INSP - Final | 3/16/1998 | 3/17/1998 | 3/17/1998 | A | PASS |
Jim Storey
|
|
|
03/17/98 301 - woody ###-#### 45 min road trip for already approved insp.
|
INSP - Final | 3/16/1998 | 3/17/1998 | 3/16/1998 | A | PASS |
Jim Sly
|
|
|
03/16/98 316 - Perm Occ. OK
|
Permanent Occupancy | | 3/16/1998 | 3/16/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/16/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7170 issued 3-16-98 to Econo Lube 'N Tune.
|
INSP-Final Inspection | 3/13/1998 | 3/13/1998 | 3/13/1998 | P | PASS |
Joe Tawney
|
|
|
03/13/98 406 - woody ###-#### REINSP OK FOR PERM OCC
|
INSP - Final | 3/12/1998 | 3/13/1998 | 3/13/1998 | A | PART |
Jim Sly
|
|
|
03/12/98 316 - Temp Occ...C/N..Need appr letter from Engineer..Minor des
|
INSP-Final Inspection | 3/12/1998 | 3/12/1998 | 3/12/1998 | P | FAIL |
Joe Tawney
|
|
|
03/12/98 406 - ECONO LUBE--WOODY ###-#### REINSP FAIL INSTALATION OF TANKS WITH VENTS INSTALLED
|
INSP-Final Inspection | 3/11/1998 | 3/11/1998 | 3/11/1998 | P | NR |
Jim Sly
|
|
|
03/11/98 316 - NR..............
|
Plan resubmittals received | | | 3/10/1998 | | |
|
|
|
RECEIVED SPECIAL INSPECTION REPORTS FROM MTI. NO PLANS SUBMITTED. KMM ROUTED TO JIM SLY
|
INSP - Final | 3/6/1998 | 3/9/1998 | 3/9/1998 | P | FAIL |
Jim Sly
|
|
|
03/09/98 316 - ECONO LUBE-C/N..Handrails, letter appr spec insp, Need al
|
INSP-Final Inspection | 3/6/1998 | 3/9/1998 | 3/9/1998 | A | PART |
Joe Tawney
|
|
|
03/09/98 406 - ECONO LUBE--WOODY ###-#### FINAL OK FOR TEMP OCC BLDG ADDRESS REVIEW OF ART 79 80 & 81 FOR LUBE TAN
|
Code Occupancy Approval | | | 3/9/1998 | | PASS |
|
|
|
Complies with approved plans on file DRH97-0138/cam
|
INSP - Framing/Rough-in | 2/11/1998 | 2/12/1998 | 2/12/1998 | A | PASS |
Tom Arcoraci
|
|
|
02/12/98 408 - econo lube ###-#### needs ok for eng of record to change roof from a class a to as built
|
INSP - Conference | 1/8/1998 | 1/8/1998 | 1/8/1998 | P | PASS |
Jim Sly
|
|
|
01/08/98 316 - New Job super...Talked about inspection requirements.
|
INSP - Foundation | 12/17/1997 | 12/18/1997 | 12/18/1997 | A | PART |
Jim Sly
|
|
|
12/18/97 316 - OK pending special insp approval....
|
INSP - Carpentry | 12/12/1997 | 12/15/1997 | 12/15/1997 | A | PART |
Jim Sly
|
|
|
12/12/97 316 - Poured North wall and walls around sevice bays OK pending
|
INSP - Footings | 12/10/1997 | 12/10/1997 | 12/10/1997 | P | PART |
Tom Arcoraci
|
|
|
12/10/97 408 -
|
INSP - Foundation | 12/5/1997 | 12/8/1997 | 12/8/1997 | A | PART |
Jim Sly
|
|
|
12/05/97 316 - North found wall ..OK pending special insp approval...
|
INSP - Foundation | 12/3/1997 | 12/3/1997 | 12/3/1997 | P | PART |
Tom Arcoraci
|
|
|
REBAR POURING AT 2:30 spec inspec on site
|
INSP - Footings | 12/1/1997 | 12/2/1997 | 12/2/1997 | P | PART |
Jim Sly
|
|
|
12/02/97 316 - ECONO LUBE OK Pending special inspection approval.....
|
INSP - Foundation | 11/25/1997 | 11/26/1997 | 11/26/1997 | P | PART |
Jim Sly
|
|
|
11/26/97 316 - ECONO LUBE--OK pending special inspector approval..found
|
INSP - Footings | 11/20/1997 | 11/21/1997 | 11/21/1997 | P | PART |
Jim Sly
|
|
|
11/21/97 316 - rebar For foot 1st pour..OK pending special insp. approva
|
(F) Reprint permit | | | 11/13/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/12/1997 | | |
|
|
|
|
(F) Reprint permit | | | 11/12/1997 | | |
|
|
|
|
Plan assigned to (M_P) | 8/13/1997 | | 10/7/1997 | | PASS |
Mike Phillips
|
|
|
10/07/97 13:45:04 DAR - this action updated by action script from <<>> in Case No. BLD97-1870
|
Print Pending Permit.LaserJet4 | | | 10/7/1997 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 10/7/1997 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/1997 | | |
|
|
|
|
Telephone call | | | 10/7/1997 | | |
|
|
|
CALLED LEFT MESSAGE ASK TO HAVE SOMEONE CALL ME BACK WITH PERSON I NEED TO TALK TO ABOUT TO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/1997 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/7/1997 | | PEND |
|
|
|
|
Routing - MECHANICAL | | | 10/3/1997 | | |
|
|
|
PACKAGE #1 FIeld review.
|
Plan Reviewer's activity | | | 10/3/1997 | | PEND |
|
|
|
Waiting for Planning approval and Contractor. Package 3 trashed.
