Permit Information
Permit NumberBLD97-01381
StatusFinaled
Name ELECTRIC LIGHTWAVE CENTRAL OFF
Site Address 10452 W EMERALD ST
Project NameWEST PARK BUSINESS
Customer Number 
ePlanReviewNo
Description
To finish the interior of a 12,040 sq.ft. building for telecommunications facility which includes office areas and communications equipment areas per approved plans on file. Work to include the construction of non-combustible walls to divide up space. No occupancy separations required. The installation of fire sprinkler system. The installation of suspended ceiling system. The construction of a fence to enclose generator yard on east side of structure. Mechanical, Electrical, and Plumbing. NOTE FIRE SPRINKLER SHALL BE INSTALLED PER NFPA#13 AS REQULATED BY THE FIRE DEPARTMENT (P.C.#289-97)RMH
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 12/5/199712/5/1997 DONE
Details
Permanent occupancy  12/5/1997 PASS
Perm. Occ. Cert. #7071 issued 12-5-97 to Electric Lightwave Central Office.
Temporary occupancy  12/1/1997 PASS
Temp. Occ. Cert. #3514 issued 12-1-97 to the Electric Lightwave Central Ofc.
INSP - Final11/25/199711/25/199711/25/1997 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
INSP - Final11/21/199711/24/199711/24/1997PPASS
Details
OK TO SIGN FOR ME WITH FIRE INSP SIGNOFF
INSP-Final Inspection11/24/199711/24/199711/24/1997PCANC
DetailsJoe Tawney
11/24/97 406 - REINSP CANCELLED RESCHEDULED FOR 11/25/97 AM
INSP - Final11/19/199711/20/199711/20/1997APART
Details
signed the temp col of the occ req card, flush bolt on the front door not allowed
INSP-Final Inspection11/19/199711/20/199711/20/1997APASS
DetailsJoe Tawney
11/20/97 406 - FINAL OK FOR TEMP OCC
INSP - Final11/18/199711/18/199711/18/1997PFAIL
Details
11/18/97 333 - e wants this close to 3:00 if possible OTH-OTHER AGENCIES NOT APPROVED
INSP-Final Inspection11/17/199711/18/199711/18/1997PFAIL
DetailsRick Jackson
11/18/97 409 -
INSP-Final Inspection11/17/199711/17/199711/17/1997PCANC
DetailsJoe Tawney
11/17/97 406 - CHARLIE WILL CALL YOU ABOUT THIS INSPECTION CANCELLED RESCH TO 11/18/97
INSP-Final Inspection11/14/199711/17/199711/17/1997PCANC
DetailsJoe Tawney
11/17/97 406 - around 1:00 INSPECTION CANCELLED RESCH TO 11/18/97
INSP - Final11/14/199711/17/199711/17/1997PPART
Details
around 2:00 or later, Joe Tawney will be there at 1:00 ok for the temp only
INSP - Conference11/5/199711/5/199711/5/1997PPASS
Details
11/05/97 333 - talked about ada cabo ansi
INSP - Conference10/24/199710/24/199710/24/1997PPASS
DetailsJoe Tawney
10/24/97 406 - CHARLIE FROM STEED/ CALL ###-#### -PAGER IF YOU CAN'T FIN THERE ALL DAY PRE FINAL CONFERENCE
INSP-Sprinkler Rough-in/Hydro10/9/199710/9/199710/9/1997PPART
DetailsJoe Tawney
10/09/97 406 - OK ON ROUGH & HYDRO TESTS FOR WET PIPE AND PREACTION DRY
INSP - Framing/Rough-in10/7/199710/8/199710/8/1997ANR
Details
10/08/97 338 - not ready will check the rest of the seizmic and perim wi
INSP - Footings9/29/19979/30/19979/30/1997ACANC
Details
09/30/97 338 - generator containment enclosure found wall r-bar is place
INSP - Foundation9/30/19979/30/19979/30/1997 PASS
Details
/ / 338 - MASN-REBAR OK ok to pour with sp insp approval
INSP-Conference9/24/19979/29/19979/29/1997APASS
DetailsJoe Tawney
09/29/97 406 - joe, i talked to them last week and they asked if the pla detector was okay under the joist in the main comm room, 409 9/24/97 DISCUSSED PLACEMENT OF SMOKE DET ON CEILING OF BLDG CANNOT PUT UNDER TRU
INSP-Final Inspection9/23/19979/24/19979/24/1997PPART
DetailsRick Jackson
nobody knew why were called there. approved smoke detector placement under joist in main comm room.
