Description
(BUS-MAINTENANCE FACILITY) TO CONSTRUCT A 21,582 SQ. FT., SINGLE STORY, TYPE II-N, FULLY FIRE SPRINKLERED BUS MAINTENANCE FACILITY. THE BUILDING WILL HAVE 5,625 SQ. FT. OF OFFICE AREA WITH 15,957 SQ. FT. OF SHOP AREA WHICH INLCUDES A 2,375 SQ. FT. PARTS STORAGE MEZZANINE. OTHER WORK INCLUDES ALL RELATED SITE IMPROVEMENTS, PAVING, LANDSCAPING AND A 3000 GAL. FUEL TANK PER APPROVED PLANS AND ATTACHMENTS, CU#-47-94, PC#364-97. FIRE SPRINKLERS USED FOR AREA.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/14/2013 DONE
Print Occupancy Form  3/14/2013 DONE
Case Summary (BLD)  3/14/2013 DONE
Print Occupancy Form  2/28/2013 DONE
DetailsChristina Prado
Case Summary (BLD)  1/10/2002 DONE
INSP-Conference9/22/19989/22/19989/22/1998 PART
DetailsJoe Tawney
/ / 406 - CONF W/ MITCH MILES CONTR ON REMAINING ITEMS FOR PERM OCC
INSP-Final Inspection6/18/19986/19/19986/19/1998ACANC
DetailsJoe Tawney
06/19/98 406 - Scheduled by Hello!. Contact phone is [3717146]. CANCEL SHOULD HAVE BEEN STRUCTURAL INSPECTION
INSP-Final Inspection6/16/19986/16/19986/16/1998PPART
DetailsJoe Tawney
06/16/98 406 - Scheduled by Hello!. Contact phone is [3717146]. REINSP OK FOR TEMP OCC FOR ENTIRE FACILITY
INSP-Final Inspection6/11/19986/12/19986/12/1998AFAIL
DetailsJoe Tawney
06/12/98 406 - Scheduled by Hello!. Contact phone is [4241922]. REINSP FAIL S/F DAMPERS OK MOVE ONE DETECTOR
INSP-Final Inspection6/10/19986/11/19986/12/1998PCANC
DetailsJoe Tawney
06/11/98 406 - Scheduled by Hello!. Contact phone is [4241922]. CANCELLED
INSP-Final Inspection6/3/19986/3/19986/3/1998PCANC
DetailsJoe Tawney
06/03/98 406 - Scheduled by Hello!. Contact phone is [3717146]. CANCEL
INSP-Final Inspection6/1/19986/2/19986/3/1998APART
DetailsJoe Tawney
06/02/98 406 - Scheduled by Hello!. Contact phone is [3717146]. REINSP OK FOR TEMP OCC OF OFFICE AREA ONLY
DOC - T/O Approved6/2/19986/2/19986/2/1998 PART
DetailsJim Storey
/ / 301 - OFFICE ONLY SEPRATE OCC CARD SIGNED AND ONSITE. SHOP AREA NO
INSP-Final Inspection5/29/19986/1/19986/1/1998PFAIL
DetailsJoe Tawney
05/31/98 406 - Scheduled by Hello!. Contact phone is [3717146]. REINSP FAIL ALARM SYSTEM
Print Occupancy Form  6/1/1998
INSP-Final Inspection5/27/19985/28/19985/28/1998PFAIL
DetailsJoe Tawney
05/28/98 406 - Mitch ###-#### FINAL FAIL SPKLR MONITORING BLDG ADDRESS EXIT SIGNS EXIT DOORS
Code Occupancy Approval  5/28/1998 PASS
SITE INSPECTION SHOWED TREES AND HYDROSEEDING IN, PARKING LOT IS OK PER PLANS, FINAL SIGNED OFF.
INSP - Wall cover5/12/19985/12/19985/12/1998PPART
DetailsJim Storey
05/12/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Sprinkler Rough-in/Hydro4/27/19984/27/19984/27/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR HYDRO TEST ADD HEAD UNDER STAIRS AND ADDRESS CAN
INSP - Wall cover4/20/19984/22/19984/22/1998APART
DetailsJim Storey
04/22/98 301 - ceilling ok for tile
INSP-Sprinkler Rough-in/Hydro4/9/19984/9/19984/9/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND HYDRO TEST
INSP-Supply line flush4/9/19984/9/19984/9/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Framing/Rough-in3/24/19983/25/19983/25/1998PPART
DetailsJim Storey
03/25/98 301 - ###-#### he says you told him around 2:00 conf ok resubmtal recieved
INSP - Framing/Rough-in3/18/19983/19/19983/20/1998APASS
DetailsJim Storey
03/20/98 301 - CRAC-PRMT CANCLD BY APPLIC/CONTR REQ
INSP - Mono pour3/6/19983/6/19983/6/1998 PART
DetailsJim Storey
/ / 301 - WIP -WORK IN PROGRESS special insp. pasted pending report unable to insp call for insp.
INSP - Framing/Rough-in2/12/19982/13/19982/13/1998APASS
Details
02/13/98 338 - -BUS STATION--BRIAN ###-#### on the office interior ok to
INSP - Framing/Rough-in1/23/19981/26/19981/26/1998APASS
DetailsJim Storey
01/26/98 301 - REBAR ###-#### MITCH FRMS-OK FORMS-REBAR
INSP - Framing/Rough-in1/21/19981/22/19981/22/1998APASS
DetailsJim Storey
01/22/98 301 - OFFICE ONLY\MITCH ###-#### FRAM-OK FRAMING center office ok to hang gyp. for sound wall.
