Permanent Occupancy | | 4/6/1998 | 4/6/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/6/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7190 issued 4-6-98 to Idaho Electric Signs.
|
INSP-Final Inspection | 4/3/1998 | 4/3/1998 | 4/3/1998 | P | PASS |
Rick Jackson
|
|
|
received letter from owner stating the sprinkler control valve will be installed within 18 months.
|
INSP - Final | 4/3/1998 | 4/3/1998 | 4/3/1998 | P | PASS |
Russ Owen
|
|
|
re-insp.
|
INSP-Final Inspection | 1/22/1998 | 1/23/1998 | 1/23/1998 | A | FAIL |
Rick Jackson
|
|
|
trip test of dry sprinkler system - okay. sprinkler system now has over 100 heads, not monitored. no outside control valve.
|
INSP-Sprinkler Rough-in/Hydro | 1/22/1998 | 1/23/1998 | 1/23/1998 | P | PASS |
Rick Jackson
|
|
|
hydro passed.
|
INSP-Final Inspection | 1/20/1998 | 1/22/1998 | 1/22/1998 | P | NR |
Rick Jackson
|
|
|
01/22/98 409 - AROUND 1:00 PLEASE contractor not there
|
INSP - Final | 1/15/1998 | 1/16/1998 | 1/16/1998 | A | PART |
Russ Owen
|
|
|
01/16/98 407 - left correction ok temp oc.
|
INSP-Final Inspection | 1/13/1998 | 1/14/1998 | 1/14/1998 | A | PART |
Rick Jackson
|
|
|
01/14/98 409 - sprinkler and life safty Dwayne ###-#### annual sprinkler test and wrong temperature sprinkler heads near heaters fab area.
|
Code Occupancy Approval | | | 1/5/1998 | | PASS |
|
|
|
OK PER APPROVED PLANS.
|
INSP - Framing/Rough-in | 12/31/1997 | 1/2/1998 | 1/2/1998 | A | PASS |
Russ Owen
|
|
|
01/02/98 407 - added header for stairs,as per architect.
|
INSP - Framing/Rough-in | 12/22/1997 | 12/23/1997 | 12/23/1997 | A | PART |
Russ Owen
|
|
|
12/23/97 407 - left correction for fire blocking ,ok to cover the walls,
|
INSP - Framing/Rough-in | 12/17/1997 | 12/18/1997 | 12/18/1997 | A | PART |
Russ Owen
|
|
|
talked with contractor,1 handrail needs to extend 12" for cabo/ansi.
|
INSP - Framing/Rough-in | 12/11/1997 | 12/12/1997 | 12/12/1997 | A | PART |
Russ Owen
|
|
|
12/12/97 407 - ceilingok left correction will check at final.
|
INSP - Framing/Rough-in | 12/8/1997 | 12/9/1997 | 12/9/1997 | A | PART |
Russ Owen
|
|
|
12/09/97 407 - THIS IS A PORTION OF INTERIOR ONLY. STILL HAVE OTHER FRAM
|
INSP - Temporary occupancy | 11/25/1997 | 11/26/1997 | 11/26/1997 | A | PART |
Russ Owen
|
|
|
left corrections
|
INSP-Final Inspection | 11/25/1997 | 11/26/1997 | 11/26/1997 | A | PART |
Rick Jackson
|
|
|
11/26/97 409 - ASAP PLEASE approved temp occupancy of new shop and mezzanine must witness sprinkler test
|
INSP - Framing/Rough-in | 11/13/1997 | 11/14/1997 | 11/14/1997 | P | PASS |
|
|
|
11/14/97 333 - STORAGE AND DECK FRAME OK
|
INSP - Miscellaneous | 10/23/1997 | 10/24/1997 | 10/24/1997 | P | PART |
Russ Owen
|
|
|
10/24/97 407 - This is a one sided fire wall inspection, the wall design approved plans left a correction for Architect to submit a change order approval.
|
INSP - Foundation | 10/2/1997 | 10/2/1997 | 10/3/1997 | P | PASS |
Russ Owen
|
|
|
10/02/97 407 - slab inspection at idaho electric signs
|
INSP - Foundation | 9/29/1997 | 9/30/1997 | 9/30/1997 | A | PASS |
Russ Owen
|
|
|
09/30/97 407 -
|
INSP - Foundation | 9/24/1997 | 9/25/1997 | 9/25/1997 | A | PASS |
Russ Owen
|
|
|
09/25/97 407 -
|
INSP - Footings | 9/17/1997 | 9/18/1997 | 9/19/1997 | P | PASS |
Russ Owen
|
|
|
09/18/97 407 - END OF DAY.insp columns only.
|
Issue PAID IN FULL permit | | | 9/10/1997 | | |
|
|
|
|
(F) Reprint permit | | | 9/10/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 6/26/1997 | | 9/9/1997 | | PASS |
|
|
|
PACKAGE #1
|
Inspection Record Card- Bld | | | 9/9/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/1997 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/9/1997 | | |
|
|
|
|
Telephone call | | | 9/9/1997 | | |
|
|
|
CALLED RANAE PERMIT READY
|
Inspection Record Card- Bld | | | 9/9/1997 | | |
|
|
|
|
Plan resubmittals received | | | 9/8/1997 | | PASS |
|
|
|
RECEIVED THE ACCEPTANCE LETTER FROM STAPLEY ENGINEERING ON THE BUTLER BUILDING PORTION OF THIS PROJECT.
|
Plan assigned to (JCM) | 6/20/1997 | | 9/8/1997 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 8/27/1997 | | 9/8/1997 | | |
|
|
|
RESUBS SENT VIA PDQ TO CH2MHILL STRUCTURAL REVIEW LETTER 9-8-97, METAL BLD. DRAWINGS, METAL BLD. CALC. REVIEW RESPONSE LETTER & ADD. FAZXD DETAIL FOR TRANSITION OF ROOF AT NEW TO EXISTING RETURNED AND GIVEN TO JOHN M.
