Case Summary (BLD) | | | 9/27/2002 | | DONE |
|
|
|
|
Fee Review-notes | 7/14/1998 | | 9/10/1998 | | OK? |
|
|
|
|
PubWorks Occupancy Approval | | | 9/2/1998 | | DONE |
|
|
|
Drainage project complete 09/02/98. D.Hagen
|
Letter of compliance | | | 6/16/1998 | | PASS |
|
|
|
Letter of Compliance #15078 issued 6-16-98.
|
INSP - Final | 5/11/1998 | 5/12/1998 | 5/12/1998 | A | PART |
Russ Owen
|
|
|
05/12/98 407 - NEED FINAL LETTER FROM SPECIAL INSPECTOR.ALSO PLUMBING AP
|
INSP-Final Inspection | 4/30/1998 | 5/1/1998 | 5/1/1998 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Hello!. Contact phone is [3911105]. occ approved
|
INSP - Final | 4/29/1998 | 5/1/1998 | 5/1/1998 | P | CANC |
Russ Owen
|
|
|
05/01/98 407 - cancell. by cont.
|
Code Occupancy Approval | | | 4/30/1998 | | PASS |
|
|
|
ALL CONDITIONS OF DR101-95 HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF.
|
Code Occupancy Approval | | | 4/29/1998 | | PEND |
|
|
|
Requested by: Brian Threet
|
INSP-Final Inspection | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | FAIL |
Rick Jackson
|
|
|
BLDG A--BRIAN ###-####--HE WILL CALL TO SCHEDULE address, fire lanes and knox box
|
INSP - Framing/Rough-in | 12/29/1997 | 12/30/1997 | 12/30/1997 | A | PART |
Russ Owen
|
|
|
12/30/97 407 - framing for mechanical room & roof screens.ok as per plan
|
INSP - Miscellaneous | 11/24/1997 | 11/25/1997 | 11/25/1997 | A | PART |
Russ Owen
|
|
|
conference with contractor about,roof joist and covering,they need approval from project engineer.
|
INSP - Framing/Rough-in | 11/17/1997 | 11/18/1997 | 11/18/1997 | P | PART |
Russ Owen
|
|
|
welding,unable to stop by job,but this requires special insp.
|
INSP - Footings | 10/16/1997 | 10/16/1997 | 10/16/1997 | P | PART |
Russ Owen
|
|
|
10/16/97 407 - special inspection required.
|
INSP - Framing/Rough-in | 10/14/1997 | 10/15/1997 | 10/16/1997 | P | PART |
Russ Owen
|
|
|
10/15/97 407 - walls. Tilt up special inspection required ready to pur.
|
INSP - Footings | 10/6/1997 | 10/7/1997 | 10/7/1997 | A | PART |
Russ Owen
|
|
|
10/07/97 407 - special inspection required ,contractor on site said was
|
INSP - Wall cover | 10/6/1997 | 10/7/1997 | 10/7/1997 | A | PART |
Russ Owen
|
|
|
10/07/97 407 - STRUCTURAL CONCRETE--PANELS 10-14 special inspection reqiured ,contractor said had approval.
|
INSP - Footings | 9/30/1997 | 10/1/1997 | 10/2/1997 | A | PART |
Russ Owen
|
|
|
10/01/97 407 - special inspection required.
|
INSP - Miscellaneous | 9/30/1997 | 10/1/1997 | 10/2/1997 | A | PART |
Russ Owen
|
|
|
10/01/97 407 - PRECAST WALLS, special inspection required.
|
INSP - Footings | 9/12/1997 | 9/15/1997 | 9/15/1997 | P | PART |
Russ Owen
|
|
|
09/15/97 407 - special inspection required.
|
(F) Reprint permit | | | 9/8/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/5/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/13/1997 | | |
|
|
|
|
Print Occupancy Form | | | 8/13/1997 | | |
|
|
|
|
Print Occupancy Form | | | 8/13/1997 | | |
|
|
|
|
90 day tracking............. | | 5/14/1997 | 8/12/1997 | | PEND |
|
|
|
|
FEE REVIEW-NOTES | | | 8/7/1997 | | FEES |
|
|
|
overpayment on this permit 1582.70 additional fee of 207.60 paid on bld97-1407 gives a plan check in full. ok per jt. lh
|
Plan assigned to (M_O) | 6/20/1997 | | 8/5/1997 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/21/1997 | | 7/31/1997 | | PASS |
|
|
|
RESUBS SENT TO STAPLEY ENGINEERING
|
Routing - PLANNING | 7/24/1997 | | 7/29/1997 | | PASS |
|
|
|
X-REF: DR-101-95. APPROVED BY MGS.
