Permit Information
Permit NumberBLD97-01433
StatusFinaled
Name LAM
Site Address 9939 W EMERALD ST
Project NameWESTPARK BLD "C"
Customer Number 
ePlanReviewNo
Description
To finish a 7,200 sq.ft. office tenant space per approved plans on file. Work to include construction of approximatly 335lf of new noncombustible interior partition walls, 75lf on new one-hour noncombustible tenant demising wall, installation of rest room fixtures, nonabsorbent flooring, and wall covering to 4ft above floor level, doors, hardware, flooring, painting, and suspended ceiling to create a reception, a library, two rest rooms, a break room, two conference rooms, and seven office use areas. NOTE: This building is fully fire sprinklered and alterations will be per NFPA #13 as administered by the fire department. Note; A new Certificate of Occupancy must be obtained by this tenant prior to occupying this space. (P.C. #299-97) PRP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/6/2003  
Case Summary (BLD)  9/26/2002  
Permanent Occupancy 9/17/19979/17/1997 DONE
Details
Permanent occupancy  9/17/1997 PASS
Perm. Occ. Cert. #6990 issued 9-17-97 to Lam Research.
Temporary occupancy  9/5/1997 PASS
Temp. Occ. Cert. #3462 issued 9-5-97 to LAM Research in Westpark Bldg. C.
INSP - Final9/3/19979/4/19979/4/1997PPART
Details
09/04/97 338 - OK FOR THE TEMP
INSP - Final9/4/19979/4/19979/4/1997 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
INSP - Final9/2/19979/3/19979/3/1997PNR
Details
09/03/97 338 - CANCELLED BY THE CTR BY PHONE OTH-OTHER AGENCIES NOT APPROVED WILL RECALL FOR TOMORROW
INSP-Final Inspection9/2/19979/3/19979/3/1997AFAIL
DetailsJoe Tawney
09/03/97 406 - FINAL INSP FAIL BLDG ADDRESS FIRE EXT EXIT LIGHTS
INSP-Final Inspection8/28/19978/29/19978/29/1997ACANC
DetailsJoe Tawney
08/29/97 406 - CANCEL INSP WAS FOR SHELL BLD95-1455
INSP - Ceiling grid8/27/19978/27/19978/28/1997PPART
Details
08/27/97 338 - part mede ok
90 day tracking............. 5/23/19978/21/1997 PEND
INSP-Sprinkler Rough-in/Hydro8/15/19978/19/19978/19/1997PFAIL
DetailsJoe Tawney
08/19/97 406 - OK ON HYDRO TEST EXCEPT FDC PIPING CALL WHEN READY FOR FD
INSP-Sprinkler Rough-in/Hydro7/25/19977/28/19977/28/1997APART
DetailsJoe Tawney
07/28/97 406 - AND A OVERHEAD HYDRO ALSO 9:30 am OK ON UNDERGROUND FLUSH AND SPKLR ROUGH IN NOT READY FOR OVERHEAD HYDRO
INSP - Framing/Rough-in7/24/19977/25/19977/25/1997APASS
Details
07/25/97 338 - FRAM-OK FRAMING
PLANS/APPL TAKEN TO FRONT DESK  6/30/1997 PASS
Telephone call  6/30/1997
PERMIT READY, FEE DUE
Inspection Record Card- Bld  6/30/1997
Print Occupancy Form  6/30/1997
Issue PAID IN FULL permit  6/30/1997
Plan resubmittals received  6/27/1997
Print Pending Permit.LaserJet4  6/27/1997 PASS
FILES
Plan assigned to (PRP)5/28/1997 6/27/1997 PASS
Details
waiting resubs from arch and owner. ISSUE-=6/27/97
Routing - FIRE6/9/1997 6/9/1997 PASS
Plan Reviewer's activity  6/6/1997 PEND
REVIEWED PLANS, PREPARE PLAN ANALYSIST FOR AREA, CORRECTION LIST, FAX TO ARCH, FORWARD TO FIRE. 06/27/97--REVIEW RESUB "ADDENDUMS". ATTACH TO PLANS, ISSUE.
Plan resubmittals requested  6/6/1997
Routing - PUBLIC WORKS5/29/1997 6/3/1997 PASS
Plan routing begun/TENANTS  5/28/1997
Route to PUBLIC WORKS then back to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT.
Plan assigned to (MYS)5/23/1997 5/28/1997
DetailsMarlene Southard
Application received  5/23/1997
Recd Pcfee & Taken To Pln CK  5/23/1997