Fee Review-notes | 7/14/1998 | | 9/10/1998 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | | | 9/2/1998 | | DONE |
|
|
|
Drainage project complete 09/02/98. D.Hagen
|
Letter of compliance | | | 6/16/1998 | | PASS |
|
|
|
Letter of Compliance #15080 issued 6-16-98.
|
INSP - Final | 5/11/1998 | 5/12/1998 | 5/12/1998 | A | PART |
Russ Owen
|
|
|
05/12/98 407 - NEED FINAL LETTER FROM SPECIAL INSPECTOR .
|
INSP-Final Inspection | 5/1/1998 | 5/1/1998 | 5/1/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved. TI for st lukes hosp. in progress
|
Code Occupancy Approval | | | 5/1/1998 | | PASS |
|
|
|
ALL CONDITIONS OF DR101-95 HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF.
|
Code Occupancy Approval | | | 4/29/1998 | | PEND |
|
|
|
Requested by: Brian Threet
|
INSP-Final Inspection | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | CANC |
Rick Jackson
|
|
|
BLDG B--BRIAN ###-####--HE WILL CALL YOU TO SCHEDULE canc by brian of steed. alarm panel malfunction
|
INSP - Framing/Rough-in | 12/29/1997 | 12/30/1997 | 12/30/1997 | A | PART |
Russ Owen
|
|
|
12/30/97 407 - framing for mechanical & roof screens,ok as per plans.
|
INSP - Miscellaneous | 11/24/1997 | 11/25/1997 | 11/25/1997 | A | PART |
Russ Owen
|
|
|
welding,not a welding insp a conference about the roofing a stell joist need approval from engineer.
|
INSP - Framing/Rough-in | 11/17/1997 | 11/18/1997 | 11/18/1997 | P | PART |
Russ Owen
|
|
|
unable to stop by job ,but this requires special insp.
|
INSP - Wall cover | 11/3/1997 | 11/3/1997 | 11/4/1997 | P | PART |
Russ Owen
|
|
|
CONCRETE WALLS special inspection required.
|
INSP - Footings | 10/16/1997 | 10/17/1997 | 10/17/1997 | A | PART |
Russ Owen
|
|
|
10/17/97 407 - special inspection required.
|
INSP - Footings | 10/14/1997 | 10/15/1997 | 10/16/1997 | P | NR |
Russ Owen
|
|
|
10/15/97 407 - not ready, will require special insp.
|
INSP - Footings | 9/18/1997 | 9/19/1997 | 9/19/1997 | A | PART |
Russ Owen
|
|
|
09/19/97 407 - special inspection required ,contractor has them calledou
|
(F) Reprint permit | | | 9/8/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/5/1997 | | |
|
|
|
|
90 day tracking............. | | 5/22/1997 | 8/20/1997 | | |
|
|
|
|
Print Occupancy Form | | | 8/13/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/13/1997 | | |
|
|
|
|
FEE REVIEW-NOTES | | | 8/7/1997 | | FEES |
|
|
|
overpayment on permit bld97-1312 1582.70 + 207.60 = plan check on bld97-1407 ok per jim toombs lh
|
Plan assigned to (M_O) | 6/20/1997 | | 8/5/1997 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/21/1997 | | 7/31/1997 | | PASS |
|
|
|
CORRECTED PLANS SENT BACK TO STAPLEY FOR REVIEW. MO
|
Routing - PLANNING | 7/24/1997 | | 7/29/1997 | | PASS |
|
|
|
X-REF: DR-101-95. APPROVED BY MGS.
|
Application received | | | 7/24/1997 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 6/3/1997 | | 7/21/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED GORDON MCDONALD AT ###-#### TO TAKE PLANS OUT TO ACHD CONTACTED GORDON ON 6-9-97 TO REMIND HIM TO TAKE PLANS OUT TO ACHD. GORDON'S OFFICE PICKED UP PLANS TO TAKE TO ACHD ON 6-11-97. ACHD FEES NOT PAID. 8/05/97 TELEPHONE CONVERSATION WITH MARKUS GREEN CONFIRMED THAT FEES FOR ACHD WERE COVERED THROUGH PREVIOUS NEGOTIATIONS.
|
Plan resubmittals received | | | 7/21/1997 | | PEND |
|
|
|
RECEIVED REVSIED PLANS AND CALCS FOR PKG #3. SENT TO STAPLEY FOR REVIEW. MO
|
Plan resubmittals requested | | | 7/16/1997 | | |
|
|
|
ADDITIONAL CORRECTIONS FROM STRUCTRUAL ENGINEER MAILED AND FAXED TO ARCHITECT 7-16-97. MO
|
Routing Off Site - STRUCTURAL | 7/10/1997 | | 7/15/1997 | | FAIL |
|
|
|
REVISED PLANS SENT OUT TO STAPLEY FOR REVIEW.MO CORRECTIONS MAILED AND FAXED TO ARCHITECT 7-16-97. MO
|
Plan resubmittals received | | | 7/10/1997 | | PEND |
|
|
|
resubmittals received for pkg 1 and 3 on 7-10-97.MO
|
Routing Off Site - STRUCTURAL | 6/3/1997 | | 7/1/1997 | | FAIL |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO STAPLEY. Corrections mailed and faxed to architect on 7-1-97. Plans pkg 3 are still at Stapley's. Resubmittals for pkg 3 received on 7-10-97 sent three sets back to Stapley 7-10-97. MO
|
Routing - PUBLIC WORKS | 6/24/1997 | | 6/26/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing - FIRE | 6/23/1997 | | 6/26/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 6/10/1997 | | 6/23/1997 | | FAIL |
|
|
|
PACKAGE #2 CU-39-96-Not applicable-withdrawn. Buildings are allowed in this zone as proposed, but uses are restricted to those allowed in M-1 zone. See table F, Section 11-04-08.5, BCC Approved by: RLB DR-101-95/Mod-Landscape plan does not comply with Forester's conditions. Denied by: MGS
|
Plan resubmittals requested | | | 6/23/1997 | | PEND |
|
|
|
faxed and mailed corrections to Architect on 6-23-97
|
Plan assigned to (RGG) | 6/2/1997 | | 6/20/1997 | | |
|
|
|
|
Routing - PLUMBING | 6/6/1997 | | 6/11/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 6/3/1997 | | 6/10/1997 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISIOIN PACKAGE #2
|
Routing - ELECTRICAL | 6/3/1997 | | 6/6/1997 | | PASS |
|
|
|
PACKAGE #1 NO PLAN REVIEW, FIELD INSPECT
|
Plan routing begun/NEW & ADDTN | | | 6/3/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/3/1997 | | PASS |
|
|
|
SEE ACTION 007 ON BLD97-1312 FOR EXPLANATION
|
Plan assigned to (MYS) | 5/22/1997 | | 6/2/1997 | | |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 5/28/1997 | | PASS |
|
|
|
|
Application received | | | 5/22/1997 | | |
|
|
|
|