|
Routing Off Site - A.C.H.D | 6/3/1997 | | 7/21/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED GORDON MCDONALD AT ###-#### TO TAKE PLANS OUT TO ACHD CONTACTED GORDON MCDONALD ON 6-9-97 TO REMIND HIM THAT HIS PLANS WERE STILL WAITING TO GO TO ACHD. PICKED UP BY MCDONALDS OFFICE ON 6-11-97 TO TAKE TO ACHD. ACHD FEES ARE NOT PAID.TELEPHONE CONVERSATION WITH MARCUS GREEN ON 8/5/97 CONIRMED THAT FEES WE COVERED FROM PAYMENT ON BUILDING PLANNED FOR LAST YEAR. DAR
|
Plan resubmittals received | | | 7/21/1997 | | PEND |
|
|
|
RECEIVED REVISED PLANS AND CALCS FOR PKG. # 3. SENT BACK TO STAPLEY FOR REVIEW.MO
|
Plan resubmittals requested | | | 7/16/1997 | | |
|
|
|
faxed and mailed additional corrections from structrual engineer to architect 7-16-97. MO
|
Routing Off Site - STRUCTURAL | 7/10/1997 | | 7/15/1997 | | FAIL |
|
|
|
resubmittals sent to stapley. MO CORRECTIONS MAILED AND FAXED TO ARCHITECT 7-16-97. MO
|
Plan resubmittals received | | | 7/10/1997 | | PEND |
|
|
|
resubmittals for package 1 & 3 received on 7-10-97. MO
|
Routing Off Site - STRUCTURAL | 6/3/1997 | | 7/1/1997 | | FAIL |
|
|
|
PACKAGE #3 CALLED PDQ TO TAKE PLANS OUT TO STAPLEY ENGINEERING 7-10-97 REVISED STRUCTURAL PLANS SENT OUT TO STAPLEY VIA PDQ
|
Routing - PUBLIC WORKS | 6/24/1997 | | 6/26/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing - FIRE | 6/23/1997 | | 6/26/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 6/10/1997 | | 6/24/1997 | | FAIL |
|
|
|
PACKAGE #2 CU-39-96-not applicable-withdrawn. Buildings are allowed in this zone as proposed, but uses are restricted to those allowed in M-1 zone. See table F, Section 11-04-08.5 BCC. Approved by: RLB DR-101-95/Mod-Landscape plan does not comply with Forester's conditions. Denied by: MGS
|
Plan resubmittals requested | | | 6/23/1997 | | PEND |
|
|
|
Corrections faxed and mailed to architect on 6-23-97. MO
|
Plan assigned to (RGG) | 5/21/1997 | | 6/20/1997 | | |
|
|
|
|
Routing - PLUMBING | 6/6/1997 | | 6/11/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 6/3/1997 | | 6/10/1997 | | FAIL |
|
|
|
PACKAGE #2 REQUIRES DRAINAGE PLAN REVISION
|
Routing - ELECTRICAL | 6/3/1997 | | 6/6/1997 | | PASS |
|
|
|
PACKAGE 31 NO REVIEW, FIELD INSPECT
|
Plan routing begun/NEW & ADDTN | | | 6/3/1997 | | PASS |
|
|
|
=
|
Plans ACCEPTED BY PLAN CHECK | | | 5/28/1997 | | PASS |
|
|
|
READY TO ROUTE 6-3-97 SEE ACTION 007 HOLD
|
Received Certificate of Value | | | 5/28/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 5/14/1997 | | 5/21/1997 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/20/1997 | | HOLD |
|
|
|
PACK.#1 STRUCT. SHEETS TO BE STAMPED AND SIGNED CIVIL SHEETS TO BE STAMPED AND SIGNED TWO SETS OF SITE PLANS RECEIVED PACK. #1 INFORMATION READY TO ROUTE 6-3-97 PACK.#2 CIVIL SHEETS TO BE STAMPED AND SIGNED TWO ADDITIONAL C-3 SHEETS FOR PLUMB. LINES. DRAINAGE CALCS. ELEVATION SHEETS 2 SETS. RECEIVED ABOVE INFORMATION. PACKAGE #2 READY FOR ROUTING. PACKAGE #3 STRUC. SHEETS TO BE STAMPED AND SIGNED SHEETS SIGNED. PACKAGE #3 READY FOR ROUTING. 6-3-97 PACKAGE #4 CIVIL SHEETS TO BE STAMPED AND SIGNED. TWO SITE PLANS. PACKAGE #4 READY FOR ROUTING. PACKAGE #1 5-23-97 RECEIVED STAMPED AND SIGNED CIVIL SHEETS. STILL NEED SITE PLANS PACKAGE #2 5-23-97 RECEIVED DRAINAGE CALCS. AND STAMPED CIVIL SHEETS. STILL MISSING 2 C-3 SHEETS. PACKAGE #4 5-23-97 RECEIVED STAMPED AND SIGNED CIVIL SHEETS. STILL NEED 2 SITE PLANS
|
Application received | | | 5/14/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/14/1997 | | |
|
|
|
|