Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-01685
StatusExpired
Name DAVID TURNBULL
Site Address 6225 N MEEKER PL
Project NameOLYMPUS BLDG
Customer Number 
ePlanReviewNo
Description
OLYMPUS BUILDING (BRIGHTON CAMPUS NO. 2) * TO CONSTRUCT A 22228 SQ. FT., TWO STORY, FULLY FIRE SPRINKLERED, TYPE II-N, OFFICE SHELL BUILDING. OTHER WORK INCLUDES ALL RELATED SITE IMPROVEMENTS, PAVING AND LANDSCAPING PER DR#60-96 AND PC#359-97 NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE PLANS FOR THE TENANT IMPROVEMENTS MUST BE SUBMITTED TO THE BUILDING DEPT. SQ. FOOTAGE OF FIRST AND SECOND FLOORS IS 11392 AND THE FIRE SPRINKLERS ARE USED FOR AREA INCREASE.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Letter of compliance12/11/199812/11/199812/11/1998 PASS
DetailsJim Sly
/ / 316 - C/C # 16311
INSP - Letter of compliance12/11/199812/11/199812/11/1998 PASS
DetailsJim Sly
/ / 316 - C/C # 16311
INSP - Final12/10/199812/10/199812/10/1998 PASS
DetailsJim Sly
/ / 316 - C/C # 16311
INSP - Final11/16/199811/16/199811/16/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION
INSP-Final Inspection11/9/199811/10/199811/10/1998AFAIL
DetailsJoe Tawney
11/10/98 406 - DENNIS -###-#### FN FIRE INSP REINSP FAIL PERM BLDG ADDRESS, REPLACE 3 LED'S FOR DUCT DET
INSP - Final11/6/199811/9/199811/10/1998PFAIL
DetailsJim Sly
11/10/98 316 - Complete prev corrections....
INSP-Final Inspection11/6/199811/9/199811/9/1998ANR
DetailsJoe Tawney
11/09/98 406 - DENNIS ###-#### REINSP NOT READY
INSP-Final Inspection10/28/199810/28/199810/28/1998PPART
DetailsJoe Tawney
10/28/98 406 - ###-####-odie fn insp-call 1st FINAL OK FOR TEMP ON SHELL PERM BLDG ADDRESS KNOX BOX
Code Occupancy Approval  8/5/1998 N/R
Requested insp. for Final - N/R - need to complete landscaping at N. boundary, walkway connection, northeast portion at encl. not complete, screening at transformer along Meeker & Bike Rack.
INSP - Final7/27/19987/27/19987/27/1998PFAIL
DetailsJim Sly
07/27/98 316 - C/N...Need all req signatures Occ request..Need letter of
INSP-Final Inspection6/15/19986/16/19986/16/1998PPART
DetailsJoe Tawney
06/16/98 406 - READY 1 BRIAN ###-#### ALARM TEST FOR SPKLR SYSTEM OK
INSP-Supply line flush5/20/19985/20/19985/20/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUNG FLUSH
INSP-Sprinkler Rough-in/Hydro5/20/19985/20/19985/20/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON ABOVE AND UNDERGROUND HYDRO TESTS
INSP-Sprinkler Rough-in/Hydro5/20/19985/20/19985/20/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON ROUGH IN OF 2ND FLR
INSP-Sprinkler Rough-in/Hydro4/16/19984/16/19984/16/1998 PART
OK ON ROUGH IN OF 1ST FLOOR
Code Occupancy Approval  2/5/1998 PASS
MEETS COMPLIANCE WITH DR-60-96
INSP - Footings10/10/199710/10/199710/10/1997PPART
DetailsJim Sly
10/10/97 316 - OK pending special insp and approval...Partial foot pour.
(F) Reprint permit  10/9/1997
Telephone call  10/7/1997
called and left message permit was ready and amount on it.
PLANS/APPL TAKEN TO FRONT DESK  10/7/1997 PASS
Print Occupancy Form  10/7/1997
Inspection Record Card- Bld  10/7/1997
Issue PAID IN FULL permit  10/7/1997
(F) Reprint permit  10/7/1997
Plan assigned to (M_O)8/25/1997 10/6/1997 PASS
Routing Off Site - STRUCTURAL9/26/1997 10/3/1997 PASS
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES
Plan resubmittals received  10/3/1997 PASS
PLANS ARE DATE STAMPED 10-01-97 AS RECEIVED BY BLDG. DEPT. . PLANS RECEIVED BY MO ON 10-03-97.
Plan resubmittals received  9/30/1997 FAIL
STRUCTRUAL REVISIONS. PLANS ALL STAMPED WITH A NEVADA ENGINEER STAMP. ARCHITECT CONTACTED TO GET CORRECTED 9-30-97. MO
Application received  9/29/1997
Plan resubmittals received  9/26/1997 PEND
STRUCTRUAL RESUBMITTALS RECEIVED AND SENT BACK TO JONES FOR REVIEW. MO
Routing - FIRE9/15/1997 9/26/1997 PASS
90 day tracking............. 6/16/19979/14/1997 PEND
Plan resubmittals requested  9/12/1997 PEND
FAXED GORDON McDONALD A COPY OF THE STRUCTURAL REVIEW COMMMENTS FROM ATWOOD-HINZMAN-JONES. ATWOOD-HINZMAN-JONES HAS INDICATED THAT THE REQUIRED REVISIONS ARE SIGNIFICANT ENOUGH THAT THEY WANT TO REVIEW THE RESUBMITTED PLANS AND CALCULATIONS.
Routing Off Site - STRUCTURAL8/28/1997 9/12/1997 FAIL
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN JONES
Routing - PLUMBING8/5/1997 9/7/1997 PASS
Routing - PLAN CHECK8/8/1997 8/28/1997 PASS
Plan resubmittals requested  8/27/1997 PEND
CORRECTIONS FAXED AND MAILED TO ARCHITECT 8-27-97. MO
Plan assigned to (RGG)6/20/1997 8/25/1997 PASS
Routing - ELECTRICAL7/28/1997 8/4/1997 PASS
Routing - PUBLIC WORKS8/4/1997 8/4/1997 PASS
Routing - PLANNING7/24/1997 7/28/1997 PASS
X-REF: DR-60-96. APPROVED BY TKW.
Routing - PUBLIC WORKS7/15/1997 7/23/1997 FAIL
REQUIRES DRAINAGE PLAN REVISION
Routing Off Site - A.C.H.D6/20/1997 7/11/1997 PASS
CONTACTED GORDON MCDONALD AT ###-#### TO TAKE PLANS OUT TO ACHD. AS OF 7-15-97 FEES NOT PAID. ACHD FEES PAID 9/29/97 RECEIPT ON FILE.
Plans ACCEPTED BY PLAN CHECK  6/20/1997 PASS
Plan routing begun/NEW & ADDTN  6/20/1997 PASS
Plan assigned to (MYS)6/16/1997 6/20/1997
DetailsMarlene Southard
Received Certificate of Value  6/20/1997 PEND
CONTACTED GORDON MCDONALD TO LET HIM KNOW THAT HE NEEDS TO RESUBMIT HIS CERT. OF VALUE WITHOUT COMB. MECH. AND PLUMB.
Recd Pcfee & Taken To Pln CK  6/16/1997
Application received  6/16/1997