Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD97-01615
StatusFinaled
Name QUICK LUBE INC.
Site Address 8488 W OVERLAND RD
Project NameQUICK LUBE INC.
Customer Number 
ePlanReviewNo
Description
(QUICK LUBE INC)(NEW BUILDING) TO CONSTRUCT A NEW (1) ONE STORY WITH BASEMENT VEHICLE LUBE FACILITY WITH 1664 SQUARE FEET OF MAIN AND 1472 SQUARE FEET OF BASEMENT, PAVED PARKING AND LANDSCAPED PLANTERS. CONSTRUCTION TO BE CONCRETE BLOCK, CONCRETE FOUNDATION AND FLOOR SYSTEMS, WOOD TRUSSES, AND SHEET ROCKED INTERIOR. ALL PER APPROVED PLANS ON FILE AND DESIGN REVIEW. DR-17-97 CU-9-97 PC#348-97 NOTE! THIS BUILDING IS NOT FIRE SPRINKLERED. CONSTRUCT NEW VEHICLE LUBE FACILITY CONSTRUCT NEW VEHICLE LUBE FACILITY
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/12/2008  
Case Summary (BLD)  3/20/2002 DONE
Permanent Occupancy 5/4/19995/4/1999 DONE
Details
INSP - Final5/3/19995/4/19995/4/1999APASS
DetailsJim Storey
05/04/99 301 - ###-#### DICK//FINAL @ QUIK LUBE
Code Occupancy Approval  5/3/1999 PASS
Meets compliance with DR-17-97 Pass.
Code Occupancy Approval  4/30/1999
Final occ requested by Richard Sutherland office: ###-####, ###-####, cell: ###-####
Temporary occupancy  11/24/1998 PASS
Temp. Occ. Cert. #3748 issued 11-24-98 to Quick Lube, Inc.
INSP - Final11/23/199811/24/199811/23/1998APART
Details
11/24/98 338 - CLINT ###-#### MADEOK FOR TEMP PER CODE ENF. AND PLMG.
INSP-Final Inspection11/20/199811/23/199811/20/1998ACANC
DetailsJoe Tawney
CLINT ###-####
INSP - Final11/20/199811/20/199811/20/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR PERM OCC
INSP - Final11/20/199811/20/199811/20/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR PERM OCC
INSP-Final Inspection11/9/199811/10/199811/13/1998PNR
Details
11/10/98 338 - OTH-OTHER AGENCIES NOT APPROVED
Code Occupancy Approval  11/12/1998 FAIL
Posted Bond - $550.00 Cashier Check - plantings are still required. They have filled in the planters with bark so it is more presentable for the time being. At the time they put plants in planters around the building perimeter they will also replace the dead arbs around the dumpster screen area. Contact Person: Clint Green ####-####
INSP-Final Inspection11/9/199811/10/199811/10/1998AFAIL
DetailsJoe Tawney
11/10/98 406 - PUT IN WRONG INSP SHOULD BE JOE FOR FIRE INSP FINAL FAIL EXIT DOOR HDWRE, ADDRESS, FIRE EXT,LIST OF F&C LIQUIDS
INSP - Framing/Rough-in10/19/199810/19/199810/19/1998PPASS
Details
10/19/98 338 - made ok to cover c/n removed
INSP - Framing/Rough-in10/1/199810/5/199810/5/1998ANR
Details
10/05/98 338 - clint ###-#### c/n on site elec ok no plmg or htg need to seal horiz from vert
INSP - Foundation9/1/19989/2/19989/2/1998APART
Details
09/02/98 338 - suspended slab clint ###-#### made ok with sp insp approv
INSP - Framing/Rough-in8/10/19988/10/19988/10/1998PPART
Details
08/10/98 338 - MADE OK TO POUR THE BASEMENT WALLS AS THE R-BAR AND WELD
Print Occupancy Form  8/4/1998
Inspection Record Card- Bld  8/4/1998
INSP - Framing/Rough-in7/30/19987/31/19987/31/1998APASS
DetailsJim Storey
07/31/98 301 - donnie ###-#### footing FTG -OK FOOTING
(F) Reprint permit  7/9/1998
Routing - PLAN CHECK7/29/1997 7/8/1998 PASS
PACKAGE #1
Plan assigned to (JCM)10/30/1997 7/8/1998 PASS
DetailsJohn Menard
PROJECT WAS STARTED BY BOB GARRISON AND WAS NOT ISSUED BEFORE BOB RETIRED. THE PROJECT WAS ASSIGNED TO JOHN MENARD TO FINISH AND ISSUE.
