Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD97-01426
StatusFinaled
Name BENCHMARK CONSTRUCTION
Site Address 6528 SUPPLY WAY
Project NameIDAHO ELEC. SIGNS
Customer Number 
ePlanReviewNo
Description
IDAHO ELECTRIC SIGNS ADDIITON AND REMODEL-TO BUILD A NEW 5760 SQUARE FOOT, ONE STORY PREFABRICATED METAL BUILDING ADDTION AT THE EAST END OF THE EXISTING BUILDING TO ENLARGE THE SIGN MANUFACTURING AREA. THIS PERMIT IS ALSO TO REMODEL THE EXISTING SECOND FLOOR OFFICE AREAS, ENCLOSE THE EXISTING ROUTER AREA AND CONSTRUCT A NEW 350 SQUARE FOOT STORAGE MEZZANINE OVER THE ROUTER AREA; AS WELL AS, CONSTRUCT A NEW EXTERIOR STAIR AT THE SOUTH WALL OF THE EXISTING BUILDING. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. DR#48-97/PC#309-97/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/6/19984/6/1998 DONE
Details
Permanent occupancy  4/6/1998 PASS
Perm. Occ. Cert. #7190 issued 4-6-98 to Idaho Electric Signs.
INSP-Final Inspection4/3/19984/3/19984/3/1998PPASS
DetailsRick Jackson
received letter from owner stating the sprinkler control valve will be installed within 18 months.
INSP - Final4/3/19984/3/19984/3/1998PPASS
DetailsRuss Owen
re-insp.
INSP-Final Inspection1/22/19981/23/19981/23/1998AFAIL
DetailsRick Jackson
trip test of dry sprinkler system - okay. sprinkler system now has over 100 heads, not monitored. no outside control valve.
INSP-Sprinkler Rough-in/Hydro1/22/19981/23/19981/23/1998PPASS
DetailsRick Jackson
hydro passed.
INSP-Final Inspection1/20/19981/22/19981/22/1998PNR
DetailsRick Jackson
01/22/98 409 - AROUND 1:00 PLEASE contractor not there
INSP - Final1/15/19981/16/19981/16/1998APART
DetailsRuss Owen
01/16/98 407 - left correction ok temp oc.
INSP-Final Inspection1/13/19981/14/19981/14/1998APART
DetailsRick Jackson
01/14/98 409 - sprinkler and life safty Dwayne ###-#### annual sprinkler test and wrong temperature sprinkler heads near heaters fab area.
Code Occupancy Approval  1/5/1998 PASS
OK PER APPROVED PLANS.
INSP - Framing/Rough-in12/31/19971/2/19981/2/1998APASS
DetailsRuss Owen
01/02/98 407 - added header for stairs,as per architect.
INSP - Framing/Rough-in12/22/199712/23/199712/23/1997APART
DetailsRuss Owen
12/23/97 407 - left correction for fire blocking ,ok to cover the walls,
INSP - Framing/Rough-in12/17/199712/18/199712/18/1997APART
DetailsRuss Owen
talked with contractor,1 handrail needs to extend 12" for cabo/ansi.
INSP - Framing/Rough-in12/11/199712/12/199712/12/1997APART
DetailsRuss Owen
12/12/97 407 - ceilingok left correction will check at final.
INSP - Framing/Rough-in12/8/199712/9/199712/9/1997APART
DetailsRuss Owen
12/09/97 407 - THIS IS A PORTION OF INTERIOR ONLY. STILL HAVE OTHER FRAM
INSP - Temporary occupancy11/25/199711/26/199711/26/1997APART
DetailsRuss Owen
left corrections
INSP-Final Inspection11/25/199711/26/199711/26/1997APART
DetailsRick Jackson
11/26/97 409 - ASAP PLEASE approved temp occupancy of new shop and mezzanine must witness sprinkler test
INSP - Framing/Rough-in11/13/199711/14/199711/14/1997PPASS
Details
11/14/97 333 - STORAGE AND DECK FRAME OK
INSP - Miscellaneous10/23/199710/24/199710/24/1997PPART
DetailsRuss Owen
10/24/97 407 - This is a one sided fire wall inspection, the wall design approved plans left a correction for Architect to submit a change order approval.
INSP - Foundation10/2/199710/2/199710/3/1997PPASS
DetailsRuss Owen
10/02/97 407 - slab inspection at idaho electric signs
INSP - Foundation9/29/19979/30/19979/30/1997APASS
DetailsRuss Owen
09/30/97 407 -
INSP - Foundation9/24/19979/25/19979/25/1997APASS
DetailsRuss Owen
09/25/97 407 -
INSP - Footings9/17/19979/18/19979/19/1997PPASS
DetailsRuss Owen
09/18/97 407 - END OF DAY.insp columns only.
Issue PAID IN FULL permit  9/10/1997
(F) Reprint permit  9/10/1997
Routing - PLAN CHECK6/26/1997 9/9/1997 PASS
PACKAGE #1
Inspection Record Card- Bld  9/9/1997
PLANS/APPL TAKEN TO FRONT DESK  9/9/1997 PASS
Print Occupancy Form  9/9/1997
Telephone call  9/9/1997
CALLED RANAE PERMIT READY
Inspection Record Card- Bld  9/9/1997
Plan resubmittals received  9/8/1997 PASS
RECEIVED THE ACCEPTANCE LETTER FROM STAPLEY ENGINEERING ON THE BUTLER BUILDING PORTION OF THIS PROJECT.
