Permit Information
Permit NumberBLD97-02104
StatusFinaled
Name WATERFRONT OFFICE BUILDING
Site Address 3150 200 N LAKEHARBOR LN
Project NameWATERFRONT BLDG
Customer Number 
ePlanReviewNo
Description
To remodel the exit corridor area and add a main lobby off the east side of building per approved plans on file. Work to include the remodel of the existing main core restrooms to provide accessible stalls. The lobby to be 1-hr. rated to connect to the 1-hr. corridor. NOTE: This building is fully fire sprinklered AND alterations to the sprinkler heads are to be in conformance with NFPA # 13 as administered by the Fire Department. (P.C.#464-97) PRP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final2/20/19982/20/19982/20/1999PNR
DetailsCarl Dependahl
CANC PER CONT.
Letter of compliance  5/26/1998 PASS
Letter of Compliance #15056 issued 5-26-98.
INSP - Final5/14/19985/14/19985/14/1998PPASS
DetailsCarl Dependahl
###-#### ###-####pager c/n ok, card signed at site
INSP - Final5/7/19985/8/19985/8/1998PFAIL
DetailsCarl Dependahl
tony ###-####...keep c/n, will recall when ready, need fire
INSP - Final5/6/19985/7/19985/7/1998PFAIL
DetailsCarl Dependahl
tony...still need fire signature (signed 1 card for other permit) keep c/n
INSP-Final Inspection5/5/19985/6/19985/6/1998APASS
DetailsJoe Tawney
05/06/98 406 - ###-#### REINSP OK FOR CERT OF COMPLETION
INSP - Foundation5/5/19985/6/19985/6/1998PNH
DetailsWes Worcester
05/06/98 342 - ###-#### call no answer at this number
INSP - Final2/19/19982/20/19982/20/1998AFAIL
DetailsCarl Dependahl
02/20/98 340 - TONY ###-#### OR ###-####--HE WILL CALL TO SCHEDULE. NEED FIRE OK, WILL RESCHED.
INSP-Final Inspection2/19/19982/19/19982/19/1998PPASS
DetailsJoe Tawney
02/19/98 406 - TONY ###-#### OR ###-#### REINSP FOR FINAL OK FOR CERT OF COMPLETION
INSP-Final Inspection2/17/19982/17/19982/18/1998PPASS
DetailsJoe Tawney
02/17/98 406 - TONY ###-#### REINSP FOR FINAL OK FOR TEMP OCC ì
INSP - Final2/17/19982/17/19982/17/1998PFAIL
DetailsCarl Dependahl
TONY ###-####ba need other perm. sig's, firestops, speaker at corr lid?
INSP - Final2/12/19982/13/19982/13/1998PNR
DetailsCarl Dependahl
###-####
INSP-Final Inspection2/12/19982/13/19982/13/1998PFAIL
DetailsJoe Tawney
02/13/98 406 - ###-#### Tony FINAL FAIL STROBE SPACING IN CORRIDOR ì
INSP - Framing/Rough-in1/22/19981/22/19981/22/1998PNR
DetailsCarl Dependahl
waterfront \\###-####....not frame insp, carpentry only
INSP - Final1/8/19981/8/19981/8/1998PNR
DetailsCarl Dependahl
NEED OTHER OKS & FULL ACCESS
INSP - Final1/8/19981/8/19981/8/1998PCANC
DetailsAlan Hauser
01/08/98 350 - to be done by #340
INSP - Framing/Rough-in12/18/199712/19/199712/19/1997APART
DetailsTom Arcoraci
CEILING GRID grid ok pentrations sealed
INSP - Conference12/19/199712/19/199712/19/1997APASS
DetailsCarl Dependahl
W/ BOB A.& TOM: CN ON SEISMIC OK AT GRID CLG AT CORR'S
INSP - Conference12/19/199712/18/199712/18/1997PPASS
DetailsCarl Dependahl
W/ BOB A: PLENUMS < 12" DO NOT NEED SEISMIC BRACE
INSP - Conference12/18/199712/18/199712/18/1997PPASS
DetailsCarl Dependahl
W/ CEILING INSTALLER RE C/N
INSP - Framing/Rough-in12/16/199712/17/199712/18/1997AFAIL
DetailsCarl Dependahl
12/18/97 340 - ceiling grid C/N, SEISMIC, FIRESTOP ABOVE CLG
INSP - Framing/Rough-in12/8/199712/9/199712/9/1997APASS
DetailsWes Worcester
12/09/97 342 - need ceiling grid inspection
INSP - Conference12/9/199712/9/199712/9/1997 PASS
DetailsWes Worcester
/ / 342 - approved 1 hr modification detail
INSP - Conference10/24/199710/24/199710/24/1997 PASS
DetailsWes Worcester
/ / 342 - need listed assy for electrical panel in corridor walls....2
INSP - Framing/Rough-in10/23/199710/24/199710/24/1997APART
DetailsWes Worcester
10/24/97 342 -
90 day tracking............. 7/21/199710/19/1997
INSP - Framing/Rough-in10/17/199710/16/199710/16/1997PPART
DetailsWes Worcester
C/N, NEED DETAIL FOR 1 HR ASS'Y.OK TO CONTINUE GYP ON CORR. WALLS. 342 FOR 340.
