Permanent occupancy | | | 2/12/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7135 issued 2-12-98 to Burger King.
|
Permanent Occupancy | | 2/10/1998 | 2/10/1998 | | DONE |
|
|
|
|
Temporary occupancy | | | 11/21/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3508 issued 11-21-97 to Burger King.
|
INSP-Final Inspection | 11/19/1997 | 11/19/1997 | 11/19/1997 | A | PASS |
Rick Jackson
|
|
|
c/o approved. corrections completed.
|
INSP - Final | 11/17/1997 | 11/18/1997 | 11/18/1997 | P | PART |
Russ Owen
|
|
|
left correction about the resubmital i got after the welding had been commpleted the engineer had wanted special insp. this was not on the approved plans.
|
INSP - Framing/Rough-in | 11/12/1997 | 11/12/1997 | 11/12/1997 | P | PASS |
Jim Storey
|
|
|
11/12/97 301 - REIN FOR CEILING GRID SCLG-OK SUSPENDED CEILING
|
INSP - Framing/Rough-in | 11/10/1997 | 11/10/1997 | 11/10/1997 | P | PART |
Russ Owen
|
|
|
CEILING GRID/ BURGER KING STILL NEED A FEW LIGHTS SUPPORTED WITH WIRE.
|
INSP - Ceiling grid | 11/7/1997 | 11/7/1997 | 11/7/1997 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 11/6/1997 | 11/7/1997 | 11/7/1997 | A | CANC |
Russ Owen
|
|
|
11/07/97 407 - CEILING, transfer to jimk st.
|
INSP - Framing/Rough-in | 10/21/1997 | 10/22/1997 | 10/22/1997 | P | PART |
Jim Storey
|
|
|
10/22/97 301 - BURGER KING FRAM-OK FRAMING for all but the shaft.
|
INSP - Framing/Rough-in | 10/17/1997 | 10/20/1997 | 10/20/1997 | P | PART |
Jim Storey
|
|
|
10/20/97 301 - sheer panels all but west entry ok . tube steel frame nee record to justify planreview notes 9,10,11 weld 1/4 fellets ok.
|
INSP - Foundation | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PART |
Russ Owen
|
|
|
09/23/97 407 - foundation before pouring floor OK NEED TO HAVE ENGINEEER CLARIFY ANCHOR BOLT ITEM. LEFT CORRECTION OK T EXCEPT AT OWN RISK SUBJECT TO ANY CHANGES REQUIRED BY ENGINEER
|
INSP - Foundation | 9/23/1997 | 9/19/1997 | 9/19/1997 | A | NR |
Russ Owen
|
|
|
CAME BACK AT 9:30 NOT READY,TOLD THEM I WOULD COME BACK AFTER LUNCH,MASSONRY INSP.
|
INSP - Footings | 9/23/1997 | 9/19/1997 | 9/19/1997 | P | PASS |
Russ Owen
|
|
|
CAME BACK AT 1:30 STILL NOT COMPLETELY READY,HAD CREW CLEAN-OUT GROUT CELLS WAITED 1-1/2 SO THE COULD POUR.SAID NEED TO GET DONE TO DO SLAB ON SATURDAY.
|
INSP - Foundation | 9/23/1997 | 9/19/1997 | 9/19/1997 | P | NR |
Russ Owen
|
|
|
NOT READY LEFT CORRECTIONS NOT TO POUR SLAB.
|
INSP - Foundation | 9/18/1997 | 9/18/1997 | 9/19/1997 | P | NR |
Russ Owen
|
|
|
09/18/97 407 - not ready.
|
INSP - Foundation | 9/12/1997 | 9/12/1997 | 9/12/1997 | P | PASS |
Russ Owen
|
|
|
09/12/97 407 - rebar mid afternoon
|
INSP - Conference | 9/11/1997 | 9/12/1997 | 9/12/1997 | A | PART |
Russ Owen
|
|
|
09/12/97 407 - EARLY AM PLEASE ,they wanted to wet set verts told to get engineer, said they would just tie.
