INSP - Letter of compliance | 12/11/1998 | 12/11/1998 | 12/11/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 16311
|
INSP - Letter of compliance | 12/11/1998 | 12/11/1998 | 12/11/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 16311
|
INSP - Final | 12/10/1998 | 12/10/1998 | 12/10/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 16311
|
INSP - Final | 11/16/1998 | 11/16/1998 | 11/16/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION
|
INSP-Final Inspection | 11/9/1998 | 11/10/1998 | 11/10/1998 | A | FAIL |
Joe Tawney
|
|
|
11/10/98 406 - DENNIS -###-#### FN FIRE INSP REINSP FAIL PERM BLDG ADDRESS, REPLACE 3 LED'S FOR DUCT DET
|
INSP - Final | 11/6/1998 | 11/9/1998 | 11/10/1998 | P | FAIL |
Jim Sly
|
|
|
11/10/98 316 - Complete prev corrections....
|
INSP-Final Inspection | 11/6/1998 | 11/9/1998 | 11/9/1998 | A | NR |
Joe Tawney
|
|
|
11/09/98 406 - DENNIS ###-#### REINSP NOT READY
|
INSP-Final Inspection | 10/28/1998 | 10/28/1998 | 10/28/1998 | P | PART |
Joe Tawney
|
|
|
10/28/98 406 - ###-####-odie fn insp-call 1st FINAL OK FOR TEMP ON SHELL PERM BLDG ADDRESS KNOX BOX
|
Code Occupancy Approval | | | 8/5/1998 | | N/R |
|
|
|
Requested insp. for Final - N/R - need to complete landscaping at N. boundary, walkway connection, northeast portion at encl. not complete, screening at transformer along Meeker & Bike Rack.
|
INSP - Final | 7/27/1998 | 7/27/1998 | 7/27/1998 | P | FAIL |
Jim Sly
|
|
|
07/27/98 316 - C/N...Need all req signatures Occ request..Need letter of
|
INSP-Final Inspection | 6/15/1998 | 6/16/1998 | 6/16/1998 | P | PART |
Joe Tawney
|
|
|
06/16/98 406 - READY 1 BRIAN ###-#### ALARM TEST FOR SPKLR SYSTEM OK
|
INSP-Supply line flush | 5/20/1998 | 5/20/1998 | 5/20/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUNG FLUSH
|
INSP-Sprinkler Rough-in/Hydro | 5/20/1998 | 5/20/1998 | 5/20/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ABOVE AND UNDERGROUND HYDRO TESTS
|
INSP-Sprinkler Rough-in/Hydro | 5/20/1998 | 5/20/1998 | 5/20/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ROUGH IN OF 2ND FLR
|
INSP-Sprinkler Rough-in/Hydro | 4/16/1998 | 4/16/1998 | 4/16/1998 | | PART |
|
|
|
OK ON ROUGH IN OF 1ST FLOOR
|
Code Occupancy Approval | | | 2/5/1998 | | PASS |
|
|
|
MEETS COMPLIANCE WITH DR-60-96
|
INSP - Footings | 10/10/1997 | 10/10/1997 | 10/10/1997 | P | PART |
Jim Sly
|
|
|
10/10/97 316 - OK pending special insp and approval...Partial foot pour.
|
(F) Reprint permit | | | 10/9/1997 | | |
|
|
|
|
Telephone call | | | 10/7/1997 | | |
|
|
|
called and left message permit was ready and amount on it.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/1997 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/7/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/7/1997 | | |
|
|
|
|
(F) Reprint permit | | | 10/7/1997 | | |
|
|
|
|
Plan assigned to (M_O) | 8/25/1997 | | 10/6/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/26/1997 | | 10/3/1997 | | PASS |
|
|
|
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES
|
Plan resubmittals received | | | 10/3/1997 | | PASS |
|
|
|
PLANS ARE DATE STAMPED 10-01-97 AS RECEIVED BY BLDG. DEPT. . PLANS RECEIVED BY MO ON 10-03-97.
|
Plan resubmittals received | | | 9/30/1997 | | FAIL |
|
|
|
STRUCTRUAL REVISIONS. PLANS ALL STAMPED WITH A NEVADA ENGINEER STAMP. ARCHITECT CONTACTED TO GET CORRECTED 9-30-97. MO
|
Application received | | | 9/29/1997 | | |
|
|
|
|
Plan resubmittals received | | | 9/26/1997 | | PEND |
|
|
|
STRUCTRUAL RESUBMITTALS RECEIVED AND SENT BACK TO JONES FOR REVIEW. MO
|
Routing - FIRE | 9/15/1997 | | 9/26/1997 | | PASS |
|
|
|
|
90 day tracking............. | | 6/16/1997 | 9/14/1997 | | PEND |
|
|
|
|
Plan resubmittals requested | | | 9/12/1997 | | PEND |
|
|
|
FAXED GORDON McDONALD A COPY OF THE STRUCTURAL REVIEW COMMMENTS FROM ATWOOD-HINZMAN-JONES. ATWOOD-HINZMAN-JONES HAS INDICATED THAT THE REQUIRED REVISIONS ARE SIGNIFICANT ENOUGH THAT THEY WANT TO REVIEW THE RESUBMITTED PLANS AND CALCULATIONS.
|
Routing Off Site - STRUCTURAL | 8/28/1997 | | 9/12/1997 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN JONES
|
Routing - PLUMBING | 8/5/1997 | | 9/7/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/8/1997 | | 8/28/1997 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 8/27/1997 | | PEND |
|
|
|
CORRECTIONS FAXED AND MAILED TO ARCHITECT 8-27-97. MO
|
Plan assigned to (RGG) | 6/20/1997 | | 8/25/1997 | | PASS |
|
|
|
|
Routing - ELECTRICAL | 7/28/1997 | | 8/4/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/4/1997 | | 8/4/1997 | | PASS |
|
|
|
|
Routing - PLANNING | 7/24/1997 | | 7/28/1997 | | PASS |
|
|
|
X-REF: DR-60-96. APPROVED BY TKW.
|
Routing - PUBLIC WORKS | 7/15/1997 | | 7/23/1997 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION
|
Routing Off Site - A.C.H.D | 6/20/1997 | | 7/11/1997 | | PASS |
|
|
|
CONTACTED GORDON MCDONALD AT ###-#### TO TAKE PLANS OUT TO ACHD. AS OF 7-15-97 FEES NOT PAID. ACHD FEES PAID 9/29/97 RECEIPT ON FILE.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/20/1997 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/20/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 6/16/1997 | | 6/20/1997 | | |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 6/20/1997 | | PEND |
|
|
|
CONTACTED GORDON MCDONALD TO LET HIM KNOW THAT HE NEEDS TO RESUBMIT HIS CERT. OF VALUE WITHOUT COMB. MECH. AND PLUMB.
|
Recd Pcfee & Taken To Pln CK | | | 6/16/1997 | | |
|
|
|
|
Application received | | | 6/16/1997 | | |
|
|
|
|