Code Occupancy Approval | | | 2/4/1999 | | PASS |
|
|
|
Complies with Modifications to DR/Finaled
|
Fee Review-notes | 7/14/1998 | | 9/10/1998 | | DONE |
|
|
|
|
FEE REVIEW-NOTES | | | 5/19/1998 | | FEES |
|
|
|
additional fees-ele-1800.00 plumb-3557.00 mech.-42935.00 total value of 48292.00
|
FEE REVIEW-NOTES | | | 4/27/1998 | | FEES |
|
|
|
FEES DUE WITH ADDITIONAL VALUE WORK OUT ABOUT THE SAME AS THE OVERPAYMENT ON PERMIT. DIDN'T FEE DUE LH
|
INSP - Final | 3/29/1998 | 3/29/1998 | 3/29/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK FOR TEMP ON SHELL
|
Code Occupancy Approval | | | 3/17/1998 | | TEMP |
|
|
|
REQUEST FOR SIGNOFF BY JOHN ANDERSON, ###-####, ONLY ITEMS NOT IN IS SPRINKLER HEADS AND 1 TREE THAT IS NOT GOING TO BE PLANTED DUE TO CHANGE IN ROADS. Inspection made 3/17/98....revision made to approved plan because of addition of trash compactor. Planter added at southeast corner of proj. because the area at the trash enclosure will be reduced for addition of trash compactor- called Tom South to submit sketch of change. Will only have a small amt. of sod and one tree left to complete- will sign temporary ..bonding not required. Revisions still need to be submitted (4/28/98)- Proj. not complete
|
INSP-Sprinkler Rough-in/Hydro | 3/16/1998 | 3/16/1998 | 3/16/1998 | P | PASS |
Joe Tawney
|
|
|
03/16/98 406 - MIKE WILL CALL TO SCHEDULE A TIME--###-#### OK ON HYDRO TEST
|
SUPER- Supervisor's review | 3/13/1998 | 3/13/1998 | 3/13/1998 | | DONE |
|
|
|
PERRY MET WITH BON MARCHE PARENT COMPANY MANAGER. REVIEW OF SMOKE CONTROL SYSTEM NECESSARY TO OPERATE THE ADDITIONAL SQUARE FOOTAGE ALLOWED AS AN ALTERNATE TO CODE LIMITATION AND TYPE OF CONSTUCTION. THE REQUIREMENT IS NECESSARY TO HAVE SYSTEM COMPLETLY OPERATIONAL PRIOR TO OCCUPYING THE SPACE. THE BON HAD SCHEDULED AN OPENING THE SAME DAY AS THE UNIT WAS TO ARRIVE AND WOULD NOT HAVE BEEN INSTALLLED. THIS INFORMATION WAS GIVEN TO THE OWNERS REP AND NOT RELAYED TO THE BON MANAGER. ALL PARTIES ARE IN AGREEMENT THAT WORK IS TO BE COMPLETED PRIOR TO OCCUPYING THE STUCTURE. PERRY USED THE PROFIT TEAM HANDOUT AS A DENONSTRATION OF OUR WORKING AS A TEAM TO GET A PROJECT TO COMPLETION. THE FACT THAT THEY HAVE TO GET THEIR WORK DONE AS PART OF THEIR RESPONSIBLILITY TO THE PROJECT AND THEY AGREED.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/1998 | 2/27/1998 | 2/27/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR ROUGH IN
|
INSP - Miscellaneous | 12/1/1997 | 12/1/1997 | 12/1/1997 | P | PASS |
|
|
|
12/01/97 338 - madeok with the sp insp approval
|
INSP - Miscellaneous | 11/24/1997 | 11/25/1997 | 11/25/1997 | A | PASS |
|
|
|
11/25/97 338 - the Bon\mansonary made ok with sp insp approval