|
(F) Reprint permit | | | 9/4/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/3/1997 | | |
|
|
|
|
(F) Reprint permit | | | 9/3/1997 | | |
|
|
|
|
Plan assigned to (RGG) | 5/13/1997 | | 8/29/1997 | | PASS |
|
|
|
PC #266-97
|
Routing - PLAN CHECK | 6/6/1997 | | 8/29/1997 | | PASS |
|
|
|
PACKAGE #3
|
Telephone call | | | 8/29/1997 | | |
|
|
|
CALLED KYLE AT BRS PERMIT READY
|
Inspection Record Card- Bld | | | 8/29/1997 | | |
|
|
|
|
Print Occupancy Form | | | 8/29/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/1997 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/29/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/15/1997 | | 8/29/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 8/13/1997 | | 8/29/1997 | | PASS |
|
|
|
PACKAGE #4
|
Plan resubmittals requested | | | 8/27/1997 | | PEND |
|
|
|
|
Plan resubmittals received | | | 8/26/1997 | | PEND |
|
|
|
|
Routing Off Site - A.C.H.D | 5/21/1997 | | 8/13/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED KYLE FREUTEL TO TAKE PLANS OUT TO ACHD AT ###-#### ACHD FEES PAID. CERTIFICATE #97-1712 - JCM
|
INSP-Conference | 7/30/1997 | 7/30/1997 | 7/30/1997 | P | PASS |
|
|
|
drilling and blasting begun, checked for fire dept blasting permit
|
Routing - PUBLIC WORKS | 7/21/1997 | | 7/23/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing - PUBLIC WORKS | 6/27/1997 | | 7/17/1997 | | FAIL |
|
|
|
PACKAGE #2 SEWER DRAINS TO STORM DRAIN.
|
Routing - PLUMBING | 7/8/1997 | | 7/11/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/17/1997 | | 7/8/1997 | | |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 6/11/1997 | | 6/27/1997 | | FAIL |
|
|
|
PACKAGE #2 SEWER DRAWINGS TO STORM DRAIN RESESIGN FOR CONNECTION TO PRESSURE SEWER WITH PUMP STATION. JJ
|
Routing - FIRE | 6/11/1997 | | 6/17/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 6/4/1997 | | 6/11/1997 | | |
|
|
|
PACKAGE #1
|
Plan resubmittals requested | | | 6/11/1997 | | PEND |
|
|
|
|
Routing - PLANNING | 6/3/1997 | | 6/10/1997 | | PASS |
|
|
|
PACKAGE #2 Approved by: RC
|
Routing - MECHANICAL | 6/9/1997 | | 6/9/1997 | | |
|
|
|
PACKAGE #1
|
Routing Off Site - STRUCTURAL | 5/21/1997 | | 6/6/1997 | | |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN & JONES
|
Routing - PLUMBING | 5/30/1997 | | 6/4/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Routing Off Site - C.D.H | 5/21/1997 | | 6/3/1997 | | PASS |
|
|
|
PACKAGE #2 CONTACTED KYEL FREUTEL AT ###-#### TO TAKE PLANS OUT TO CDH
|
Routing - ELECTRICAL | 5/21/1997 | | 5/30/1997 | | PASS |
|
|
|
PACKAGE #1
|
Received Certificate of Value | | | 5/21/1997 | | PASS |
|
|
|
RECEIVED SIGNED CERT. OF VALUE. KMM
|
Plans ACCEPTED BY PLAN CHECK | | | 5/21/1997 | | PASS |
|
|
|
RECEIVED ALL ITEMS LISTED IN ACTION 007 HOLD. PLANS READY TO ROUTE.
|
Plan assigned to (MYS) | 5/12/1997 | | 5/13/1997 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/13/1997 | | HOLD |
|
|
|
CERT. OF VALUE REQUIRES 1) SIGNATURE 2) CALL OUT SEPARATE PLUMB. AND MECH VALUES. PACKAGE #1 REQUIRES - STRUCT. CALCS. TWO KITCHEN PLANS AND TWO PLAYLAND PLANS. PACKAGE #2 REQUIRES - TWO KITCHEN PLANS PACKAGE #3 REQUIRES - STRUCT. CALCS TWO PLAYLAND SHEETS CONTACTED KYLE FREUTEL AT ###-#### KMM 5-13-97
|
Received Certificate of Value | | | 5/13/1997 | | HOLD |
|
|
|
SEE ACTION 007 HOLD
|
Plan routing begun/NEW & ADDTN | | | 5/13/1997 | | HOLD |
|
|
|
SEE ACTION 007 HOLD
|
Gay Receipt For Partial Pay | | | 5/12/1997 | | |
|
|
|
|
Application received | | | 5/12/1997 | | |
|
|
|
|