY FIRE SPRINKLERED WAREHOUSE/STORAGE SHELL ONLY BUILDING. OTHER WORK INLCUDES ONE-HOUR TENANT SEPARATION WALLS AND ALL RELATED SITE WORK, PAVING AND LANDSCAPING PER DRH#97-0083, PC#263-97. FIRE SPRINKLERS USED FOR AREA.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/10/2008  
Letter of compliance  11/14/1997 PASS
Letter of Compliance #13565 issued 11-14-97.
INSP-Final Inspection11/10/199711/10/199711/10/1997PPASS
DetailsRick Jackson
Inspection Record Card- Bld  10/20/1997
Print Occupancy Form  10/20/1997
INSP - Final10/7/199710/7/199710/7/1997 PASS
DetailsJim Storey
/ / 301 - FNL -OK FINAL ROUTED FOR SIGN OFFS.
Temporary occupancy  10/7/1997 PASS
Temp. Occ. Cert. #3484 issued 10-7-97 to the Hosac Boise Industrial Bldg.
INSP-Final Inspection9/30/199710/1/199710/1/1997APART
DetailsRick Jackson
HE SAID YOU HAVE 9:00 APPT. approved temp c/o. c/n issued for perm c/o.
INSP - Temporary occupancy9/29/19979/30/19979/30/1997ANR
DetailsJim Storey
09/30/97 301 - BOB WILL CALL TO SCHEDULE A TIME WITH YOU TUES AM
INSP - Final9/29/19979/30/19979/30/1997PFAIL
DetailsJim Storey
09/30/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED transfer to JIM S.
INSP-Final Inspection9/29/19979/29/19979/29/1997PFAIL
DetailsRick Jackson
c/n issued
INSP-Sprinkler Rough-in/Hydro9/8/19979/8/19979/8/1997PPASS
DetailsRick Jackson
passed sprinkler hydro
INSP-Supply line flush9/3/19979/4/19979/4/1997APASS
DetailsRick Jackson
ABOUT 10:00 PLEASE PLEASE CLEAN FLOW - PASSED HYDRO WILL BE SCHEDULED FOR 9/5 1:00PM
90 day tracking............. 5/9/19978/7/1997
Receive PAYMENT IN FULL  8/6/1997
CHANGE STATUS TO (F)  7/17/1997 FEE
additional value of 31700.00 DAVE R. FOUND THAT THE SPRINKLER VALUE HAD NOT BEEN ADDED TO VALUE.
(F) Reprint permit  7/2/1997
Issue PAID IN FULL permit  7/1/1997
PLANS/APPL TAKEN TO FRONT DESK  7/1/1997 PASS
Inspection Record Card- Bld  7/1/1997
Print Occupancy Form  7/1/1997
Plan assigned to (M_O)6/2/1997 6/30/1997 PASS
Routing - PLANNING6/18/1997 6/25/1997 PASS
X-REF: DR-23-97. APPROVED BY MGS.
Routing Off Site - STRUCTURAL6/18/1997 6/19/1997 PASS
RESUBS SENT 6/18/98. TO KEITH JONES
Plan resubmittals received  6/18/1997
Print permit w/o conditions  6/18/1997
Routing - FIRE6/9/1997 6/13/1997 PASS
PACKAGE #1
Plan resubmittals requested  6/9/1997 FAIL
corrections faxed and mailed to architect and faxed to owner 6-9-97MO.
Telephone call  6/9/1997
Spoke with owner regarding corrections on structural and architectural items. Has corrections on foundation and is lacking soils report. MO
Routing - PUBLIC WORKS5/30/1997 6/3/1997 PASS
PACKAGE #2
Plan assigned to (RGG)5/12/1997 6/2/1997
Routing - PLANNING5/30/1997 5/30/1997 FAIL
X-REF: DR-83-97. TEN APPEAL PERIOD EXPIRES JUNE 9, 1997. THEN IF NO APPEALS ARE FILED THE PERMIT CAN BE SUBMITTED (PER DR). REVIEWED BY MGS.
Routing Off Site - STRUCTURAL5/13/1997 5/29/1997 FAIL
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN, AND JONES FAXED OVER A STEEL STUD WALL TO W-BEAM TO ATWOOD ATTEN: KIETH JONES KMM 5-14-97
Routing - PLANNING5/20/1997 5/22/1997 FAIL
PACKAGE #2 X-REF: DR-83-97. DR HAS NOT BEED APPROVED. WILL BE HEARD AT THE MAY 28 HEARING. REVIEWED BY MGS.
Routing - ELECTRICAL5/20/1997 5/20/1997 PASS
PACKAGE #1 NO REVIEW WILL FIELD VERIFY
Routing Off Site - A.C.H.D5/12/1997 5/19/1997 PASS
PAKCAGE #4 CONTACT ROCKY TOWLE AT ###-#### TO TAKE PLANS OUT TO ACHD. FEES NOT PAID AS OF 5-19-97. KMM
Routing - PLUMBING5/13/1997 5/19/1997 PASS
PACKAGE #1
Routing - PUBLIC WORKS5/12/1997 5/15/1997 FAIL
PACKAGE #2 requires drainage plan revisions. per BM
Plan routing begun/NEW & ADDTN  5/12/1997 PASS
PACKAGES #2AND #4 ROUTED. PACKAGES #1 AND #3 ON HOLD UNTILL I RECEIVE A STAMPED AND SIGNED ANCHOR BOLT BOOKLET. CONTACTED ROCKY'S OFFICE OF THIS NEED. PACKAGES 1 AND 3 READY TO ROUTE. RECEIVED STAMP AND SIGN. ON ANCHOR BOLT BOOKLET. KMM 05-13-97
Plan assigned to (MYS)5/9/1997 5/12/1997
DetailsMarlene Southard
Application received  5/9/1997
Received Certificate of Value  5/9/1997 PASS
Plans ACCEPTED BY PLAN CHECK  5/9/1997 PASS
PACKAGES #1 AND #3 ON HOLD WAITING STAMP AND SIGN. ON THE TYPICAL ANCHOR BOLT BOOKLET. PACKAGES #2 AND #4 ROUTED. PACKAGE #1 AND #3 READY TO ROUTE. RECEIVED STAMP AND SIGN. ON THE TYPICAL ANCHOR. KMM 05-13-97
Recd Pcfee & Taken To Pln CK  5/9/1997