|
INSP - Miscellaneous | 11/17/1997 | 11/18/1997 | 11/18/1997 | A | PART |
|
|
|
11/18/97 333 - ok pending special insp report
|
INSP - Miscellaneous | 11/14/1997 | 11/14/1997 | 11/14/1997 | P | PART |
|
|
|
MADE OK WITH SP INSP APPROVAL
|
INSP - Miscellaneous | 11/12/1997 | 11/13/1997 | 11/13/1997 | A | PASS |
|
|
|
MAD EOK WITH TH SP INSP APROVAL
|
INSP - Miscellaneous | 11/6/1997 | 11/7/1997 | 11/7/1997 | A | PART |
Tom Arcoraci
|
|
|
SPECIAL INSPECTOR ON SITE MASONARY\\BON
|
INSP - Miscellaneous | 11/4/1997 | 11/4/1997 | 11/4/1997 | P | PART |
|
|
|
11/04/97 333 - ok pending special insp report
|
(F) Reprint permit | | | 10/29/1997 | | |
|
|
|
|
INSP - Miscellaneous | 10/28/1997 | 10/28/1997 | 10/28/1997 | P | PASS |
|
|
|
made ok with sp insp approval
|
INSP - Miscellaneous | 10/27/1997 | 10/27/1997 | 10/27/1997 | P | PASS |
|
|
|
MADE OK WITH THE SP INSP APPROVAL
|
INSP - Miscellaneous | 10/23/1997 | 10/24/1997 | 10/24/1997 | P | PASS |
|
|
|
MASONARY AT THE BON mad eok with sp insp approval
|
INSP - Miscellaneous | 10/22/1997 | 10/23/1997 | 10/23/1997 | A | PASS |
|
|
|
MASONART/ THE BON made ok with the sp insp approval
|
INSP - Miscellaneous | 10/21/1997 | 10/21/1997 | 10/21/1997 | P | PASS |
|
|
|
made ok with sp insp approval
|
INSP - Framing/Rough-in | 10/20/1997 | 10/20/1997 | 10/20/1997 | P | PASS |
|
|
|
will pour at 1:00 MADE OK WITH SP INSP APPROVAL
|
Receive PAYMENT IN FULL PRINT | | | 10/20/1997 | | |
|
|
|
|
(F) Reprint permit | | | 10/20/1997 | | |
|
|
|
|
(F) Reprint permit | | | 10/20/1997 | | |
|
|
|
|
Plan Reviewer's activity | | | 10/20/1997 | | PASS |
|
|
|
ADD INTERIOR SLAB TO SHELL AND CORE PERMIT.
|
INSP - Miscellaneous | 10/17/1997 | 10/17/1997 | 10/17/1997 | P | PASS |
|
|
|
masonary made ok with the sp insp approval
|
INSP - Miscellaneous | 10/14/1997 | 10/14/1997 | 10/14/1997 | P | PASS |
|
|
|
masonary made ok with sp insp approval
|
INSP - Miscellaneous | 10/13/1997 | 10/13/1997 | 10/13/1997 | P | PASS |
|
|
|
MASONARY made ok with sp insp ok
|
INSP - Miscellaneous | 10/10/1997 | 10/10/1997 | 10/10/1997 | P | PASS |
|
|
|
10/10/97 338 - MASONARY made ok with sp insp approval
|
INSP - Miscellaneous | 10/8/1997 | 10/8/1997 | 10/8/1997 | P | PASS |
|
|
|
10/08/97 338 - MASONARY INSPECTION made ok with luthers ok
|
INSP - Footings | 10/7/1997 | 10/7/1997 | 10/7/1997 | P | PASS |
|
|
|
10/07/97 333 - last 12 feet south wall
|
INSP - Footings | 10/6/1997 | 10/6/1997 | 10/6/1997 | P | PASS |
|
|
|
10/06/97 338 - made ok with sp insp approval97 at 09:59:15.
|
INSP - Footings | 10/3/1997 | 10/3/1997 | 10/3/1997 | P | PASS |
|
|
|
10/03/97 338 - made ok with the sp insp approvalt 09:51:52.
