Permanent Occupancy | | 12/23/1997 | 12/23/1997 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/23/1997 | | PASS |
|
|
|
Perm. Occ. Cert. #7085 issued 12-23-97 to BMC West.
|
INSP - Final | 12/22/1997 | 12/22/1997 | 12/22/1997 | P | PASS |
Wes Worcester
|
|
|
12/22/97 342 - Hi, Parnelli! ì
|
INSP-Final Inspection | 12/22/1997 | 12/22/1997 | 12/22/1997 | P | PASS |
Rick Jackson
|
|
|
re-inspect of sprinkler head in conference room and verification of smoke evac modifications
|
INSP-Final Inspection | 10/31/1997 | 10/31/1997 | 10/31/1997 | P | PART |
Rick Jackson
|
|
|
temp c/o approved. recheck smoke evac system dampers by 11/30.
|
INSP - Final | 10/31/1997 | 10/31/1997 | 10/31/1997 | P | PASS |
Wes Worcester
|
|
|
10/31/97 342 -
|
Temporary occupancy | | | 10/31/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3494 issued 10-31-97 to BMC West for offices.
|
INSP - Final | 10/30/1997 | 10/30/1997 | 10/30/1997 | P | NR |
Wes Worcester
|
|
|
10/30/97 342 - have not rec'd smk exhaust exception
|
INSP - Conference | 10/30/1997 | 10/30/1997 | 10/30/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - talked to Bob...called Dan 3 times
|
INSP - Final | 10/30/1997 | 10/30/1997 | 10/30/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - STAIRTOWER PENETRATIONS STILL NOT ALL FIRESTOPPED.....4-5 TR LEAST 1 FOR BOB
|
INSP - Final | 10/28/1997 | 10/29/1997 | 10/29/1997 | P | FAIL |
Wes Worcester
|
|
|
10/28/97 342 -
|
INSP - Conference | 10/29/1997 | 10/29/1997 | 10/29/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - met w/architect and vp of owner, need smoke evach system agr braced wall panels, fire dept approval as previously discussed
|
INSP-Final Inspection | 10/28/1997 | 10/29/1997 | 10/29/1997 | A | FAIL |
Rick Jackson
|
|
|
approved doors exiting BMC West to lobby area. smoke evacuation system not tested per building permit requirement.
|
INSP - Final | 10/23/1997 | 10/24/1997 | 10/24/1997 | P | NR |
Wes Worcester
|
|
|
10/24/97 342 -
|
INSP-Sprinkler Rough-in/Hydro | 10/23/1997 | 10/24/1997 | 10/24/1997 | A | FAIL |
Rick Jackson
|
|
|
alarm system not ready. c/n issued.
|
90 day tracking............. | | 6/26/1997 | 9/24/1997 | | PEND |
|
|
|
|
INSP - Framing/Rough-in | 9/15/1997 | 9/16/1997 | 9/16/1997 | P | PART |
Wes Worcester
|
|
|
09/16/97 342 - detail elevator shaft repair as necessary if required for
|
INSP - Conference | 9/10/1997 | 9/10/1997 | 9/10/1997 | P | CANC |
Dave Lightfoot
|
|
|
09/10/97 337 - 1:30 pm w/arch, owner, drywall i have a meeting at the hotel at this time
|
INSP - Conference | 9/9/1997 | 9/10/1997 | 9/10/1997 | P | PART |
Wes Worcester
|
|
|
09/09/97 342 - AS PER WES 1:30
|
INSP - Conference | 9/10/1997 | 9/10/1997 | 9/10/1997 | P | PASS |
Bob Archibald
|
|
|
Pre-con and clairification meeting w/ Wes, architect and maintence manager.
|
INSP - Framing/Rough-in | 9/8/1997 | 9/9/1997 | 9/9/1997 | P | NR |
Wes Worcester
|
|
|
09/09/97 342 - 3pm
|
INSP - Conference | 9/9/1997 | 9/9/1997 | 9/9/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - schedule w/fire, mech, arch, owner, drywall/grid installer a
|
Routing - PLAN CHECK | 9/5/1997 | | 9/5/1997 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/1997 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/5/1997 | | |
|
|
|
Received information on smoke exhayst system from Ken Tewksbury, Mech. Eng., designing smoke exhaust system. Reviewed results of field test with fire dept. Ther are still questions to be answered and smoke exhaust plans to be presented for review and approval showing the locations of system components & tie in with existing components and the final field test for final C.O. for the tenants.
