Case Summary (BLD) | | | 10/1/2002 | | |
|
|
|
|
Code Occupancy Approval | | | 8/21/1998 | | PASS |
|
|
|
Finally...compliance with DRH97-0058 - Signed Final
|
INSP - Final | 1/15/1998 | 1/15/1998 | 1/15/1998 | P | PASS |
Jim Sly
|
|
|
01/15/98 316 - Perm Occ on shell (Health and Welfare).
|
Code Occupancy Approval | | | 1/15/1998 | | TEMP |
|
|
|
Inspected on 1/7/98 - Bonding required for Slatting chain link fene -east proj./Landscaping at rear (north) and side (northwest) cor. of proj./shields for lighting on north (back) side of bldg. (adj. townhouse proj)/Bike rack. Bond in the amount of $7,893.00 - posted on 1/15/98 - Temporary signed.
|
INSP - Final | 12/26/1997 | 12/26/1997 | 12/26/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR CERT OF COMPLETION ON SHELL
|
INSP-Final Inspection | 12/10/1997 | 12/19/1997 | 12/19/1997 | P | FAIL |
Joe Tawney
|
|
|
12/19/97 406 - FINAL ON SHELL FAIL BLDG ADDRESS SPKLR SYSTEM NOT TURNE
|
INSP-Sprinkler Rough-in/Hydro | 12/12/1997 | 12/12/1997 | 12/12/1997 | P | PASS |
Rick Jackson
|
|
|
12/12/97 409 - 3:00 AS PER RICK hydro fo sprinkler system
|
INSP-Sprinkler Rough-in/Hydro | 11/10/1997 | 11/10/1997 | 11/10/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - SPKLR ROUGH IN FAIL OVERSPACING AT WALLS AUX DRAIN
|
INSP-Sprinkler Rough-in/Hydro | 11/5/1997 | 11/5/1997 | 11/5/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST FOR SHELL
|
INSP-Supply line flush | 10/30/1997 | 10/30/1997 | 10/30/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Roof | 10/24/1997 | 10/27/1997 | 10/27/1997 | A | PASS |
Jim Sly
|
|
|
10/24/97 316 -
|
INSP - Roof | 10/22/1997 | 10/22/1997 | 10/22/1997 | P | PART |
Jim Sly
|
|
|
10/22/97 316 - ROOF-NAIL...West 75'...Call for insp of remaining roof...
|
INSP - Framing/Rough-in | 10/17/1997 | 10/17/1997 | 10/17/1997 | P | NR |
Tom Arcoraci
|
|
|
10/17/97 408 -
|
INSP - Footings | 9/26/1997 | 9/26/1997 | 9/26/1997 | P | PART |
Jim Sly
|
|
|
09/26/97 316 - OK pending special inspection approval..
|
INSP - Wall cover | 9/23/1997 | 9/26/1997 | 9/26/1997 | A | PART |
Jim Sly
|
|
|
09/25/97 316 - OK Pending special inspection and approval.
|
INSP - Wall cover | 9/23/1997 | 9/24/1997 | 9/24/1997 | P | PART |
Jim Sly
|
|
|
09/23/97 316 - CONCRETE TILT UPS OK Pending special insp approval..
|
INSP - Wall cover | 9/17/1997 | 9/19/1997 | 9/19/1997 | A | PART |
Jim Sly
|
|
|
09/18/97 316 - 47 YARDS POURING SLAB, REBAR SPEC INSPECTOR ON JOB SITE A SATURDAY OK Pending spec insp approval...
|
INSP - Wall cover | 9/17/1997 | 9/18/1997 | 9/18/1997 | A | PART |
Jim Sly
|
|
|
/ / 316 - CONCRETE SLAB, POURING 41 YEARDS, REBAR. OK pending spec i SPEC. INSPECTOR ON SITE
|
Routing - PLANNING | 9/15/1997 | | 9/17/1997 | | PASS |
|
|
|
REVISED PLANS ARE IN MARTIN SANTOYO'S OFFICE. MO 9-15-97
|
Plan assigned to (M_O) | 9/8/1997 | | 9/17/1997 | | PASS |
|
|
|
ADDITIONAL STRUCTURAL REVIEW AS REQUIRED BY INSPECTOR. MO APPROVED REVSIED PLANS SENT BACK TO JIM SLY 9-17-97. MO
|
Routing - PLAN CHECK | 9/8/1997 | | 9/12/1997 | | PASS |
|
|
|
REVISED PLANS ROUTED THROUGH INSPECTOR.
|
INSP - Foundation | 9/10/1997 | 9/11/1997 | 9/11/1997 | A | PART |
Jim Sly
|
|
|
09/10/97 316 - CONCRETE SLAB OK pending special inspection and approval
|
90 day tracking............. | | 6/12/1997 | 9/10/1997 | | PEND |
|
|
|
|
INSP - Foundation | 9/8/1997 | 9/8/1997 | 9/9/1997 | P | PART |
Jim Sly
|
|
|
09/08/97 316 - CONCRETE SLAB- Tilt up...OK pending spec insp approval..
