Permanent Occupancy | | 3/17/1998 | 3/17/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/17/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7173 issued 3-17-98 to the Cracker Barrel Old Country Store, Inc.
|
INSP-Final Inspection | 3/13/1998 | 3/16/1998 | 3/16/1998 | A | PASS |
Joe Tawney
|
|
|
03/16/98 406 - Final resinspection of the Cracker Barrel Restaurant REINSP OK FOR PERM OCC
|
Code Occupancy Approval | | | 2/17/1998 | | PASS |
|
|
|
Inspected for final - Signed final
|
INSP-Final Inspection | 2/12/1998 | 2/13/1998 | 2/13/1998 | A | FAIL |
Joe Tawney
|
|
|
02/13/98 406 - DICK ###-####- reinsp for perm occ FAIL KNOX BOX ON ORDER AIR BALANCE REPORTS FOR HOODS
|
INSP - Final | 2/12/1998 | 2/13/1998 | 2/13/1998 | P | PASS |
|
|
|
DICK ###-#### ok for cathy to sign for me if other signoffs are traken care of
|
Temporary occupancy | | | 1/30/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3545 issued 1-30-98 to the Cracker Barrel Old Country Store.
|
INSP - Framing/Rough-in | 1/29/1998 | 1/30/1998 | 1/29/1998 | A | CANC |
|
|
|
dick ###-#### temp occupancy\\cancelled as per Perry
|
INSP - Final | 1/29/1998 | 1/29/1998 | 1/29/1998 | | PART |
|
|
|
01/29/98 338 - ok for temp occ only
|
INSP-Final Inspection | 1/29/1998 | 1/29/1998 | 1/29/1998 | P | PASS |
Joe Tawney
|
|
|
01/29/98 406 - ###-#### FINAL OK FOR TEMP OCC WEST GRILL ANSUL SYST SPKLR BELL DET CONTR RM
|
Code Occupancy Approval | | | 1/29/1998 | | TEMP |
|
|
|
Bond posted for undergrd. sprkler. sys/landscaping $75,818.00/Temporary Occupancy ok
|
INSP - Final | 1/23/1998 | 1/23/1998 | 1/23/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL FAIL ALARM PANEL ANSUL SYSTEM TESTS OTHER ITEMS
|
INSP - Final | 1/22/1998 | 1/23/1998 | 1/23/1998 | P | FAIL |
|
|
|
01/23/98 338 - DICK WILL CALL YOU TO SCHEDULE A TIME--###-####..FIRE GUY THEc/n issued ok to interview applicants in cordaned off area only need cdhd,and fire signoff
|
INSP-Sprinkler Rough-in/Hydro | 1/22/1998 | 1/22/1998 | 1/22/1998 | | FAIL |
|
|
|
HYDRO TEST FAIL FDC NOT INCLUDED DID NOT HOLD PRESSURE ON SYSTEM
|
INSP - Framing/Rough-in | 1/16/1998 | 1/20/1998 | 1/20/1998 | A | PASS |
|
|
|
01/20/98 338 - made ok to drop in tiles some slack wires missing will ch
|
INSP - Framing/Rough-in | 12/22/1997 | 12/22/1997 | 12/22/1997 | P | PART |
|
|
|
12/22/97 338 - ok for 2nd layer on the shafts
|
INSP - Framing/Rough-in | 12/16/1997 | 12/17/1997 | 12/19/1997 | A | PART |
Jim Storey
|
|
|
12/18/97 301 - INTERIOR WALL shafts need reinsp.
|
INSP - Framing/Rough-in | 12/4/1997 | 12/5/1997 | 12/5/1997 | A | PASS |
Jim Storey
|
|
|
12/05/97 301 - outside wall for cover. exterior nailling ok for cover.