Plan assigned to (JCM)6/20/1997 9/8/1997 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL8/27/1997 9/8/1997
RESUBS SENT VIA PDQ TO CH2MHILL STRUCTURAL REVIEW LETTER 9-8-97, METAL BLD. DRAWINGS, METAL BLD. CALC. REVIEW RESPONSE LETTER & ADD. FAZXD DETAIL FOR TRANSITION OF ROOF AT NEW TO EXISTING RETURNED AND GIVEN TO JOHN M.
Plan resubmittals requested  9/5/1997 PEND
FAXED CLINTON TO REQUEST THE LETTER FROM STAPLEY ENGINEERING, AS THE ENGINEER OF RECORD, ACCEPTING THE STEEL BUILDING DESIGN.
Routing - PUBLIC WORKS9/3/1997 9/5/1997 PASS
PACKAGE #2
Telephone call  9/4/1997 PEND
I CALL HOWIE HENRICKSON AT CH2MHILL TO INQUIRE AS TO THE PROGRESS ON REVIEWING THE BUTLER BUILDING PORTION OF THIS PROJECT. HE INDICATED THAT HE WAS PRESENTLY REVIEWING THE PROJECT, BUT THAT HE DID NOT RECEIVE THE RESPONSES FROM STAPLEY ENGINEERING ON HIS ORIGINAL CORRECTION LIST AND THAT HE HAD CALLED STAPLEY AND REQUESTED THAT THEY FAX HIM A COPY OF THEIR RESPONSE LETTER. I DID NOT UNDERSTAND WHY HE DID NOT HAVE THE RESPONSE LETTER AND REVISED PLANS FROM STAPLEY, BECAUSE I WAITED FOR THAT INFORMATION BEFORE FORWARDING THE BUTLER BUILDING PLANS SO THAT HE WOULD HAVE ALL OF THE REQUESTED INFORMATION; SOME OF THE PLAN SHEETS MUST HAVE BEEN LOST IN TRANSIT.
Plan resubmittals received  9/4/1997 PEND
RECEIVED REVISED PLANS INDICATING THE REQUIRED OPENING PROTECTION FOR THE NORTH WINDOWS, AS WELL AS, ADDITIONAL CHANGES GENERATED BY THE APPLICANT.
Telephone call  9/2/1997 PEND
AFTER REVIEW OF THE PROPOSED PROPERTY LINE LOCATIONS DETAILED ON THE NEW CIVIL PLANS, I CALLED CLINTON YAKA AT BRS TO INFORM HIM THAT THE NORTH PROPERTY LINE WAS TOO CLOSE TO THE EXISTING BUILDING AND THAT ADDITIONAL MODIFICATIONS WOULD BE REQUIRED, INCLUDING THE INSTALLATION OF 45 MINUTE WINDOW ASSEMBLIES. CLINTON INDICATED THAT HE WOULD REVIEW THIS WITH THE OWNER AND CIVIL ENGINEER AND GET BACK TO ME.
Routing Off Site - A.C.H.D6/2/1997 8/27/1997 PASS
PACKAGE #4 CONTACTED CLINTON YAKA AT ###-#### IMPQCT FEES PAID 08/27/97 - CERT. #97-1844
Routing - PLAN CHECK6/18/1997 8/27/1997 PEND
PACKAGE #3
Routing - PUBLIC WORKS8/27/1997 8/27/1997 FAIL
REQUIRES DRAINAGE PLAN.
90 day tracking............. 5/23/19978/21/1997
Plan resubmittals received  7/29/1997 PEND
RECEIVED TWO COPIES OF THE BUTLER BUILDING PLANS AND CALCULATIONS. I AM STILL WAITING FOR THE OTHER RESPONSES FROM THE ARCHITECT AND ENGINEER OF RECORD SO THAT I CAN SEND THE WHOLE PACKAGE OVER TO CH2MHILL FOR FINAL REVIEW.
Routing - PUBLIC WORKS6/23/1997 6/27/1997 FAIL
Routing - FIRE6/24/1997 6/26/1997 PASS
PACKAGE #1
Routing - PLAN CHECK6/3/1997 6/24/1997
PACKAGE #1
Plan resubmittals requested  6/23/1997 PEND
ARCHITECTURAL AND STRUCTURAL CORRECTION LISTS MAILED TO CLINTON YAKA AT BRS.
Routing - PLAN CHECK6/19/1997 6/23/1997 PEND
PACKAGE #2
Plan assigned to (RGG)5/23/1997 6/20/1997
Routing - PLANNING6/16/1997 6/18/1997 PASS
PACKAGE #2 X-REF: DR-48-97. APPROVED BY TKW.
Routing Off Site - STRUCTURAL6/2/1997 6/18/1997
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL
Routing - PUBLIC WORKS6/2/1997 6/10/1997 FAIL
PACKAGE #2 requires proof of legal land division and drainage plan. BM
Routing - ELECTRICAL6/2/1997 6/3/1997 PASS
PACKAGE #1 FIELD VERIFY
Plans ACCEPTED BY PLAN CHECK  6/2/1997 PASS
Plan routing begun/NEW & ADDTN  6/2/1997 PASS
Recd Pcfee & Taken To Pln CK  5/23/1997
Plan assigned to (MYS)5/23/1997 5/23/1997
DetailsMarlene Southard
Application received  5/23/1997
Received Certificate of Value  5/23/1997 PASS