Permit Information
Permit NumberBLD97-02076
StatusExpired
Name SKIP JONES
Site Address 299 N MILWAUKEE ST
Project NameWESTPARK RETAIL
Customer Number 
ePlanReviewNo
Description
WESTPARK RETAIL CENTER * TO CONSTRUCT A 3909 SQ. FT., SINGLE STORY, TYPE VN, FULLY FIRE SRPINKLERED SHELL AND CORE RETAIL BUILDING. OTHER WORK INCLUDES A TWO HOUR AREA SEPARATION WALL AND CANOPY PER APPROVED PLANS AND ATTACHMENTS, DR#97-0032, PC#466-97. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE PERMITS ARE REQUIRED FOR THE TENANT IMPROVEMENT. FIRE SPRINKLERS USED FOR AREA.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Receive PAYMENT IN FULL  11/23/1998
Fee Review-notes7/21/1998 9/10/1998 FEES
CHANGE STATUS TO (F)  6/22/1998 FEES
additional value of 6005.00 from subs..
Code Occupancy Approval  4/28/1998 PASS
Complies with DRH-97-0032/Final Occupancy Approved.
INSP - Final4/3/19984/3/19984/3/1998 PASS
Details
/ / 338 - made ok l/c issued # 014261
INSP-Final Inspection4/3/19984/3/19984/3/1998 PASS
REINSP OK FOR CERT OF COMPLETION
INSP - Letter of compliance4/3/19984/3/19984/3/1998 PASS
Details
/ / 338 - # 014261
INSP - Letter of compliance4/3/19984/3/19984/3/1998 PASS
Details
/ / 338 - # 014261
INSP-Final Inspection3/31/19984/1/19984/1/1998PFAIL
DetailsJoe Tawney
04/01/98 406 - as per 406 1:00-tracy ###-#### FINAL SHELL AND CORE FAIL DUCT DETECTORS BARRICADES FOR GAS METERS
Print Occupancy Form  3/31/1998
Code Occupancy Approval  3/31/1998 PEND
Final Occupancy requested by Jack House ###-####
Print Occupancy Form  3/31/1998
INSP-Final Inspection3/27/19983/30/19983/30/1998APASS
DetailsJoe Tawney
03/30/98 406 - at 9:00as per 406-tracy ###-#### OK ON SPKLR ROUGH IN & HYDRO TEST WINDOW SPKLR INSTAL OK
INSP - Framing/Rough-in2/23/19982/24/19982/24/1998ACANC
Details
02/24/98 333 - canc by perry CONFERENCE WITH JACK AT ###-####--HE WILL C TIME.
INSP-Supply line flush2/17/19982/17/19982/17/1998 PASS
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
CHANGE STATUS TO (I)  2/17/1998
INSP - Framing/Rough-in2/9/19982/9/19982/9/1998PPART
Details
02/09/98 338 - jack ###-#### cell conference conference only on the rati and the extension of the 2-hour wall
INSP - Framing/Rough-in2/9/19982/9/19982/9/1998 PART
Details
/ / 333 - pre frame
INSP - Framing/Rough-in1/30/19981/30/19981/31/1998PPART
Details
01/30/98 338 - ###-#### jack vrbl c/n on the roof deck strapping
Inspection Record Card- Bld  12/2/1997
(F) Reprint permit  11/26/1997
Issue PAID IN FULL permit  11/25/1997
PLANS/APPL TAKEN TO FRONT DESK  11/21/1997 PASS
Telephone call  11/21/1997
LEFT MESSAGE FOR SKIP JONES - PERMIT READY
Print Occupancy Form  11/21/1997
Routing - PLAN CHECK11/18/1997 11/19/1997 PASS
Plan assigned to (M_O)8/13/1997 11/19/1997 PASS
Plan resubmittals received  11/18/1997 PASS
90 day tracking............. 7/18/199710/16/1997
Plan Reviewer's activity  9/4/1997 FAIL
Sent letter to Crickett of BRS regarding problem with area wall on resubmittal on 9-4-97. MO
Routing - FIRE8/18/1997 9/3/1997 PASS
PACKAGE #1
Routing Off Site - A.C.H.D7/23/1997 8/29/1997 PEND
PACKAGE #4 CONTACTED SKIP JONES AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES DUE
Routing - PLAN CHECK8/27/1997 8/27/1997 FAIL
CORRECTIONS ON RESUBMITTAL INCOMPLETE FOR AREA WALL. ARCHITECT CONTACTED BY PHONE AND LETTER SENT IN MAIL. MO
Plan resubmittals received  8/27/1997 FAIL
received resubs for pkg #1. MO CONTACTED CRICKETT AT BRS REGARDING EXTERIOR WALL PROTECTION REQUIRED ON EXISTING BUILDING SIDE OF NEW AREA SEPARATION WALL. MO
Routing Off Site - STRUCTURAL8/18/1997 8/21/1997 PASS
RESUBS RETURNED
Routing - PLAN CHECK8/13/1997 8/18/1997 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MO
Plan resubmittals requested  8/18/1997 FAIL
corrections faxed and mailed to architect 8-18-97. MO
Plan resubmittals received  8/18/1997 FAIL
RECEIVED STRUCTURAL PLAN REVIEW RSUBMITTALS 8-18-97. RESUBMITTAL AND CALCS SENT TO ATTWOOD/HINZMAN/JONES FOR REVIEW. MO
Plan assigned to (RGG)7/23/1997 8/13/1997 PASS
Routing Off Site - STRUCTURAL7/25/1997 8/8/1997 FAIL
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD. WAITING FOR AN ADDITIONAL SET. NOTIFIED CRICKET OF THIS NEED. RECEIVED ADDITIONAL SET 7-25-97
Routing - PLUMBING7/28/1997 7/31/1997 PASS
PACKAGE #1
Routing - PLANNING7/29/1997 7/30/1997 PASS
PACKAGE #2 X-REF: DRH97-0032. APPROVED BY JH.
Routing - PUBLIC WORKS7/23/1997 7/29/1997 PASS
PACKAGE #2
Routing - ELECTRICAL7/23/1997 7/28/1997 PASS
PACKAGE #1
Received Certificate of Value  7/23/1997 PASS
Plans ACCEPTED BY PLAN CHECK  7/23/1997 PASS
PACKAGE #3 REQUIRES ONE ADDITIONAL SET. I CONTACTED CRICKET OF THIS NEED. I AM GOING TO ROUTE OTHER PACKAGES. SITE PLAN MAKES REFERENCE TO A SEPARATE CONTRACT. I WILL LET PW FIGURE OUT IF THEY NEED ADDITIONAL INFORMATION.
Plan routing begun/NEW & ADDTN  7/23/1997 PASS
Routing - MECHANICAL7/23/1997 7/23/1997 PASS
PACKAGE #1 NO REVIEW WILL FIELD VERIFY.
Plan assigned to (MYS)7/18/1997 7/23/1997
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  7/18/1997
Application received  7/18/1997