Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-01567
StatusFinaled
Name GOOD SAMARITAN HOME
Site Address 3501 W STATE ST
Project NameGOOD SAMARITAN HOME
Customer Number 
ePlanReviewNo
Description
GOOD SAMARITAN HOME * WING "A" * (SECTION 1 OF 4) A TWO HOUR AREA SEPARATION WALL WILL BE CONSTRUCTED AROUND WING "A". TO ADD APPROXIMATELY 294 SQ.FT. OF NEW FLOOR AREA AT THE EXISTNG PATION AREA FOR THE NEW BILLARD ROOM. REMODEL THE EXISTING EXTERIOR WALLS AROUND WING "A" AND UPGRADE TO MEET THE REQUIREMENTS OF A TWO HOUR AREA SPEARATION WALL. PERMIT TO INCLUDE THE ADDITION OF THE ONE-HOUR CEILING IN THE LIVING/DINING ROOM AREAS. THE INSTALLATION OF A 13-R FIRE SPRINKLER SYSTEM IS FOR FIRE FLOW REQUIREMENTS AND CAN NOT BE USED FOR ANY CODE REDUCTIONS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A1171.1 AND THE 1994 EDITION OF THE UBC. MJP (P.C.# 335-97) DRH97-089 THIS PERMIT INCLUDES ACTIONS AND COMMENTS FOR BLD97-2842 AND 97-2844.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/12/2014 DONE
Case Summary (BLD)  8/7/2014 DONE
Case Summary (BLD)  7/31/2014 DONE
Case Summary (BLD)  4/3/2001  
INSP-Final Inspection9/4/19989/4/19989/4/1998PPASS
DetailsRick Jackson
earl ###-#### occ approved
Permanent Occupancy 4/3/19984/3/1998 DONE
Details
Permanent occupancy  4/3/1998 PASS
Perm. Occ. Cert. #7188 issued 4-3-98 to the Good Samaritan Home.
INSP - Final3/31/19984/1/19984/1/1998PPASS
DetailsWes Worcester
03/31/98 342 - JEFF ###-#### ì
INSP - Framing/Rough-in3/26/19983/27/19983/27/1998PPASS
DetailsWes Worcester
03/27/98 342 - jeff ###-#### ì
INSP-Final Inspection3/23/19983/23/19983/23/1998APASS
DetailsRick Jackson
occ approved.
INSP - Wall cover3/19/19983/19/19983/19/1998 PASS
DetailsWes Worcester
/ / 342 -
INSP - Wall cover3/18/19983/19/19983/19/1998ANR
DetailsWes Worcester
03/19/98 342 - DRY WALL ON FIRE WALL--JEFF ###-####
INSP-Final Inspection3/13/19983/13/19983/13/1998PFAIL
DetailsRick Jackson
alarm plans, draft curtains, electrical box in attic
INSP-Sprinkler Rough-in/Hydro3/11/19983/13/19983/13/1998APASS
DetailsRick Jackson
BRUCE ###-####--GOOD SAMARITAN HOME was scheduled for wed but cancelled to wait for rick hydro completed
INSP-Sprinkler Rough-in/Hydro3/10/19983/11/19983/11/1998PCANC
DetailsJoe Tawney
03/11/98 406 - INSP CANCELLED
INSP - Framing/Rough-in3/9/19983/10/19983/10/1998APART
DetailsTom Arcoraci
03/10/98 408 - jess ###-####-fire wall dry wall BOILER ROOM HAS 2 LAYERS 5/8 ON CEILING EXT WALL EAST SIDE HAS 2 LAYERS ON EAVE
INSP - Framing/Rough-in2/26/19982/27/19982/27/1998PPART
DetailsWes Worcester
02/27/98 342 - PLEASE MEET AT 2:00--JEFF ###-####
INSP - Framing/Rough-in2/24/19982/25/19982/25/1998ANR
DetailsWes Worcester
02/25/98 342 - jeff ###-#### dry wall insp
INSP - Framing/Rough-in2/17/19982/18/19982/18/1998PPART
DetailsWes Worcester
02/18/98 342 - ###-####
INSP - Framing/Rough-in2/13/19982/17/19982/17/1998APASS
DetailsWes Worcester
02/17/98 342 - SHEETROCK NAILING ###-#### JEFF
INSP - Framing/Rough-in2/6/19982/9/19982/9/1998ANR
DetailsWes Worcester
02/08/98 342 - WING A--SHEET ROCK NAILING--JEFF ###-####
INSP - Wall cover2/9/19982/9/19982/9/1998 NH
DetailsWes Worcester
/ / 342 -
INSP - Final2/9/19982/9/19982/9/1998 FAIL
DetailsWes Worcester
/ / 342 - need electrical insp, address #'s, grading and replace soils front of house and garage side,etc
INSP - Wall cover2/6/19982/6/19982/6/1998PPASS
DetailsWes Worcester
02/06/98 342 - jeff ###-#### sheet rock nailing
INSP - Framing/Rough-in2/3/19982/3/19982/3/1998PPASS
DetailsWes Worcester
02/03/98 342 - SHEET ROCK NAILING--JEFF ###-####
INSP - Framing/Rough-in1/22/19981/23/19981/23/1998APART
DetailsWes Worcester
01/23/98 342 - jeff-###-#### ì
INSP - Framing/Rough-in1/14/19981/15/19981/15/1998APART
DetailsWes Worcester
01/14/98 342 - conf. ###-#### Jeff
INSP - Conference1/15/19981/15/19981/15/1998 PART
DetailsWes Worcester
/ / 342 - submit changes in duplicate for corridor draft stops and mec
INSP-Sprinkler Rough-in/Hydro1/14/19981/14/19981/14/1998APASS
DetailsRick Jackson
underground flush and hydro.