|
Plan resubmittals requested | | | 9/5/1997 | | PEND |
|
|
|
FAXED CLINTON TO REQUEST THE LETTER FROM STAPLEY ENGINEERING, AS THE ENGINEER OF RECORD, ACCEPTING THE STEEL BUILDING DESIGN.
|
Routing - PUBLIC WORKS | 9/3/1997 | | 9/5/1997 | | PASS |
|
|
|
PACKAGE #2
|
Telephone call | | | 9/4/1997 | | PEND |
|
|
|
I CALL HOWIE HENRICKSON AT CH2MHILL TO INQUIRE AS TO THE PROGRESS ON REVIEWING THE BUTLER BUILDING PORTION OF THIS PROJECT. HE INDICATED THAT HE WAS PRESENTLY REVIEWING THE PROJECT, BUT THAT HE DID NOT RECEIVE THE RESPONSES FROM STAPLEY ENGINEERING ON HIS ORIGINAL CORRECTION LIST AND THAT HE HAD CALLED STAPLEY AND REQUESTED THAT THEY FAX HIM A COPY OF THEIR RESPONSE LETTER. I DID NOT UNDERSTAND WHY HE DID NOT HAVE THE RESPONSE LETTER AND REVISED PLANS FROM STAPLEY, BECAUSE I WAITED FOR THAT INFORMATION BEFORE FORWARDING THE BUTLER BUILDING PLANS SO THAT HE WOULD HAVE ALL OF THE REQUESTED INFORMATION; SOME OF THE PLAN SHEETS MUST HAVE BEEN LOST IN TRANSIT.
|
Plan resubmittals received | | | 9/4/1997 | | PEND |
|
|
|
RECEIVED REVISED PLANS INDICATING THE REQUIRED OPENING PROTECTION FOR THE NORTH WINDOWS, AS WELL AS, ADDITIONAL CHANGES GENERATED BY THE APPLICANT.
|
Telephone call | | | 9/2/1997 | | PEND |
|
|
|
AFTER REVIEW OF THE PROPOSED PROPERTY LINE LOCATIONS DETAILED ON THE NEW CIVIL PLANS, I CALLED CLINTON YAKA AT BRS TO INFORM HIM THAT THE NORTH PROPERTY LINE WAS TOO CLOSE TO THE EXISTING BUILDING AND THAT ADDITIONAL MODIFICATIONS WOULD BE REQUIRED, INCLUDING THE INSTALLATION OF 45 MINUTE WINDOW ASSEMBLIES. CLINTON INDICATED THAT HE WOULD REVIEW THIS WITH THE OWNER AND CIVIL ENGINEER AND GET BACK TO ME.
|
Routing Off Site - A.C.H.D | 6/2/1997 | | 8/27/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED CLINTON YAKA AT ###-#### IMPQCT FEES PAID 08/27/97 - CERT. #97-1844
|
Routing - PLAN CHECK | 6/18/1997 | | 8/27/1997 | | PEND |
|
|
|
PACKAGE #3
|
Routing - PUBLIC WORKS | 8/27/1997 | | 8/27/1997 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN.
|
90 day tracking............. | | 5/23/1997 | 8/21/1997 | | |
|
|
|
|
Plan resubmittals received | | | 7/29/1997 | | PEND |
|
|
|
RECEIVED TWO COPIES OF THE BUTLER BUILDING PLANS AND CALCULATIONS. I AM STILL WAITING FOR THE OTHER RESPONSES FROM THE ARCHITECT AND ENGINEER OF RECORD SO THAT I CAN SEND THE WHOLE PACKAGE OVER TO CH2MHILL FOR FINAL REVIEW.
|
Routing - PUBLIC WORKS | 6/23/1997 | | 6/27/1997 | | FAIL |
|
|
|
|
Routing - FIRE | 6/24/1997 | | 6/26/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 6/3/1997 | | 6/24/1997 | | |
|
|
|
PACKAGE #1
|
Plan resubmittals requested | | | 6/23/1997 | | PEND |
|
|
|
ARCHITECTURAL AND STRUCTURAL CORRECTION LISTS MAILED TO CLINTON YAKA AT BRS.
|
Routing - PLAN CHECK | 6/19/1997 | | 6/23/1997 | | PEND |
|
|
|
PACKAGE #2
|
Plan assigned to (RGG) | 5/23/1997 | | 6/20/1997 | | |
|
|
|
|
Routing - PLANNING | 6/16/1997 | | 6/18/1997 | | PASS |
|
|
|
PACKAGE #2 X-REF: DR-48-97. APPROVED BY TKW.
|
Routing Off Site - STRUCTURAL | 6/2/1997 | | 6/18/1997 | | |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL
|
Routing - PUBLIC WORKS | 6/2/1997 | | 6/10/1997 | | FAIL |
|
|
|
PACKAGE #2 requires proof of legal land division and drainage plan. BM
|
Routing - ELECTRICAL | 6/2/1997 | | 6/3/1997 | | PASS |
|
|
|
PACKAGE #1 FIELD VERIFY
|
Plans ACCEPTED BY PLAN CHECK | | | 6/2/1997 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/2/1997 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/23/1997 | | |
|
|
|
|
Plan assigned to (MYS) | 5/23/1997 | | 5/23/1997 | | |
Marlene Southard
|
|
|
|
Application received | | | 5/23/1997 | | |
|
|
|
|
Received Certificate of Value | | | 5/23/1997 | | PASS |
|
|
|
|