Case Summary (BLD) | | | 8/12/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/7/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/31/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/3/2001 | | |
|
|
|
|
INSP-Final Inspection | 9/4/1998 | 9/4/1998 | 9/4/1998 | P | PASS |
Rick Jackson
|
|
|
earl ###-#### occ approved
|
Permanent Occupancy | | 4/3/1998 | 4/3/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/3/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7188 issued 4-3-98 to the Good Samaritan Home.
|
INSP - Final | 3/31/1998 | 4/1/1998 | 4/1/1998 | P | PASS |
Wes Worcester
|
|
|
03/31/98 342 - JEFF ###-#### ì
|
INSP - Framing/Rough-in | 3/26/1998 | 3/27/1998 | 3/27/1998 | P | PASS |
Wes Worcester
|
|
|
03/27/98 342 - jeff ###-#### ì
|
INSP-Final Inspection | 3/23/1998 | 3/23/1998 | 3/23/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved.
|
INSP - Wall cover | 3/19/1998 | 3/19/1998 | 3/19/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Wall cover | 3/18/1998 | 3/19/1998 | 3/19/1998 | A | NR |
Wes Worcester
|
|
|
03/19/98 342 - DRY WALL ON FIRE WALL--JEFF ###-####
|
INSP-Final Inspection | 3/13/1998 | 3/13/1998 | 3/13/1998 | P | FAIL |
Rick Jackson
|
|
|
alarm plans, draft curtains, electrical box in attic
|
INSP-Sprinkler Rough-in/Hydro | 3/11/1998 | 3/13/1998 | 3/13/1998 | A | PASS |
Rick Jackson
|
|
|
BRUCE ###-####--GOOD SAMARITAN HOME was scheduled for wed but cancelled to wait for rick hydro completed
|
INSP-Sprinkler Rough-in/Hydro | 3/10/1998 | 3/11/1998 | 3/11/1998 | P | CANC |
Joe Tawney
|
|
|
03/11/98 406 - INSP CANCELLED
|
INSP - Framing/Rough-in | 3/9/1998 | 3/10/1998 | 3/10/1998 | A | PART |
Tom Arcoraci
|
|
|
03/10/98 408 - jess ###-####-fire wall dry wall BOILER ROOM HAS 2 LAYERS 5/8 ON CEILING EXT WALL EAST SIDE HAS 2 LAYERS ON EAVE
|
INSP - Framing/Rough-in | 2/26/1998 | 2/27/1998 | 2/27/1998 | P | PART |
Wes Worcester
|
|
|
02/27/98 342 - PLEASE MEET AT 2:00--JEFF ###-####
|
INSP - Framing/Rough-in | 2/24/1998 | 2/25/1998 | 2/25/1998 | A | NR |
Wes Worcester
|
|
|
02/25/98 342 - jeff ###-#### dry wall insp
|
INSP - Framing/Rough-in | 2/17/1998 | 2/18/1998 | 2/18/1998 | P | PART |
Wes Worcester
|
|
|
02/18/98 342 - ###-####
|
INSP - Framing/Rough-in | 2/13/1998 | 2/17/1998 | 2/17/1998 | A | PASS |
Wes Worcester
|
|
|
02/17/98 342 - SHEETROCK NAILING ###-#### JEFF
|
INSP - Framing/Rough-in | 2/6/1998 | 2/9/1998 | 2/9/1998 | A | NR |
Wes Worcester
|
|
|
02/08/98 342 - WING A--SHEET ROCK NAILING--JEFF ###-####
|
INSP - Wall cover | 2/9/1998 | 2/9/1998 | 2/9/1998 | | NH |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Final | 2/9/1998 | 2/9/1998 | 2/9/1998 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - need electrical insp, address #'s, grading and replace soils front of house and garage side,etc
|
INSP - Wall cover | 2/6/1998 | 2/6/1998 | 2/6/1998 | P | PASS |
Wes Worcester
|
|
|
02/06/98 342 - jeff ###-#### sheet rock nailing
|
INSP - Framing/Rough-in | 2/3/1998 | 2/3/1998 | 2/3/1998 | P | PASS |
Wes Worcester
|
|
|
02/03/98 342 - SHEET ROCK NAILING--JEFF ###-####
|
INSP - Framing/Rough-in | 1/22/1998 | 1/23/1998 | 1/23/1998 | A | PART |
Wes Worcester
|
|
|
01/23/98 342 - jeff-###-#### ì
|
INSP - Framing/Rough-in | 1/14/1998 | 1/15/1998 | 1/15/1998 | A | PART |
Wes Worcester
|
|
|
01/14/98 342 - conf. ###-#### Jeff
|
INSP - Conference | 1/15/1998 | 1/15/1998 | 1/15/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - submit changes in duplicate for corridor draft stops and mec
|
INSP-Sprinkler Rough-in/Hydro | 1/14/1998 | 1/14/1998 | 1/14/1998 | A | PASS |
Rick Jackson
|
|
|
underground flush and hydro.
