Permit Information
Permit NumberBLD97-02048
StatusFinaled
Name RESIDENTIAL CONDO UNIT #1402
Site Address 245 S CAPITOL BLVD Unit: 1402
Project NameGROVE HOTEL
Customer Number 
ePlanReviewNo
Description
(CONDO UNIT 1402) To finish a 1,917 square foot single level residential condominium unit on the 14th floor. Work is to include interior nonbearing walls, guardrails, 2 bathrooms, gas fireplace, 2-hr shafts, an exit door and garbage door (30" x 30") into a 1-hr corridor, and gypsum board ceilings all per approved drawings and plan check conditions on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-441-97 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final7/16/19987/16/19987/16/1998APASS
Details
07/16/98 333 - FNL -OK FINAL
Letter of compliance  7/15/1998 PASS
Letter of Compliance #15781 issued 7-15-98 to Unit #1402.
Print Occupancy Form  7/15/1998
Fee Review-notes7/14/1998 7/14/1998
(F) Reprint permit  6/1/1998
INSP - Final5/8/19985/11/19985/11/1998PFAIL
Details
05/11/98 333 - corridors not complete
INSP-Final Inspection5/11/19985/11/19985/11/1998PPASS
DetailsRick Jackson
detectors tested and are wired together for signalling local only.
INSP - Wall cover3/25/19983/25/19983/25/1998 PASS
Details
/ / 333 - screws ok
INSP - Framing/Rough-in3/9/19983/9/19983/9/1998APASS
Details
03/09/98 333 - approved resub on shafts
INSP - Framing/Rough-in3/2/19983/2/19983/2/1998PPART
Details
03/02/98 333 - resub on shaftd
INSP - Framing/Rough-in2/12/19982/12/19982/12/1998PPASS
Details
02/12/98 333 - corridor ok
INSP - Framing/Rough-in2/2/19982/2/19982/2/1998APASS
Details
02/02/98 333 - talked about shafts
INSP - Framing/Rough-in1/29/19981/29/19981/29/1998PPASS
Details
01/29/98 333 - 14 th frame ok
INSP - Framing/Rough-in1/28/19981/28/19981/28/1998 FAIL
Details
/ / 333 - cn not made
INSP - Framing/Rough-in1/27/19981/27/19981/27/1998APART
Details
01/27/98 333 - part corrected
INSP - Framing/Rough-in1/26/19981/26/19981/26/1998AFAIL
Details
01/26/98 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
FEE REVIEW-NOTES  11/6/1997 FEES
PL CHECK BASED ON WRONG VALUE REFUND FEE FROM 7/18/97 AND RECHARGE ON RIGHT VALUE
Issue PAID IN FULL permit  11/3/1997
PLANS/APPL TAKEN TO FRONT DESK  10/30/1997 PASS
Inspection Record Card- Bld  10/30/1997
Print Occupancy Form  10/30/1997
Plan assigned to (CJW)7/24/1997 10/29/1997 PASS
DetailsCarl Westfall
10/29/97 15:51:20 CJW - this action updated by action script from <<>> in Case No. BLD97-2048
Print permit w/o conditions  10/28/1997
Plan Reviewer's activity  10/28/1997 PASS
Drawings approved, with conditions, after resubmittal review.
testing condition printout  10/28/1997
90 day tracking............. 7/18/199710/16/1997
Plan resubmittals received  10/14/1997
Routing - FIRE9/19/1997 9/30/1997 PASS
Plan Reviewer's activity  9/12/1997
UBC plan check started Sept. 12, 1997 and finished Sept, 15, 1997. One item requires a response from the Architect. See conditions list.
Routing Off Site - A.C.H.D7/26/1997 7/31/1997 PASS
Routing - PUBLIC WORKS7/24/1997 7/25/1997 PASS
Plan routing begun/TENANTS  7/24/1997
Route to ADA COUNTY HIGHWAY DISTRICT, PUBLIC WORKS then back to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT.
Plan assigned to (MYS)7/18/1997 7/24/1997
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  7/18/1997
Application received  7/18/1997