|
Routing - PLANNING | 10/2/1997 | | 10/3/1997 | | PASS |
|
|
|
X-REF: CUP97-0032 & DRH97-0138. APPROVED BY RLB & MGS.
|
90 day tracking............. | | 7/1/1997 | 9/29/1997 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/8/1997 | | 9/19/1997 | | PASS |
|
|
|
CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL FOR RESUB REVIEW. RESUB REVIEW CAME BACK 9-18-97 WITH STRUCTURAL REVIEW LETTER AND CALCULATIONS (1 SET ) NO PLANS RETURNED AT THIS TIME. Plan review complete. no futher structural review required. MJP package 3 trashed.
|
Plan resubmittals received | | | 9/11/1997 | | |
|
|
|
received 3rd and 4th set of structural plans and calculations
|
Plan resubmittals requested | | | 9/11/1997 | | FAIL |
|
|
|
Sent second correction letter does not include structural comment. Waiting for structural comments from out side engineer.
|
Plan Reviewer's activity | | | 9/11/1997 | | FAIL |
|
|
|
Sent second set of plan review corrections. This plan review does not include out side structural comments.
|
Plan resubmittals received | | | 9/5/1997 | | |
|
|
|
Sent set out for follow up structural review, and requested two additional sets of structural plans.
|
Routing - FIRE | 8/24/1997 | | 9/3/1997 | | PASS |
|
|
|
PACKAGE #1
|
Print Pending Permit.LaserJet4 | | | 8/21/1997 | | FAIL |
|
|
|
REQUESTING RESUBMITTALS.
|
Plan resubmittals requested | | | 8/21/1997 | | FAIL |
|
|
|
REQUESTING RESUBMITTALS.
|
Plan Reviewer's activity | | | 8/21/1997 | | FAIL |
|
|
|
SENT CORRECTION REPORT.
|
Plan assigned to (RGG) | 7/3/1997 | | 8/13/1997 | | PASS |
|
|
|
|
Routing - PLANNING | 8/5/1997 | | 8/6/1997 | | FAIL |
|
|
|
PACKAGE #2 X-REF: CUP97-0032, DRH97-0138. 10 DAY APPEAL PERIOD HAS NOT LAPSED & APPLICANT NEEDS TO PROVIDE A REVISED LANDSCAPE PLAN WHICH COMPLIES WITH DESIGN REVIEW CONDITIONS. REVIEWED BY MGS.
|
Routing - PUBLIC WORKS | 7/15/1997 | | 8/4/1997 | | PASS |
|
|
|
PACKAGE #2 WAITING FOR DRAINAGE CALCS. TO COME IN BEFORE ROUTING TO P.W. 7-15-97 RECEIVED DRAINAGE CALCS. AM READY TO ROUTE TO P.W.
|
Routing Off Site - STRUCTURAL | 7/7/1997 | | 7/30/1997 | | FAIL |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL PACKAGE RETURNED CORRECTIONS REQUIRED. SUBMITTALS MUST GO TO OUTSIDE ENGINEERING FIRM TO BE REVIEWED.
|
Routing Off Site - A.C.H.D | 7/7/1997 | | 7/29/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED PAT MCKEEGAN AT ###-#### TO TAKE PLANS OUT TO ACHD IMPACT CERT. #97-1634
|
Routing - PLAN CHECK | 7/10/1997 | | 7/15/1997 | | |
|
|
|
PACKAGE #2
|
Routing - PLUMBING | 7/9/1997 | | 7/15/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - ELECTRICAL | 7/7/1997 | | 7/9/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 7/7/1997 | | 7/8/1997 | | FAIL |
|
|
|
PACKAGE #2 X-REF: CU-32-97 & DR-39-97. NEED DR APPROVAL. REVIEWED BY RLB & TKW.
|
Plans ACCEPTED BY PLAN CHECK | | | 7/7/1997 | | PASS |
|
|
|
SEE ACTION 007 HOLD
|
Plan routing begun/NEW & ADDTN | | | 7/7/1997 | | PASS |
|
|
|
SEE ACTION 007 HOLD
|
Plans ACCEPTED BY PLAN CHECK | | | 7/3/1997 | | HOLD |
|
|
|
PACKAGE #1 REQUIRES SHEETS A0,A2,A4,A5,A6,A9,A10,SP2,PP1,PP2 AND PP3 TO BE STAMPED AND SIGNED PACKAGE #2 REQUIRES SHEETS A0,A2,A4,PP1,PP2,PP3 TO BE STAMPED AND SIGNED. DRAINAGE CALCS. PACKAGE #3 REQUIRES SHEETS A0,A2,A4,A5,A6,A9,A10, ANDSP2 TO BE STAMPED AND SIGNED. PACKAGE #4 REQUIRES SHEETS A0, AND A2 TO BE STAMPED AND SIGNED. CONTACTED PAT MCKEEGAN OF THESE NEEDS. 7-7-97 CAME IN AND STAMPED AND SIGNED ALL SHEETS. STILL WAITING FOR DRAINAGE CALCS. WHICH HE STATES WILL BE COMING AT A LATER DATE. I WILL SEND PACKAGE #2 TO P&Z FIRST 7-15-97 RECEIVED DRAINAGE CALCS. READY TO ROUTE TO P.W.
|
Plan routing begun/NEW & ADDTN | | | 7/3/1997 | | HOLD |
|
|
|
SEE ACTION 007 HOLD
|
Plan assigned to (MYS) | 7/1/1997 | | 7/3/1997 | | PEND |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 7/1/1997 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/1/1997 | | |
|
|
|
|
Application received | | | 7/1/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 10/5/1997 | | | | |
|
|
|
PACKAGE #2
|