|
INSP - Framing/Rough-in | 1/12/1998 | 1/13/1998 | 1/13/1998 | A | PART |
Wes Worcester
|
|
|
01/13/98 342 -
|
INSP - Conference | 1/13/1998 | 1/13/1998 | 1/13/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 - submit area separation wall change
|
INSP - Wall cover | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | PASS |
Wes Worcester
|
|
|
12/23/97 342 - Scheduled by Hello!.
|
INSP - Wall cover | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | CANC |
|
|
|
Scheduled by Hello!. Cancelled by Hello! (Last update by [HLO]).
|
INSP - Conference | 12/22/1997 | 12/22/1997 | 12/22/1997 | P | PART |
Wes Worcester
|
|
|
12/22/97 342 -
|
INSP - Miscellaneous | 12/18/1997 | 12/19/1997 | 12/19/1997 | A | PART |
Wes Worcester
|
|
|
12/18/97 342 - WOULD LIKE AT 9 firecaulking all penetratiopns and r/r se
|
INSP - Framing/Rough-in | 12/11/1997 | 12/11/1997 | 12/11/1997 | P | PART |
Wes Worcester
|
|
|
12/11/97 342 - sheet rock nailing
|
INSP - Wall cover | 12/1/1997 | 12/2/1997 | 12/2/1997 | A | PART |
Wes Worcester
|
|
|
/ / 342 - PLEASE MEET JEFF AT 11:00--DRY WALL NAILING
|
INSP - Framing/Rough-in | 12/1/1997 | 12/1/1997 | 12/1/1997 | P | NR |
|
|
|
12/01/97 333 - given to wes
|
INSP - Carpentry | 12/1/1997 | 12/1/1997 | 12/1/1997 | P | PASS |
Wes Worcester
|
|
|
2hr wall 1st layer....frame inspection sent to Kim
|
INSP - Wall cover | 11/28/1997 | 12/1/1997 | 12/1/1997 | A | NR |
Wes Worcester
|
|
|
12/01/97 342 - would like at 11:00/ drywall nailing
|
INSP - Conference | 11/25/1997 | 11/26/1997 | 11/26/1997 | A | PART |
Wes Worcester
|
|
|
11/25/97 342 - WOULD LIKE AROUNND 10:30 OR 11:00 IF POSSIBLE
|
INSP - Conference | 11/19/1997 | 11/19/1997 | 11/19/1997 | P | PART |
Wes Worcester
|
|
|
11/19/97 342 - 3:30 pm
|
INSP - Conference | 11/18/1997 | 11/18/1997 | 11/18/1997 | P | FAIL |
Wes Worcester
|
|
|
11/18/97 342 - he called back and around 3:00 met w/arch, plan ck & contractor, 1 hr wall fix detail updated, arch submitting details for const in lieu of a parapet 5' protection, area sep overhang, wall detail fix, wall detail for self supporting 2 hr area separation and details for all changes from approved plan
|
INSP - Framing/Rough-in | 11/17/1997 | 11/17/1997 | 11/17/1997 | P | NR |
Wes Worcester
|
|
|
/ / 342 - two hour walls
|
INSP - Conference | 11/17/1997 | 11/17/1997 | 11/17/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - still do not have resubmittals....schedule conf w/arch, owne plan check
|
INSP - Framing/Rough-in | 11/12/1997 | 11/12/1997 | 11/12/1997 | P | FAIL |
|
|
|
11/12/97 333 - unable to find super
|
INSP - Conference | 11/6/1997 | 11/6/1997 | 11/6/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - no details to date requested on previous c/n ....do not proc submitted
|
INSP - Miscellaneous | 11/6/1997 | 11/6/1997 | 11/6/1997 | P | NR |
Wes Worcester
|
|
|
11/06/97 342 - NAILING FOR DRYWALL--WING A needs to finish seams and sti from architect....detail required before proceeding and if not received week, job will be stopped
|
INSP - Framing/Rough-in | 11/4/1997 | 11/4/1997 | 11/4/1997 | P | PART |
Tom Arcoraci
|
|
|
after 2:45 fire wall first layer ok
|
INSP - Wall cover | 10/30/1997 | 10/30/1997 | 10/30/1997 | P | FAIL |
Wes Worcester
|
|
|
10/30/97 342 - SHEETROCK NAILING 1:30 pm
|
INSP - Miscellaneous | 10/28/1997 | 10/28/1997 | 10/28/1997 | P | NR |
Wes Worcester
|
|
|
10/28/97 342 - MASONARY ON BACK WALL WING A.....no one there
|
INSP - Miscellaneous | 10/28/1997 | 10/28/1997 | 10/28/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - epoxy set and rebar for grout pour wall A
|
INSP - Miscellaneous | 10/27/1997 | 10/27/1997 | 10/28/1997 | P | PART |
Wes Worcester
|
|
|
10/28/97 342 - MASONARY....met contractor and architect on site....doing
|
INSP - Foundation | 10/10/1997 | 10/13/1997 | 10/13/1997 | A | NR |
Wes Worcester
|
|
|
steel support for brick/ as early as possible please
|
INSP - Footings | 10/8/1997 | 10/9/1997 | 10/9/1997 | A | NR |
Wes Worcester
|
|
|
no rebar on site yet
|
INSP - Footings | 10/7/1997 | 10/8/1997 | 10/8/1997 | P | NR |
Wes Worcester
|
|
|
GOOD SAMARITAN....will look at in am Thurs
|
Plan assigned to (M_P) | 7/7/1997 | | 9/26/1997 | | PASS |
Mike Phillips
|
|
|
09/26/97 10:34:24 DAR - this action updated by action script from <<>> in Case No. BLD97-1567
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/1997 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 9/26/1997 | | |
|
|
|
|
Print Occupancy Form | | | 9/26/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/26/1997 | | |
|
|
|
|
Received Certificate of Value | | | 9/25/1997 | | PASS |
|
|
|
RECEIVED UP DATED CERTIFICATE FOR WORK IN AREAS.