INSP - Framing/Rough-in1/20/19981/20/19981/21/1998PNR
DetailsRuss Owen
01/20/98 407 - slab covered not ready for inspection. might have special
INSP - Framing/Rough-in1/13/19981/13/19981/13/1998PPASS
DetailsJim Storey
01/13/98 301 - concrete flat work. ###-####-Mitch Miles. slab on grade ok as per plan
INSP - Framing/Rough-in12/31/19971/5/19981/5/1998APASS
DetailsJim Storey
01/05/98 301 - masonary block MASN-REBAR OK
INSP - Framing/Rough-in12/30/199712/30/199712/30/1997PPART
DetailsJim Storey
12/30/97 301 - concrete wall s/i on site pending report ì
INSP - Framing/Rough-in12/22/199712/23/199712/23/1997PPASS
DetailsJim Storey
12/23/97 301 - MASN-REBAR OK
INSP - Wall cover12/22/199712/22/199712/23/1997PCANC
DetailsRuss Owen
12/22/97 407 - CONCRETE BLOCK WALL,unable to do gave to jim.
INSP - Framing/Rough-in12/18/199712/19/199712/19/1997APASS
DetailsJim Storey
12/19/97 301 - recieved approval from arch/engineer that over height gro robertson @ morrison knudsen.
INSP - Miscellaneous12/17/199712/17/199712/18/1997PFAIL
DetailsJim Storey
12/18/97 301 - grouted w/o engineering approval to do so over 5ft
INSP - Miscellaneous12/15/199712/16/199712/16/1997AFAIL
DetailsJim Storey
12/16/97 301 - BOISE URBAN STAGES/ MASONARY BLOCK WALL CORR-CORREC-CALL FOR REINSP WHEN COMPLETED provide clean outs for grout over 4 ft. or provide engineering aproval.
(F) Reprint permit  11/24/1997
Inspection Record Card- Bld  11/21/1997
Telephone call  11/21/1997
LEFT MESSAGE ON JAKE'S VOICE MAIL - PERMIT READY
Print Occupancy Form  11/21/1997
Inspection Record Card- Bld  11/21/1997
PLANS/APPL TAKEN TO FRONT DESK  11/21/1997 PASS
Issue PAID IN FULL permit  11/21/1997
Plan assigned to (M_O)7/16/1997 11/20/1997 PASS
Routing Off Site - STRUCTURAL10/29/1997 11/19/1997 PASS
REVISED PLANS SENT OUT TO CH2MHILL VIA PDQ 11-17-97 STRUCTURAL REVIEW LETTER BY CH2MHILL DATED 11-14-97 ORIGINAL REVIEW RESPONSES REVISED ARCHITECTURAL DRAWINGS AND STRUCTURAL DRAWINGS (1 SET) METAL BUILDING DRAWINGS (1 SET) METAL BUILDING STRUCTURAL CALCULATIONS (1SET) ALL ABOVE ITEMS RETURNED 11-17-97 CORRECTIONS MAILED AND FAXED TO ARCHITECT 11-17-97. MO RESPONSE RECEIVED FROM ARCHITECT RESOLVING CORRECTIONS. 11-19-97. MO
Plan resubmittals received  11/19/1997 PASS
RESPONSE TO STRUCTURAL CORRECTIONS RECEIVED. MO
Plan resubmittals requested  11/17/1997 FAIL
CORRECTIONS FROM CH2MHILL FAXED AND MAILED TO ARCHITECT ON 11-17-97. MO
Routing - PLAN CHECK10/29/1997 10/31/1997 PASS
Plan resubmittals received  10/29/1997 PEND
PLAN RESUBMITTALS FOR ARCHITECTURAL AND STRUCTURAL RECEIVED 10-29-97.MO
90 day tracking............. 6/18/19979/16/1997
Routing - PLANNING7/14/1997 8/4/1997 PASS
PACKAGE #2 X-REF: CU-47-94. APPROVED BY RC.
Routing - FIRE7/23/1997 7/28/1997 PASS
PACKAGE #1
Plan resubmittals requested  7/23/1997 FAIL
corrections sent to architect 7-23-97. MO
Routing - PLAN CHECK7/16/1997 7/23/1997 FAIL
corrections mailed and faxed to architect. MO
Plan assigned to (RGG)6/23/1997 7/16/1997
Routing Off Site - A.C.H.D6/23/1997 7/16/1997 PASS
PACKAGE #4 CONTACTED DICK ROBERTSON AT ###-#### TO TAKE PLANS OUT TO ACHD. NO IMPACT FEES DUE PER MARKUS GREEN AT ACHD.
Routing - PUBLIC WORKS6/23/1997 7/14/1997 PASS
PACKAGE #2
Routing Off Site - STRUCTURAL6/23/1997 7/11/1997 FAIL
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL
Routing - ELECTRICAL7/3/1997 7/9/1997 PASS
PACKAGE #1
Routing - PLUMBING6/23/1997 6/30/1997 PASS
PACKAGE #1
(F) Reprint permit  6/24/1997
Plans ACCEPTED BY PLAN CHECK  6/23/1997 PASS
Received Certificate of Value  6/23/1997 PASS
Plan routing begun/NEW & ADDTN6/23/1997 6/23/1997 PASS
GAVE DICK AN H-OCCUPANCY TO FILL OUT FOR PACKAGE #1. 6-25-97 RECEIVED AN H-OCCUPANCY. PUT IN WALL FILE UNTIL I RECEIVE PACKAGE #1 BACK FROM ROUTING. KMM
Plan assigned to (MYS)6/18/1997 6/23/1997
DetailsMarlene Southard
Application received  6/18/1997