INSP - Framing/Rough-in1/12/19981/13/19981/13/1998APART
DetailsWes Worcester
01/13/98 342 -
INSP - Conference1/13/19981/13/19981/13/1998 PASS
DetailsWes Worcester
/ / 342 - submit area separation wall change
INSP - Wall cover12/23/199712/23/199712/23/1997PPASS
DetailsWes Worcester
12/23/97 342 - Scheduled by Hello!.
INSP - Wall cover12/23/199712/23/199712/23/1997PCANC
Details
Scheduled by Hello!. Cancelled by Hello! (Last update by [HLO]).
INSP - Conference12/22/199712/22/199712/22/1997PPART
DetailsWes Worcester
12/22/97 342 -
INSP - Miscellaneous12/18/199712/19/199712/19/1997APART
DetailsWes Worcester
12/18/97 342 - WOULD LIKE AT 9 firecaulking all penetratiopns and r/r se
INSP - Framing/Rough-in12/11/199712/11/199712/11/1997PPART
DetailsWes Worcester
12/11/97 342 - sheet rock nailing
INSP - Wall cover12/1/199712/2/199712/2/1997APART
DetailsWes Worcester
/ / 342 - PLEASE MEET JEFF AT 11:00--DRY WALL NAILING
INSP - Framing/Rough-in12/1/199712/1/199712/1/1997PNR
Details
12/01/97 333 - given to wes
INSP - Carpentry12/1/199712/1/199712/1/1997PPASS
DetailsWes Worcester
2hr wall 1st layer....frame inspection sent to Kim
INSP - Wall cover11/28/199712/1/199712/1/1997ANR
DetailsWes Worcester
12/01/97 342 - would like at 11:00/ drywall nailing
INSP - Conference11/25/199711/26/199711/26/1997APART
DetailsWes Worcester
11/25/97 342 - WOULD LIKE AROUNND 10:30 OR 11:00 IF POSSIBLE
INSP - Conference11/19/199711/19/199711/19/1997PPART
DetailsWes Worcester
11/19/97 342 - 3:30 pm
INSP - Conference11/18/199711/18/199711/18/1997PFAIL
DetailsWes Worcester
11/18/97 342 - he called back and around 3:00 met w/arch, plan ck & contractor, 1 hr wall fix detail updated, arch submitting details for const in lieu of a parapet 5' protection, area sep overhang, wall detail fix, wall detail for self supporting 2 hr area separation and details for all changes from approved plan
INSP - Framing/Rough-in11/17/199711/17/199711/17/1997PNR
DetailsWes Worcester
/ / 342 - two hour walls
INSP - Conference11/17/199711/17/199711/17/1997 FAIL
DetailsWes Worcester
/ / 342 - still do not have resubmittals....schedule conf w/arch, owne plan check
INSP - Framing/Rough-in11/12/199711/12/199711/12/1997PFAIL
Details
11/12/97 333 - unable to find super
INSP - Conference11/6/199711/6/199711/6/1997 FAIL
DetailsWes Worcester
/ / 342 - no details to date requested on previous c/n ....do not proc submitted
INSP - Miscellaneous11/6/199711/6/199711/6/1997PNR
DetailsWes Worcester
11/06/97 342 - NAILING FOR DRYWALL--WING A needs to finish seams and sti from architect....detail required before proceeding and if not received week, job will be stopped
INSP - Framing/Rough-in11/4/199711/4/199711/4/1997PPART
DetailsTom Arcoraci
after 2:45 fire wall first layer ok
INSP - Wall cover10/30/199710/30/199710/30/1997PFAIL
DetailsWes Worcester
10/30/97 342 - SHEETROCK NAILING 1:30 pm
INSP - Miscellaneous10/28/199710/28/199710/28/1997PNR
DetailsWes Worcester
10/28/97 342 - MASONARY ON BACK WALL WING A.....no one there
INSP - Miscellaneous10/28/199710/28/199710/28/1997 PASS
DetailsWes Worcester
/ / 342 - epoxy set and rebar for grout pour wall A
INSP - Miscellaneous10/27/199710/27/199710/28/1997PPART
DetailsWes Worcester
10/28/97 342 - MASONARY....met contractor and architect on site....doing
INSP - Foundation10/10/199710/13/199710/13/1997ANR
DetailsWes Worcester
steel support for brick/ as early as possible please
INSP - Footings10/8/199710/9/199710/9/1997ANR
DetailsWes Worcester
no rebar on site yet
INSP - Footings10/7/199710/8/199710/8/1997PNR
DetailsWes Worcester
GOOD SAMARITAN....will look at in am Thurs
Plan assigned to (M_P)7/7/1997 9/26/1997 PASS
DetailsMike Phillips
09/26/97 10:34:24 DAR - this action updated by action script from <<>> in Case No. BLD97-1567
PLANS/APPL TAKEN TO FRONT DESK  9/26/1997 PASS
Inspection Record Card- Bld  9/26/1997
Print Occupancy Form  9/26/1997
Issue PAID IN FULL permit  9/26/1997
Received Certificate of Value  9/25/1997 PASS
RECEIVED UP DATED CERTIFICATE FOR WORK IN AREAS.