Routing - PLAN CHECK7/11/1997 7/8/1998 PASS
PACKAGE #3
Routing - PLAN CHECK8/1/1997 7/8/1998 PASS
PACKAGE #4
PLANS/APPL TAKEN TO FRONT DESK  7/8/1998 PASS
Print Occupancy Form  7/8/1998
Inspection Record Card- Bld  7/8/1998
Telephone call  7/8/1998
CALLED DICK PERMIT READY ###-####
Issue PAID IN FULL permit  7/8/1998
Routing - PLAN CHECK8/18/1997 7/8/1998 PASS
PACKAGE #2
Plan Reviewer's activity  3/17/1998 PEND
SENT JOHN COOK A LETTER, LET HIM KNOW THAT THIS PROJECT IS GOING TO BE VOIDED IF HE OR THE APPLICANT DOES NOT REQUEST AN EXTENSION.
Plan assigned to (RGG)6/16/1997 10/30/1997 PASS
90 day tracking............. 6/9/19979/7/1997 PEND
Plan resubmittals received  8/19/1997 PEND
Telephone call  8/19/1997 PEND
CALL ARCHITECT, H. JOHN COOK TO INFORM HIM THAT THE PERMIT WOULD BE READY TO ISSUE AFTER THE CITY WAS INFORMED OF THE CONTRACTOR'S NAME; A NEW CERTIFICATE OF VALUE WAS SUBMITTED AND THE ACHD FEES HAD BEEN PAID. HE INDICATED THAT HE WOULD FORWARD THE INFORMATION TO THE OWNER FOR ACTION.
Routing - PUBLIC WORKS7/17/1997 8/18/1997 PASS
PACKAGE #2 RESUBS TO PW ATTN: MIKE HUNTER 8/12/97. P-1, P-2
Plan resubmittals received  8/15/1997 PEND
RECEIVED RESUBMITTALS FROM JOHN COOK
Routing Off Site - A.C.H.D6/19/1997 8/1/1997 PEND
PACKAGE #4 CONTACTED RICHARD SUTHERLAND AT ###-#### TO TAKE PLANS OUT TO ACHD. FEES NOT PAID
Routing - ELECTRICAL7/25/1997 7/28/1997 PASS
PACKAGE #1
Routing - PLUMBING7/23/1997 7/24/1997 PASS
PACKAGE #1
Routing - PLAN CHECK7/17/1997 7/23/1997
PACKAGE #1
Routing - FIRE7/10/1997 7/16/1997 PASS
PACKAGE #1
Routing - PLANNING6/19/1997 7/16/1997 PASS
PACKAGE #2 Approved by: RLB & TKW
Routing Off Site - STRUCTURAL6/19/1997 7/11/1997
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL.
Routing - MECHANICAL7/10/1997 7/10/1997 PASS
PACKAGE #1
Routing - PLAN CHECK6/30/1997 7/10/1997 PASS
PACKAGE #1
Plan resubmittals requested  7/10/1997 PEND
RGARRISON SENT CORRECTION LIST TO ARCHITECT FOR RESUBMITTALS.
Routing - ELECTRICAL6/24/1997 6/30/1997 FAIL
PACKAGE #1 MUST BE DONE BY ENGINEER QUALIFIED TO DO ELECTRICAL. JS
Routing - PLUMBING6/19/1997 6/23/1997 FAIL
PACKAGE #1
Plan routing begun/NEW & ADDTN  6/19/1997 PASS
SEE ACTION 007 PASS
Plans ACCEPTED BY PLAN CHECK  6/19/1997 PASS
RECEIVED STAMPED AND SIGNED TOPO SHEETS PLANS ARE READY TO ROUTE.
Plan routing begun/NEW & ADDTN  6/16/1997 HOLD
SEE ACTION 007 HOLD
Plans ACCEPTED BY PLAN CHECK  6/16/1997 HOLD
CONTACTED RICH SUTHERLAND TO LET HIM KNOW THAT PACKAGE #2 NEEDS THE TOPO SHEETS STAMPED AND SIGNED.
Plan assigned to (MYS)6/9/1997 6/9/1997
DetailsMarlene Southard
Application received  6/9/1997
Recd Pcfee & Taken To Pln CK  6/9/1997
Received Certificate of Value  6/9/1997 PASS