|
Print Pending Permit.LaserJet4 | | | 9/25/1997 | | PASS |
|
|
|
THIS PERMIT INCLUDES ACTIONS AND COMMENT FOR BLD97-2842 AND 97-2844
|
Plan Reviewer's activity | | | 9/25/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/8/1997 | | 9/16/1997 | | PASS |
|
|
|
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES. FOR RESUB REVIEW 9-16-97 RESUBS RETURNED ALONG WITH LETTER. ROUTED TO MIKE P.
|
Routing - MECHANICAL | | | 9/11/1997 | | PASS |
|
|
|
PACKAGE #1 FIELD REVIEW.
|
Plan Reviewer's activity | | | 9/11/1997 | | PEND |
|
|
|
WAITING FOR OUTSIDE STRUCTURAL REVIEW. WAITING FOR CERTIFICATE OF VALUES FOR EACH SIDE OF AREA SEPARATION WALLS, 3 ARE NEEDED.
|
Plan resubmittals received | | | 9/5/1997 | | |
|
|
|
Sent set of structural plans out for follow up review.
|
Routing - FIRE | 8/11/1997 | | 9/5/1997 | | PASS |
|
|
|
PACKAGE #1
|
90 day tracking............. | | 6/5/1997 | 9/3/1997 | | |
|
|
|
|
Meeting | | | 8/19/1997 | | |
|
|
|
Had meeting with Ben Hill and Ray Crowder on comment list. Architect will be submitting new revised plans.
|
Plan Reviewer's activity | | | 8/11/1997 | | FAIL |
|
|
|
Futher review from outside engineering firm required.
|
Print Pending Permit.LaserJet4 | | | 8/11/1997 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 8/1/1997 | | |
|
|
|
Rremoved from hold status. Architect is going to fully fire sprinkler the building. Fire sprinklers will be used for no building code substitutions at this time.
|
Telephone call | | | 8/1/1997 | | |
|
|
|
Received information from Architect that the Building will be fully fire sprinklered. Sprinklers will be used for no other purpose than to meet fire flow requirements. Removing project from the hold status.
|
Routing - FIRE | 7/10/1997 | | 7/15/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Plan Reviewer's activity | | | 7/15/1997 | | |
|
|
|
#1 Pending fire flow requirements. Information must be submitted to reflect what will be done to meet fire flo problems. #2 (REMOVED FROM HOLD STATUS 08/01/97) Review fire department concerns with architect. The building will be fully fire sprinklered to meet fire flow requirements.
|
Plan Reviewer's activity | | | 7/10/1997 | | FAIL |
|
|
|
SENT PLANS TO FIRE DEPARTMENT. FIRE FLOW PROBLEMS. MAY NEED TO UPGRADE CONSTRUCTION TYPE.
|
Plan assigned to (RGG) | 6/10/1997 | | 7/7/1997 | | |
|
|
|
|
Routing - PLANNING | 6/20/1997 | | 6/26/1997 | | PASS |
|
|
|
PACKAGE #2 X-REF: DR-89-97. APPROVED BY TKW.
|
Routing Off Site - STRUCTURAL | 6/10/1997 | | 6/26/1997 | | FAIL |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN, JONES Futher review from outside Engineering required.
|
Routing - PUBLIC WORKS | 6/10/1997 | | 6/20/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing - PLUMBING | 6/17/1997 | | 6/19/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - ELECTRICAL | 6/10/1997 | | 6/17/1997 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW FIELD VERIFY.
|
Routing Off Site - A.C.H.D | 6/10/1997 | | 6/16/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED RAY CROWDER AT###-#### TO TAKE PLANS OUT TO ACHD NO FEES DUE
|
Plan routing begun/NEW & ADDTN | | | 6/10/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/10/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 6/5/1997 | | 6/5/1997 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/5/1997 | | |
|
|
|
|
Application received | | | 6/5/1997 | | |
|
|
|
|
Received Certificate of Value | | | 6/4/1997 | | PASS |
|
|
|
|
INSP - Conference | 1/28/1998 | 1/29/1998 | 1/29/1997 | P | PART |
Wes Worcester
|
|
|
###-#### 2418 REDWAY IS WERE THE CONFERENCE IS at 3:30 pm
|