INSP - Framing/Rough-in10/16/199710/16/199710/16/1997PCANC
DetailsCarl Dependahl
PREFER BEFORE 3:30. GAVE TO 342...
INSP - Framing/Rough-in10/16/199710/15/199710/15/1997PFAIL
DetailsCarl Dependahl
NO ACCESS, LEFT C/N...FASTEN GYP; $42 FEE NEXT TIME NO ACCESS. 340
INSP - Framing/Rough-in10/14/199710/15/199710/15/1997ACANC
DetailsAlan Hauser
10/15/97 350 - to be done by #408
INSP - Conference10/6/199710/6/199710/6/1997PFAIL
DetailsWes Worcester
STEED PROJECT MGR STATED THIS WAS A V-1HR BLDG WITH SPRINKLER SUBSTITUTION...? THEY WERE NOT READY FOR A FRAME INSP AND HAVE NUMEROUS PENETRATIONS IN A VN BLDG
INSP - Framing/Rough-in10/6/199710/6/199710/6/1997PNR
DetailsWes Worcester
NUMEROUS PENETRATIONS IN 1 HR CORRIDOR MEMBRANE WITH ROCKED COLUMNS, DUCT PENETRATIONS IN CEILING, CEILING NOT FRAMED COMPLETELY, NEED DETAILS FROM ARCHITECT FOR FIXES, VN BLDG
INSP - Framing/Rough-in10/1/199710/2/199710/1/1997APART
DetailsWes Worcester
INSP - Framing/Rough-in9/25/19979/25/19979/25/1997PPASS
DetailsCarl Dependahl
09/25/97 340 - go to back ask for rob; REQUESTED DETAIL FOR LOOBY AREA
INSP - Conference9/25/19979/25/19979/25/1997APASS
DetailsCarl Dependahl
w/ ROB OF STEED CONST; WANTS DECISION REGARDING 1HR CONST AT NEW/ EXISTING CORRIDOR. TOLD HIM THAT I'D LOOK AT IT, BUT THAT HE NEEDS TO GET DETAIL FROM ARCH.
INSP - Conference9/23/19979/24/19979/24/1997ANR
DetailsCarl Dependahl
09/24/97 340 - NO ONE AT SITE, NO PH# OR CONTACT. WHAT DO THEY WANT??? L
Telephone call  8/25/1997
CALLED WES PERMIT READY
(F) Reprint permit  8/25/1997
Inspection Record Card- Bld  8/25/1997
Issue PAID IN FULL permit  8/25/1997
Print Occupancy Form  8/25/1997
PLANS/APPL TAKEN TO FRONT DESK  8/25/1997 PASS
issue
Plan assigned to (PRP)7/23/1997 8/21/1997 PASS
Details
Waterfront offices--core upgrade, Building B 08/21/97 13:39:11 PRP - this action updated by action script from <<>> in Case No. BLD97-2104
Routing - PLAN CHECK8/7/1997 8/21/1997 PASS
issued
Print Pending Permit.LaserJet4  8/21/1997 PASS
files
Plan resubmittals received  8/20/1997 PASS
received two sets of revised plans for review, approve with red-lining, assemble and issue.
Routing - FIRE8/5/1997 8/7/1997 PASS
Plan Reviewer's activity  8/4/1997 PEND
reviewed plans and history, investigate location and address, correct address for appropriate location in structure and change all related documents. Prepare correction list and fax to Architect 8/5/97.
Plan resubmittals requested8/4/1997 8/4/1997
Routing - PUBLIC WORKS7/23/1997 7/28/1997 PASS
Plan assigned to (MYS)7/21/1997 7/23/1997
DetailsMarlene Southard
Plan routing begun/TENANTS  7/23/1997
This plan to be route to PUBLIC WORKS then back to PLAN CHECK and then sent to the FIRE DEPARTMENT.
Recd Pcfee & Taken To Pln CK  7/21/1997
Application received  7/21/1997
Routing - PLAN CHECK7/28/1997