Permit Information
Permit NumberBLD97-01354
StatusFinaled
Name IDA WEST ENERGY COMPANY
Site Address 3380 AMERICANA TER
Project NamePARK TERRACE
Customer Number 
ePlanReviewNo
Description
To remodel 8,484 sq. ft. area on the 3rd floor. Work per approved plans to include new partitions to divide up 6303 sq. ft. for new office area. Construction of new one-hour rated corridor to connect stair enclosures in core area. Installation of new ceiling panels, and new light fixtures. Installation of new smoke door assembly in front of elevator shaft. Remodel restrooms in core area to make accessible. NOTE: This building is fully fire sprinklered to substitute for one-hour construction. Any alterations to the fire sprinkler system shall comply with NFPA#13 as required by Boise city fire department. (P.C.#281-97)(RMH) THIS PERMIT IS FOR OCCUPANCY OF IDA-WEST ENERGY COMPANY ONLY! SEPARATE PERMITS WILL BE REQUIRED FOR ANY WORK IN THE OTHER TENANT SPACES.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/18/19988/18/1998 DONE
Details
INSP - Final8/17/19988/17/19988/18/1998PPASS
Details
08/18/98 333 - FNL -OK FINAL
Permanent occupancy  8/18/1998 PASS
Perm. Occ. Cert. #7356 issued 8-18-98 to Ida West Engery Co. in the Park Terrace Bldg.
INSP - Final8/17/19988/17/19988/17/1998PPASS
Details
08/17/98 333 - FNL -OK FINAL
INSP-Final Inspection8/17/19988/17/19988/17/1998PNR
DetailsRick Jackson
fred schuerman ###-#### fn fire cathy has occ card nobody on-site knew about this; called the number above and left message for info
INSP - Final11/7/199711/7/199711/7/1997PPART
Details
11/07/97 333 - aigned for temp
INSP - Final11/4/199711/5/199711/5/1997PFAIL
Details
11/05/97 333 - OTH-OTHER AGENCIES NOT APPROVED
INSP-Final Inspection11/4/199711/5/199711/5/1997APART
DetailsJoe Tawney
11/05/97 406 - REINSP FOR FINAL OK FOR TEMP OCC
INSP - Final10/30/199710/31/199710/31/1997AFAIL
DetailsRick Jackson
not ready from 10/30 c/n
INSP - Final10/30/199710/30/199710/30/1997PNR
DetailsJim Storey
10/30/97 301 - trans to kim
INSP-Sprinkler Rough-in/Hydro10/24/199710/29/199710/29/1997PFAIL
DetailsRick Jackson
SCHEDULED FOR 3:00 c/n issued.
INSP - Framing/Rough-in8/27/19978/28/19978/28/1997PPASS
Details
08/28/97 333 - FRAM-OK FRAMING
INSP - Framing/Rough-in8/25/19978/26/19978/26/1997PNR
DetailsJim Storey
08/26/97 301 - trans to kim ì
90 day tracking............. 5/19/19978/17/1997 PEND
INSP - Conference8/8/19978/11/19978/11/1997PPART
Details
marked plans for strobe locations, discussed elevator recall, smoke detector for smoke dampers
INSP - Carpentry8/7/19978/7/19978/7/1997PPASS
Details
08/07/97 333 - reviewed 1hr lids
INSP - Conference8/5/19978/6/19978/6/1997ANR
DetailsJim Storey
08/06/97 301 - trans to kiml Matter please call him he needs to talk to if at all possible. Thanks!
Issue PAID IN FULL permit  7/28/1997
Plan assigned to (R_H)5/21/1997 7/25/1997 PASS
Details
07/25/97 09:09:57 R_H - this action updated by action script from <<>> in Case No. BLD97-1354
Print Pending Permit.LaserJet4  7/25/1997 PASS
Routing - PLAN CHECK7/24/1997 7/25/1997 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/25/1997 PASS
Inspection Record Card- Bld  7/25/1997
Telephone call  7/25/1997
PERMIT READY, FEE DUE
Print Occupancy Form  7/25/1997
Plan Reviewer's activity  7/25/1997 PASS
Recieved new cert. of value. Ready to issue.
Routing - FIRE7/15/1997 7/24/1997 PASS
Plan Reviewer's activity  7/15/1997 PEND
Reviewed resubmittals need new certificate of value for scope of work. Reroute to fire department for review.
Plan Reviewer's activity  6/26/1997 PEND
Met with architect Bill Matter. Disscused how exiting for tenant on 3rd floor will be maintained while demolition work proceeds on second and first floors. The construction of the corridor on the third floor must be submitted with this tenant improvement. The core improvements of the second and first floors will be submitted under a separate permit.
Plan Reviewer's activity  6/24/1997
Talked to Mr. Matter set up meeting for 6/25/97 to disscuss requirements for upgrade.
Routing - FIRE6/16/1997 6/18/1997 FAIL
Routing - PLAN CHECK5/22/1997 6/16/1997 PASS
Plan Reviewer's activity  6/16/1997 FAIL
Faxed required corrections to arcitect.
Routing - PUBLIC WORKS5/21/1997 5/22/1997 PASS
Plan routing begun/TENANTS  5/21/1997
Route to PUBLIC WORKS then back to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT.
Plan assigned to (MYS)5/19/1997 5/21/1997
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  5/19/1997
Application received  5/19/1997
Case Summary (BLD)