Permit Information
Permit NumberBLD97-01561
StatusFinaled
Name 1ST PRESBYTERIAN CHURCH
Site Address 950 W STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(PRESBYTERIAN CHURCH - NEW SOUTH ENTRANCE AND ADDITION) Fire sprinklers used to substitute for 1-hr fire-resistive construction. The demolition of existing courtyard improvements covered under BLD97-2733. To construct a 3,891 square foot addition between exsiting buildings on the South side. Work is to include site improvements, concrete footings, concrete foundations, steel columns, wood beam and joist roof system, a new masonry tower, and skylights all per approved drawings, engineering, and plan check conditions on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. Generally, this is a shell and core permit. Finishes for most of the addition (as shown on the approved drawings) will be constructed under a future phase. Work shall be sufficiently complete to allow occupancy. CU-78-94/AA-76-96/AA-51-95 PC-334-97 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/10/2008  
Case Summary (BLD)  7/12/2007  
Permanent occupancy  6/5/1998 PASS
Perm. Occ. Cert. #7267 issued 6-5-98 to the First Presbyterian Church.
INSP - Final6/4/19986/4/19986/4/1998PPASS
Details
06/05/98 333 - FNL -OK FINAL
Permanent Occupancy 6/4/19986/4/1998 DONE
Details
INSP-Final Inspection5/26/19985/27/19985/27/1998APASS
DetailsRick Jackson
###-#### occ approved per approved plans
Code Occupancy Approval  5/27/1998 PASS
Trees and sod replaced per P&Z ltr. Final ok.
Code Occupancy Approval  4/15/1998 TEMP
Signed Temp on 4/10/98. No land scape requirements in coditions. Small amount of grass and couple small trees to be added by church.
INSP - Final4/10/19984/10/19984/10/1998 PART
Details
04/10/98 333 - card signed for temp cn placed
INSP - Framing/Rough-in4/7/19984/10/19984/10/1998PPASS
Details
temp ok cn placed
INSP - Final4/9/19984/10/19984/10/1998PPART
Details
temp ok cn placed
Temporary occupancy  4/10/1998 PASS
Temp. Occ. Cert. #3589 issued 4-10-98 to First Presbyterian Church on their addn.
INSP - Framing/Rough-in4/7/19984/8/19984/8/1998APART
Details
not ready
INSP - Framing/Rough-in4/8/19984/8/19984/8/1998 PASS
Details
04/08/98 333 - conference on temp occ
INSP-Sprinkler Rough-in/Hydro4/1/19984/1/19984/1/1998APASS
DetailsRick Jackson
completed attic area. old portion of building complete.
INSP-Sprinkler Rough-in/Hydro3/26/19983/27/19983/27/1998AFAIL
DetailsRick Jackson
9:00 ###-#### attic area not covered.
INSP-Sprinkler Rough-in/Hydro3/10/19983/11/19983/11/1998PPART
Details
michael ###-#### hydro passed, need to install sprinkler in soffit, north end of west area.
INSP - Miscellaneous11/19/199711/19/199711/19/1997PFAIL
Details
11/19/97 333 - ceeptage beb dont do pits
INSP - Wall cover11/17/199711/18/199711/18/1997AFAIL
DetailsWes Worcester
11/18/97 342 - FIRE WALL IN ROOM 250 fire wall not to plan, not to specs looked at first layer of two hour assembly's...detail and resubmittal re
INSP - Carpentry11/18/199711/18/199711/18/1997PPASS
Details
11/18/97 333 - FIRE WALLS ok ì
INSP - Wall cover11/4/199711/5/199711/5/1997APART
Details
11/05/97 333 - FIRE WALL IN ATTIC..
Issue PAID IN FULL permit  10/16/1997
testing condition printout  10/10/1997
Print permit w/o conditions  10/10/1997
Plan Reviewer's activity  10/10/1997 PASS
Drawings approved after second review by the consultant engineer.
PLANS/APPL TAKEN TO FRONT DESK  10/10/1997 PASS
Print Occupancy Form  10/10/1997
Inspection Record Card- Bld  10/10/1997
Telephone call  10/10/1997
called talked to someone at 1st prebsyterian church will let paul no.mps
Plan assigned to (CJW)6/13/1997 10/10/1997 PASS
DetailsCarl Westfall
10/10/97 13:49:08 CJW - this action updated by action script from <<>> in Case No. BLD97-1561
Routing Off Site - STRUCTURAL10/2/1997 10/9/1997 PASS
Second review done by consultant engineer. Drawings approved.
Plan resubmittals received  10/2/1997
Received response from the Engineer of Record. Gave a copy to Dave Radford to send to the consultant engineer.
Meeting  9/22/1997
Had a meeting with the Engineer of Record. The architect and the consultant engineers (Keith Jones and Bill Cook) were present. The Engineer of Record will comply with the consultant engineers requests.
Telephone call  9/16/1997
Called Paul Hoffman. Told him the status of the permit. He ask if he could get a demolition permit. He was told that if he filled out an application for a demo permit we would have a demo permit ready within 24 hours.
Telephone call  9/16/1997
Called Libby Hill (architect). Told her the status of the permit. Three items on the Engineer's response are not complete (7, 8, & 10). Otherwise, the drawings are in order.
Plan Reviewer's activity  9/12/1997
Resubmittal review completed. Approval from consultant engineer is pending. Copy of engineer's response faxed to the consultant.
Routing - FIRE8/24/1997 9/11/1997 PASS
Plan resubmittals received  9/4/1997
90 day tracking............. 6/4/19979/2/1997 PEND
Routing - PUBLIC WORKS8/19/1997 8/22/1997 PASS
Routing - PLAN CHECK8/8/1997 8/19/1997
Drawings reviewed the first time and meeting held with architects to go over the plan check report.
Meeting  8/19/1997
Met with the Architect (Libby Hill) and went through each item on the plan check report (conditions list). Personally gave her a copy of that report.
Plan Reviewer's activity  8/8/1997
UBC plan check started Aug. 8, 1997 and finished Aug. 18, 1997. Resubmittals required. See conditions list.
Routing - PLUMBING8/1/1997 8/7/1997 PASS
Routing - PLANNING7/24/1997 8/1/1997 PASS
X-REF: AA-76-96 & DR-94-96. APPROVED BY RLB & MGS.
Routing - PUBLIC WORKS7/14/1997 7/21/1997 FAIL
REQUIRES DRAINAGE PLAN REVISION. PER BM
Routing Off Site - A.C.H.D6/18/1997 7/11/1997 PASS
CALLED PAUL HOFFMAN TO TAKE PLANS TO ACHD. ACHD FEES PAID. COPY OF RECEIPT ATTACHED TO PLANS AND IN THE FILE.
Plan assigned to (MYS)6/4/1997 6/13/1997
DetailsMarlene Southard
Plan routing begun/TENANTS  6/13/1997
Route the (2) main sets of drawings to ADA COUNTY HIGHWAY DISTRICT, PUBLIC WORKS, PLANNING, PLUMBING, then back to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT. Route separate set of structural plans to off site ENGINEER.
Recd Pcfee & Taken To Pln CK  6/4/1997
Application received  6/4/1997
Routing Off Site - STRUCTURAL   
6/13/97-Called Libby Hill for a 3rd set of structural sheets so we can send out to engineer for review. (9-12-97) Faxed a copy of the response from the Engineer of Record to the consultant Engineer (Bill Cook with Atwood-Hinzman-Jones) and ask him to review and comment.