Case Summary (BLD) | | | 12/16/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 11/7/2003 | | |
|
|
|
|
Code Occupancy Approval | | | 1/26/1999 | | PASS |
|
|
|
Final - complies with DRH97-0002
|
(F) Reprint permit | | | 11/13/1998 | | |
|
|
|
|
Fee Review-notes | 7/15/1998 | | 10/16/1998 | | DONE |
|
|
|
|
Letter of compliance | | | 7/1/1998 | | PASS |
|
|
|
Letter of Compliance #15765 issued 7-1-98.
|
INSP - Final | 6/18/1998 | 6/18/1998 | 6/18/1998 | A | PASS |
|
|
|
made ok signed the perm col of the occ req card
|
INSP - Final | 6/16/1998 | 6/16/1998 | 6/16/1998 | P | NR |
|
|
|
06/16/98 338 - NEED TO FINISH THE STAIR AREA INTERMEDIATE RAILING PROTEC
|
INSP - Final | 6/11/1998 | 6/11/1998 | 6/11/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION FOR SHELL
|
INSP-Final Inspection | 6/8/1998 | 6/9/1998 | 6/9/1998 | A | FAIL |
Joe Tawney
|
|
|
06/09/98 406 - Scheduled by Hello!. Contact phone is [8692072]. REINSP FAIL NFPA 72 FORM REPLACE 2 STROBES IN RESTROOMS
|
INSP-Final Inspection | 5/29/1998 | 5/29/1998 | 5/29/1998 | P | FAIL |
Joe Tawney
|
|
|
05/29/98 406 - Scheduled by Hello!. Contact phone is [8692072]. FINAL FAIL SPKLR HYDRO TEST ELEVATOR SHUNT TRIP
|
INSP-Final Inspection | 5/26/1998 | 5/26/1998 | 5/26/1998 | P | FAIL |
Joe Tawney
|
|
|
05/26/98 406 - Scheduled by Hello!. Contact phone is [8692072]. FINAL FAIL ALARM SYSTEM BLDG ADDRESS HYDRO TEST
|
PubWorks Occupancy Approval | | | 5/22/1998 | | DONE |
|
|
|
Drainage project complete 5/22/98. R.Rokovitz
|
INSP - Framing/Rough-in | 5/19/1998 | 5/19/1998 | 5/19/1998 | P | PART |
|
|
|
made ok to drop in tiles in the core area fire caulk ok emergency switch boxes are not rated to be in the corridor wall
|
INSP-Sprinkler Rough-in/Hydro | 5/13/1998 | 5/13/1998 | 5/13/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR HYDRO TEST
|
INSP-Supply line flush | 4/6/1998 | 4/7/1998 | 4/7/1998 | A | PART |
Joe Tawney
|
|
|
8:30 AS PER 406-LONNIE ###-#### ok on underground flush
|
INSP - Framing/Rough-in | 3/13/1998 | 3/13/1998 | 3/13/1998 | P | PART |
|
|
|
03/13/98 338 - made ok for corridor drywall.
|
INSP - Framing/Rough-in | 3/9/1998 | 3/10/1998 | 3/10/1998 | A | NR |
|
|
|
03/10/98 338 - not ready , need ele signoff for the walls of the corrido
|
INSP - Foundation | 10/27/1997 | 10/28/1997 | 10/28/1997 | A | PASS |
|
|
|
lynx center\\late am MADE OK WITH SP INSP APPROVAL
|
INSP - Foundation | 10/21/1997 | 10/22/1997 | 10/22/1997 | A | PASS |
|
|
|
made ok with sp insp approval
|
INSP - Footings | 9/22/1997 | 9/22/1997 | 9/22/1997 | P | PASS |
|
|
|
09/22/97 338 - interior footing pads out of time #1 tomorrow
|
(F) Reprint permit | | | 9/22/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/19/1997 | | |
|
|
|
|
90 day tracking............. | | 6/3/1997 | 9/1/1997 | | PEND |
|
|
|
|
Inspection Record Card- Bld | | | 8/13/1997 | | |
|
|
|
|
Print Occupancy Form | | | 8/13/1997 | | |
|
|
|
|
Telephone call | | | 8/13/1997 | | |
|
|
|
LEFT MESSAGE WITH SECRETARY
|
Received Certificate of Value | | | 8/12/1997 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/1997 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 6/27/1997 | | 8/4/1997 | | PASS |
John Menard
|
|
|
|
Routing - MECHANICAL | 6/17/1997 | | 8/4/1997 | | |
|
|
|
PACKAGE #1 SENT TO BOB GARRISON - FIELD VERIFY MECHANICAL REQUIREMENTS
|
Routing - PLAN CHECK | 7/23/1997 | | 8/4/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 7/15/1997 | | 8/4/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing Off Site - A.C.H.D | 6/9/1997 | | 8/1/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED CORNEL LARSON TO TAKE PLANS OUT TO ACHD IMPACT FEES PAID - 08/01/97 -CERTIFICATE #97-1694
|
Waiting for Cert. of Value | | | 8/1/1997 | | PEND |
|
|
|
NOTIFIED ARCHITECT (CORNEL LARSON) THAT THE PERMIT WAS READY PENDING RECEIPT OF CERTIFICATE OF VALUE FROM CONTRACTOR.
|
Plan resubmittals received | | | 7/25/1997 | | PASS |
|
|
|
RECEIVED STRUCTURAL REVISIONS AS REQUESTED; NO ARCHITECTURAL REVISIONS WERE REQUESTED.
|
Routing - FIRE | 7/11/1997 | | 7/23/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 7/10/1997 | | 7/15/1997 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 7/11/1997 | | PEND |
|
|
|
SENT CORRECTION LIST TO CORNEL ALONG WITH THE STRUCTURAL REVIEW COMMENTS.
|
Routing - PLAN CHECK | 6/30/1997 | | 7/10/1997 | | |
|
|
|
PACKAGE #2
|
Routing Off Site - STRUCTURAL | 6/9/1997 | | 7/7/1997 | | |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO STAPLEY ENG.
|
Plan assigned to (RGG) | 6/5/1997 | | 6/27/1997 | | |
|
|
|
|
Routing - PLANNING | 6/23/1997 | | 6/26/1997 | | PASS |
|
|
|
PACKAGE #2 X-REF: DR-2-97. APPROVED BY TKW.
|
Routing - PUBLIC WORKS | 6/9/1997 | | 6/18/1997 | | FAIL |
|
|
|
NEEDS DRAINAGE PLANS REVISIONS
|
Routing - PLUMBING | 6/13/1997 | | 6/17/1997 | | PASS |
|
|
|
PACKAGE #1 SENT TO BOB GARRISON
|
Routing - ELECTRICAL | 6/9/1997 | | 6/13/1997 | | PASS |
|
|
|
PACKAGE #1
|
Received Certificate of Value | | | 6/9/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/9/1997 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/9/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 6/3/1997 | | 6/5/1997 | | |
Marlene Southard
|
|
|
|
Application received | | | 6/3/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/1997 | | |
|
|
|
|