|
Additional plans submitted | | | 9/8/1997 | | |
|
|
|
REVISED STRUCTURAL PLANS SUBMITTED FOR REVIEW BY PLAN CHECK FROM INSPECTOR. MO
|
INSP - Miscellaneous | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | PART |
Jim Sly
|
|
|
09/03/97 316 - OK pending spec insp approval...
|
INSP - Footings | 8/28/1997 | 8/29/1997 | 8/29/1997 | A | PART |
Jim Sly
|
|
|
08/28/97 316 - 28 YARDS 10:00 flatwork...OK pending spec insp approv...
|
INSP - Flatwork | 8/27/1997 | 8/27/1997 | 8/27/1997 | P | PART |
Jim Sly
|
|
|
08/27/97 316 - slab work on floor OK pending special insp approval...
|
INSP - Footings | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | FAIL |
|
|
|
08/26/97 338 - re-bar pouring at 1 p.m. POURED W/O CITY INSP 3500 PSI 1 SP INSP. NO SP INSP LETTER ON SITE
|
(F) Reprint permit | | | 8/26/1997 | | |
|
|
|
|
(F) Reprint permit | | | 8/20/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/20/1997 | | |
|
|
|
|
Plan resubmittals received | | | 8/15/1997 | | PEND |
|
|
|
RECEIVED PLANS FROM PINNACLE ENGINEERS INC. VIA MARK KNOWLES, CONCERNING REVISIONS TO EXTERIOR WALL PANELS. PASSED ON FOR INSPECTOR JIM SLY.
|
Print Occupancy Form | | | 7/28/1997 | | |
|
|
|
|
Telephone call | | | 7/28/1997 | | |
|
|
|
PERMIT READY, FEE DUE
|
Inspection Record Card- Bld | | | 7/28/1997 | | |
|
|
|
|
Plan assigned to (M_O) | 7/2/1997 | | 7/25/1997 | | PEND |
|
|
|
|
Plan resubmittals received | | | 7/25/1997 | | PASS |
|
|
|
ADDITIONAL RESUBMITTALS RECEIVED FOR PKG #3 AS REQUESTED BY K. JONES STRUCTRUAL REVIEWING ENGINEER. MO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/22/1997 | | 7/25/1997 | | PASS |
|
|
|
PACKAGE #3 REVISED PLANS SENT TO ATWOOD, HINZMAN, JONES VIA PDQ. PLANS RETURNED BY ARCHITECT APPROVED ON 7-25-97. MO
|
Routing - PUBLIC WORKS | 7/16/1997 | | 7/23/1997 | | PASS |
|
|
|
package #2
|
Plan resubmittals received | | | 7/22/1997 | | PEND |
|
|
|
RECEIVED STAMPED AND SIGNED PLANS FROM STRUCTURAL ENGINEER. PLANS SENT TO K. JONES FOR REVIEW. MO
|
Plan resubmittals received | | | 7/21/1997 | | FAIL |
|
|
|
RECEIVED REVISED STRUCTURAL PLANS 7/21 THAT CONTAIN ONLY ONE SET OF PLANS THAT ARE NOT STAMPED AND SIGNED BY THE ENGINEER AND A LINE ITEM WRITTEN RESPONSE THAT HAS NOT BEEN SIGNED BY THE ENGINEER. ARCHITECT CONTACTED 7/21. MO
|
Routing - PLANNING | 7/14/1997 | | 7/15/1997 | | PASS |
|
|
|
PACKAGE #2 X-REF: DR-58-97. APPROVED BY MGS.
|
Routing Off Site - STRUCTURAL | 6/17/1997 | | 7/11/1997 | | FAIL |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES
|
Routing - FIRE | 7/3/1997 | | 7/10/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 7/9/1997 | | 7/9/1997 | | FAIL |
|
|
|
PACKAGE #2 X-REF: DR-58-97. NEED REVISED LANDSCAPE PLAN, COMPLYING WITH DESIGN REVIEW CONDITIONS. PHONED MARK K 7/9/97. REVIEWED BY MGS.
|
Routing - PUBLIC WORKS | 6/17/1997 | | 7/8/1997 | | FAIL |
|
|
|
PACKAGE #2 REQUIRES A LIGHTING DESIGN SHOWING FIXTURE TYPE, POLE TYPE, AN POWER SOURCE LOCATIONS FOR WESTGATE PHASE II - WESTGATE & FAIRVIEW, AND EACH ENTRANCE ON WESTGATE DRIVE.
|
Plan Reviewer's activity | | | 7/3/1997 | | PEND |
|
|
|
Corrections mailed and faxed to architect 7-3-97. MO
|
Plan assigned to (RGG) | 6/17/1997 | | 7/2/1997 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 6/17/1997 | | 6/30/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED MARK KNOWLES AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES NOT PAID. FEES PAID 6-30-97 RECEIPT # 97-1447.
|
Routing - ELECTRICAL | 6/20/1997 | | 6/23/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLUMBING | 6/17/1997 | | 6/19/1997 | | PASS |
|
|
|
PACKAGE #1
|
Plan routing begun/NEW & ADDTN | | | 6/17/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 6/12/1997 | | 6/17/1997 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/12/1997 | | PASS |
|
|
|
|
Received Certificate of Value | | | 6/12/1997 | | PASS |
|
|
|
|
Application received | | | 6/12/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/12/1997 | | |
|
|
|
|