INSP - Footings9/22/19979/23/19979/23/1997ANR
Details
09/23/97 338 - not ready did not cancel
INSP - Foundation9/19/19979/22/19979/22/1997AFAIL
Details
09/22/97 338 - not ready reinforcing at the transition horizontals not i recal for ready time and my inspection
INSP - Wall cover9/17/19979/18/19979/18/1997APASS
Details
09/18/97 338 -
INSP-Supply line flush9/15/19979/15/19979/15/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Framing/Rough-in8/28/19978/28/19978/28/1997PPASS
Details
08/28/97 338 - bracing OK TO COVER AWAITING INFO ON PARTITION WALL BRACI
INSP - Framing/Rough-in8/28/19978/28/19978/28/1997 PASS
Details
/ / 333 - FRAM-OK FRAMING
INSP - Framing/Rough-in8/22/19978/22/19978/22/1997PPART
Details
08/22/97 338 - done by 408
INSP - Carpentry8/22/19978/22/19978/22/1997PPASS
DetailsTom Arcoraci
partial cover of fram
INSP - Framing/Rough-in8/18/19978/18/19978/18/1997 PASS
Details
/ / 338 - PARTIAL FRAMINGext walls only furring
INSP - Framing/Rough-in8/18/19978/18/19978/18/1997 PASS
Details
/ / 338 - PARTIAL FRAMINGext walls only furring
90 day tracking............. 5/20/19978/18/1997
Issue PAID IN FULL permit  7/15/1997
Inspection Record Card- Bld  7/1/1997
Print Occupancy Form  7/1/1997
Telephone call  7/1/1997 MESS
LEFT MESSAGE FOR RAY SCHAFFER AT ###-####
PLANS/APPL TAKEN TO FRONT DESK  7/1/1997 PASS
Received plans from electrical division. Ready to issue
Routing - ELECTRICAL6/26/1997 6/30/1997 PASS
NO REVIEW FIELD VERIFY
Print Pending Permit.LaserJet4  6/26/1997 PASS
Finished plan review. Routed to electrical division.
Plan assigned to (R_H)5/23/1997 6/26/1997 PASS
Details
06/26/97 11:03:58 R_H - this action updated by action script from <<>> in Case No. BLD97-1381
Routing - PLAN CHECK6/24/1997 6/25/1997 PASS
Plan Reviewer's activity  6/25/1997
Received resubmittals will reveiw and assemble plans.
Routing - FIRE6/18/1997 6/23/1997 PASS
Routing - PLAN CHECK6/13/1997 6/18/1997 PEND
Plan Reviewer's activity  6/18/1997 FAIL
Sent requirements to Architect. Route to fire department.
Routing - PLANNING6/11/1997 6/12/1997 PASS
X-REF: DR-107-97, DR-96-95. APPROVED BY TKW.
Routing - PUBLIC WORKS5/29/1997 6/11/1997 PASS
Application/Plans DENIED  5/23/1997 HOLD
This plan lacks sufficient information to begin the routing process. Sent a FAX questionnaire to the architect on 5/23/97. Will begin routing after his response.
Plan routing begun/TENANTS  5/23/1997
Route to PUBLIC WORKS then back to PLAN CHECK. After Plan Check route to PLANNING and the FIRE DEPARTMENT.
Plan assigned to (MYS)5/20/1997 5/23/1997
DetailsMarlene Southard
Application received  5/20/1997
Recd Pcfee & Taken To Pln CK  5/20/1997
Routing - PLAN CHECK6/30/1997