|
INSP - Footings | 10/1/1997 | 10/2/1997 | 10/2/1997 | A | PASS |
|
|
|
10/02/97 338 - made ok with sp insp blessing MASN-REBAR OK
|
90 day tracking............. | | 7/2/1997 | 9/30/1997 | | |
|
|
|
|
INSP-Conference | 9/26/1997 | 9/25/1997 | 9/25/1997 | P | PART |
Rick Jackson
|
|
|
conference about temp walkway through construction site
|
INSP - Foundation | 9/24/1997 | 9/25/1997 | 9/25/1997 | P | PASS |
|
|
|
09/26/97 338 - made ok with the sp insp approval for prisms and r-bar
|
INSP - Foundation | 9/23/1997 | 9/24/1997 | 9/24/1997 | P | PASS |
|
|
|
09/24/97 338 - special inspection made ok rebar placed MASN-REBAR OK
|
INSP - Footings | 9/22/1997 | 9/23/1997 | 9/23/1997 | P | PASS |
|
|
|
09/23/97 338 - MADE OK WITH THE SP INSPECTION IS SIIGNED OFF
|
INSP - Footings | 9/19/1997 | 9/22/1997 | 9/22/1997 | P | PASS |
|
|
|
09/22/97 338 - Scheduled by Hello! on 09/19/97 at 12:04:56. made ok with
|
INSP - Conference | 9/22/1997 | 9/22/1997 | 9/22/1997 | | PASS |
|
|
|
/ / 338 - on the exiting and safetty of the public through the const a
|
INSP - Conference | 9/22/1997 | 9/22/1997 | 9/22/1997 | | PASS |
|
|
|
/ / 338 - on the exiting and safetty of the public through the const a
|
INSP - Footings | 9/17/1997 | 9/18/1997 | 9/18/1997 | P | PASS |
|
|
|
09/18/97 338 - made ok with the special inspectors approval
|
INSP - Footings | 9/17/1997 | 9/17/1997 | 9/17/1997 | | PART |
|
|
|
/ / 338 - c/n issued ubc 3306 must maintain exit ways through the cons
|
INSP - Footings | 9/16/1997 | 9/17/1997 | 9/17/1997 | P | PASS |
|
|
|
09/17/97 338 - bon marche/100 ' with sp insp approval
|
Plan assigned to (M_P) | 7/25/1997 | | 8/29/1997 | | PASS |
Mike Phillips
|
|
|
08/29/97 08:40:22 DAR - this action updated by action script from <<>> in Case No. BLD97-1876
|
Print Pending Permit.LaserJet4 | | | 8/29/1997 | | PASS |
|
|
|
|
Telephone call | | | 8/29/1997 | | |
|
|
|
PERMIT READY, FEE DUE
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/1997 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 8/29/1997 | | |
|
|
|
|
Print Occupancy Form | | | 8/29/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/1997 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/28/1997 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/28/1997 | | PASS |
|
|
|
|
Routing - FIRE | 8/28/1997 | | 8/28/1997 | | PASS |
|
|
|
Received information from Floyd and project is ready to issue.
|
Plan Reviewer's activity | | | 8/22/1997 | | PEND |
|
|
|
Waiting for Fire Department approval.
|
Routing - FIRE | 8/5/1997 | | 8/18/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Plan Reviewer's activity | | | 8/5/1997 | | FAIL |
|
|
|
SENT CORRECTION LETTER ASKING FOR CONFRIMATION OF EXISTING EXITS. NEW ADDITION HAS CHANGE EXISTING EXIT REAUIREMENTS.
|
Print Pending Permit.LaserJet4 | | | 8/5/1997 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/7/1997 | | 8/1/1997 | | |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL
|
Routing - ELECTRICAL | 7/14/1997 | | 7/18/1997 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW FIELD VERIFY
|
Routing - MECHANICAL | 7/18/1997 | | 7/18/1997 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW FILED VERIFY
|
Routing Off Site - A.C.H.D | 7/8/1997 | | 7/17/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED SCOTT HENSON AT ###-#### TO TAKE PLANS OUT TO ACHD
|
Routing - PLANNING | 7/11/1997 | | 7/16/1997 | | PASS |
|
|
|
PACKAGE #2 Approved by: TKW
|
Routing - PLUMBING | 7/8/1997 | | 7/15/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 7/8/1997 | | 7/11/1997 | | PASS |
|
|
|
PACKAGE #2
|
Plan routing begun/NEW & ADDTN | | | 7/7/1997 | | HOLD |
|
|
|
SEE ACTION 007 HOLD
|
Received Certificate of Value | | | 7/7/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/7/1997 | | HOLD |
|
|
|
PACKAGES #1,2, & 4 REQUIRE ADDITIONAL SETS. CONTACTED SCOTT HENSON AT ###-#### TO LET HIM KNOW OF THIS NEED.
|
Plan assigned to (MYS) | 7/2/1997 | | 7/3/1997 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/2/1997 | | |
|
|
|
|
Application received | | | 7/2/1997 | | |
|
|
|
|
INSP - Miscellaneous | 10/16/1997 | 10/16/1997 | 1/16/1997 | P | PASS |
|
|
|
MADE OK WITH THE SP INSP APPROVAL
|
Plan assigned to (RGG) | 7/3/1997 | | 7/29/1978 | | |
|
|
|
|
INSP - Foundation | 9/26/1997 | 9/29/1997 | 9/29/1907 | P | CANC |
|
|
|
Scheduled by Hello! on 09/26/97 at 16:43:05.
|