|
Issue PAID IN FULL permit | | | 9/5/1997 | | |
|
|
|
|
Print Occupancy Form | | | 9/5/1997 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/5/1997 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 9/5/1997 | | |
|
|
|
|
Plan resubmittals requested | | | 8/23/1997 | | PEND |
|
|
|
Faxed copy to John Maulin and mailed copy.
|
Routing - PLAN CHECK | 8/15/1997 | | 8/23/1997 | | |
|
|
|
Finished preliminary review - copy of corrections needed sent to John Maulin. Outstanding questions concerning the smoke exhaust system that seems to be handled separately form all other TI. This raises a question on the compatability of the two designs when the smoke exhaust is to be done thus causing more delays.
|
Telephone call | | | 8/22/1997 | | |
|
|
|
Called Glenn Boardman of CSHQA to set up an appointment with those involved in MK Smoke Exhaust system design. Two copies of the 1981 Honeywell electrical/mechanical drawings had been presented to me in response to my phone call to Mr. Maulin on the 18th of August. I couldn't see that the plans addressed the original smoke exhaust system system that has been verbally refered to by designers involved. I asked Glenn Boardman to review the plans and come prepared to assist me through them on Monday the 25.
|
Plan Reviewer's activity | | | 8/20/1997 | | |
|
|
|
CSHQA submitted three TI plans for the East half area to get Occupancy. There is still the questions on the smoke exhaust system design & testing details. I am meeting with John Maulin & group on Monday at 10 am to revisit the issues.
|
Plan Reviewer's activity | | | 8/18/1997 | | |
|
|
|
Letter sent to John Maulin concerning the schedule sent for acceptance for proposed time frame for design, submittal for approval, installation and testing of smoke exhaust system. A phone conversation with John Maulin revealed he did not have a copy of the letter of agreement signed by Mr. Houston with agreed to items to be answered prior to occupancy certificates for proposed tenants of the east half remodel. The letter was signed in order to have a permit issued for the East half TI and to clarify conditions still in question. I have not received any new information in regard to the letter of agreement but have been asked to approve this time frame plan and allow occupancy for tenant in East half before answeres are received. This process seems to be working for the tenat/owners but is not resolving concerns of fire & building dept, plan reviewers code considerations.
|
Routing - PLAN CHECK | 8/7/1997 | | 8/15/1997 | | |
|
|
|
Started to review plans
|
Plan Reviewer's activity | | | 8/8/1997 | | |
|
|
|
LETTER WRITTEN BY T. HOGLAND ON FILE DATED 7/31/97 ALLOWING FRAMING TO BEGIN PRIOR TO PERMIT ISSUANCE. NO INSPECTIONS CAN BE PERFORMED PRIOR TO PERMIT ISSUANCE.
|
Routing - FIRE | 8/4/1997 | | 8/6/1997 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 7/1/1997 | | 8/1/1997 | | PEND |
Dan Stuart
|
|
|
Plans picked for quick review in order to submit to Fire Dept. for review while on vacation.
|
Routing - PLAN CHECK | 7/8/1997 | | 8/1/1997 | | PEND |
|
|
|
Plans processed to allow fire dept. review while I am on vacation.
|
Routing - PLAN CHECK | 8/1/1997 | | 8/1/1997 | | PEND |
|
|
|
Routing to fire Dept. for review.
|
Routing - PUBLIC WORKS | 7/1/1997 | | 7/8/1997 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 7/1/1997 | | |
|
|
|
Route to PUBLIC WORKS then back to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT.
|
Plan assigned to (MYS) | 6/26/1997 | | 7/1/1997 | | |
Marlene Southard
|
|
|
|
Application received | | | 6/26/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/26/1997 | | |
|
|
|
|