|
INSP-Supply line flush | 12/2/1997 | 12/2/1997 | 12/2/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 11/17/1997 | 11/19/1997 | 11/19/1997 | A | NR |
Jim Storey
|
|
|
11/18/97 301 - trans to perry
|
INSP - Footings | 10/22/1997 | 10/23/1997 | 10/23/1997 | A | FAIL |
Jim Storey
|
|
|
10/23/97 301 - trans to perry
|
(F) Reprint permit | | | 10/17/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/16/1997 | | |
|
|
|
|
Telephone call | | | 10/14/1997 | | |
|
|
|
CALLED DICK WASSON AND TOLD HIM AMOUNT
|
Print Occupancy Form | | | 10/14/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/14/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/1997 | | PASS |
|
|
|
|
Plan assigned to (M_O) | 7/22/1997 | | 10/13/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/1/1997 | | 10/13/1997 | | PASS |
|
|
|
resubmitted calcs and sheet S-3 sent to CH2MHILL for review.
|
Routing - PLAN CHECK | 8/28/1997 | | 9/30/1997 | | PASS |
|
|
|
RESUBMITTALS RECEIVED CORRECTIONS COMPLETED 09/30/97. MO
|
Plan resubmittals received | | | 9/30/1997 | | PASS |
|
|
|
Structural and mechanical received. MO
|
Plan resubmittals received | | | 9/24/1997 | | FAIL |
|
|
|
RECEIVED RESUBMITTALS FOR STRUCTRUAL AND MECHANICAL WHICH WERE INCOMPLETE PER THE WRITTEN RESPONSE FROM COLLEEN ATWOOD. ATWOOD CONTACTED BY PHONE MESSAGE AND FAX. MO
|
90 day tracking............. | | 6/4/1997 | 9/2/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/21/1997 | | 8/29/1997 | | FAIL |
|
|
|
PACKAGE #3 RESUBS SENT TO CH2MHILL VIA PDQ
|
Routing - FIRE | 8/11/1997 | | 8/28/1997 | | PASS |
|
|
|
PACKAGE #1
|
Plan resubmittals received | | | 8/20/1997 | | FAIL |
|
|
|
RESUBMITTAL FOR PKG #1 RECEIVED IS INCOMPLETE. COLLEEN ATWOOD CONTACTED. MO
|
Plan Reviewer's activity | | | 8/18/1997 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 8/13/1997 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 7/22/1997 | | 8/11/1997 | | FAIL |
|
|
|
CORRECTIONS FAXED AND MAILED TO ARCHITECT. MO
|
Plan resubmittals requested | | | 8/11/1997 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 8/11/1997 | | FAIL |
|
|
|
|
Routing - PLUMBING | 7/25/1997 | | 8/1/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 7/18/1997 | | 7/23/1997 | | PASS |
|
|
|
PACKAGE #2 REVIEWED BY MS.
|
Plan assigned to (RGG) | 6/5/1997 | | 7/22/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/25/1997 | | 7/17/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing Off Site - STRUCTURAL | 6/23/1997 | | 7/17/1997 | | FAIL |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL
|
Routing - PLUMBING | 7/1/1997 | | 7/9/1997 | | FAIL |
|
|
|
PACKAGED #1
|
Routing - ELECTRICAL | 6/23/1997 | | 7/1/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - C.D.H | 6/10/1997 | | 6/23/1997 | | PASS |
|
|
|
PACKAGE #2 CONTACTED BRIAN HUFFACKER AT ###-#### TO TAKE PLANS OUT TO CDH.
|
Routing Off Site - A.C.H.D | 6/10/1997 | | 6/13/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED BRIAN HUFFACKER AT###-#### TO TAKE PLANS OUT TO ACHD 6-16-97 ACHD FEES DUE PER MARCUS GREEN.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/10/1997 | | PASS |
|
|
|
|
Received Certificate of Value | | | 6/9/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/9/1997 | | HOLD |
|
|
|
CONTACTED TED TILLMAN AT ###-#### TO LET HIM KNOW THAT PACKAGE #1 AND PACKAGE #3 REQUIRES STRUCTURAL CALCS. PACKAGE #2 REQUIRES ONE SET OF KITCHEN PLAN EQ SHEETS 1-4.
|
Plan routing begun/NEW & ADDTN | | | 6/9/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 6/4/1997 | | 6/5/1997 | | |
Marlene Southard
|
|
|
|
Application received | | | 6/4/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/4/1997 | | PASS |
|
|
|
|