Print Pending Permit.LaserJet4  9/25/1997 PASS
THIS PERMIT INCLUDES ACTIONS AND COMMENT FOR BLD97-2842 AND 97-2844
Plan Reviewer's activity  9/25/1997 PASS
Routing Off Site - STRUCTURAL9/8/1997 9/16/1997 PASS
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES. FOR RESUB REVIEW 9-16-97 RESUBS RETURNED ALONG WITH LETTER. ROUTED TO MIKE P.
Routing - MECHANICAL  9/11/1997 PASS
PACKAGE #1 FIELD REVIEW.
Plan Reviewer's activity  9/11/1997 PEND
WAITING FOR OUTSIDE STRUCTURAL REVIEW. WAITING FOR CERTIFICATE OF VALUES FOR EACH SIDE OF AREA SEPARATION WALLS, 3 ARE NEEDED.
Plan resubmittals received  9/5/1997
Sent set of structural plans out for follow up review.
Routing - FIRE8/11/1997 9/5/1997 PASS
PACKAGE #1
90 day tracking............. 6/5/19979/3/1997
Meeting  8/19/1997
Had meeting with Ben Hill and Ray Crowder on comment list. Architect will be submitting new revised plans.
Plan Reviewer's activity  8/11/1997 FAIL
Futher review from outside engineering firm required.
Print Pending Permit.LaserJet4  8/11/1997 FAIL
Plan Reviewer's activity  8/1/1997
Rremoved from hold status. Architect is going to fully fire sprinkler the building. Fire sprinklers will be used for no building code substitutions at this time.
Telephone call  8/1/1997
Received information from Architect that the Building will be fully fire sprinklered. Sprinklers will be used for no other purpose than to meet fire flow requirements. Removing project from the hold status.
Routing - FIRE7/10/1997 7/15/1997 FAIL
PACKAGE #1
Plan Reviewer's activity  7/15/1997
#1 Pending fire flow requirements. Information must be submitted to reflect what will be done to meet fire flo problems. #2 (REMOVED FROM HOLD STATUS 08/01/97) Review fire department concerns with architect. The building will be fully fire sprinklered to meet fire flow requirements.
Plan Reviewer's activity  7/10/1997 FAIL
SENT PLANS TO FIRE DEPARTMENT. FIRE FLOW PROBLEMS. MAY NEED TO UPGRADE CONSTRUCTION TYPE.
Plan assigned to (RGG)6/10/1997 7/7/1997
Routing - PLANNING6/20/1997 6/26/1997 PASS
PACKAGE #2 X-REF: DR-89-97. APPROVED BY TKW.
Routing Off Site - STRUCTURAL6/10/1997 6/26/1997 FAIL
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN, JONES Futher review from outside Engineering required.
Routing - PUBLIC WORKS6/10/1997 6/20/1997 PASS
PACKAGE #2
Routing - PLUMBING6/17/1997 6/19/1997 PASS
PACKAGE #1
Routing - ELECTRICAL6/10/1997 6/17/1997 PASS
PACKAGE #1 NO REVIEW FIELD VERIFY.
Routing Off Site - A.C.H.D6/10/1997 6/16/1997 PASS
PACKAGE #4 CONTACTED RAY CROWDER AT###-#### TO TAKE PLANS OUT TO ACHD NO FEES DUE
Plan routing begun/NEW & ADDTN  6/10/1997 PASS
Plans ACCEPTED BY PLAN CHECK  6/10/1997 PASS
Plan assigned to (MYS)6/5/1997 6/5/1997
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  6/5/1997
Application received  6/5/1997
Received Certificate of Value  6/4/1997 PASS
INSP - Conference1/28/19981/29/19981/29/1997PPART
DetailsWes Worcester
###-#### 2418 REDWAY IS WERE THE CONFERENCE IS at 3:30 pm