Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD97-02260
StatusFinaled
Name COSTCO WHOLESALE
Site Address 8109 W FRANKLIN RD
Project NameCOSTCO
Customer Number 
ePlanReviewNo
Description
COSTCO WHOLESALE * INTERIOR: SLICING DELI / ROTISSERIE CHICKEN / EXPANDED FRESH CASES / POINT OF SALES FREEZER / PHARMACY / FOOD SERVICE COURT. EXTERIOR: TIRE SALES ADDITION TO BUILDING OF 2500 sq ft / EXTERIOR CANOPY EXPANSION. NOTE: THIS BUILDING IS FULLY FIRE SPRINKLERED AND MUST MAINTAIN A 60 FT CLEAR SPACE COMPLETLY AROUND THE ENTIRE BUILDING, THIS INCLUDES THE ACCESS ROAD ON THE SOUTH EAST SIDE OF THE BUILDING, FOR UNLIMITED AREA. ANY ALTERATION OR MODIFICATION TO THE FIRE SPRINKLER SYSTEM MUST COMPLY WITH NFPA#13 AS REGULATED BY THE FIRE DEPARTMENT. DR97-0137/MOD CU-0067/MOD PC#499-97(RMH)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  2/19/1999 PASS
Perm. Occ. Cert. #7646 issued 2-19-99 to Costco Wholesale for the tire sales addn. & interior work.
Permanent Occupancy 2/2/19992/2/1999 DONE
Details
Fee Review-notes7/22/1998 7/22/1998 OK
overpayment on plancheck fee. no fee due value did go up. lh
INSP - Final6/30/19986/30/19986/30/1998PPASS
Details
06/30/98 338 - dale ###-#### MADE OK SIGNED THE PERM COL OF OCC REQ CARD
INSP - Final5/18/19985/18/19985/18/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION
INSP - Final5/14/19985/14/19985/15/1998PNR
Details
05/15/98 338 - NEED FIRE SIGNOFF
INSP-Conference4/14/19984/14/19984/14/1998 PART
PRE REINSP CONFERENCE WITH JOB SUPT
INSP-Final Inspection4/1/19984/2/19984/2/1998ANR
DetailsJoe Tawney
04/02/98 406 - dale ###-#### NOT READY INSP CANCELLED WILL RESCHED ì
INSP - Final4/1/19984/2/19984/1/1998ACANC
Details
04/02/98 338 - dale called and cancelled pending ok from fire insp 406
INSP - Final3/26/19983/27/19983/27/1998PNR
Details
03/27/98 338 - DALE WILL CALL YOU TO SCHEDULE--JOE GOING IN AM OTH-OTHER AGENCIES NOT APPROVED will reschedule next week
INSP-Final Inspection3/26/19983/27/19983/27/1998AFAIL
DetailsJoe Tawney
03/27/98 406 - costco ###-#### dale FINAL FAIL HIGH PILED STORAGE ISSUE NOT RESOLVED
INSP-Final Inspection3/24/19983/25/19983/25/1998PPASS
DetailsJoe Tawney
03/25/98 406 - final for the whole job-mike ###-#### SPKLR INSP OK GRINNEL FIRE PROT
INSP - Framing/Rough-in3/13/19983/13/19983/13/1998PPART
Details
03/13/98 338 - ceiling in the food court ok to drop in the tilesceiling
INSP-Final Inspection3/11/19983/11/19983/11/1998PPASS
DetailsJoe Tawney
03/12/98 406 - nick ###-####-food court area SPKLR ROUGH IN OK FOOD COURT AREA
INSP - Framing/Rough-in3/5/19983/6/19983/6/1998APASS
Details
03/06/98 338 - shafts in the rear made ok ASAP PLEASE--DELI CHIX AREA--D
Plan resubmittals received  3/2/1998
RECEIVED 2 COPIES OF SHEET A-1, SHEET M-1, SHEET E-2, SHEET E-3, AND SHEET R1 TO R8. ROUTED TO PERRY PAINE.
INSP - Framing/Rough-in2/26/19982/27/19982/27/1998PPASS
Details
02/27/98 338 - FOOD COURT AT COSTCO--DALE ###-####made ok 02/26/98
INSP - Framing/Rough-in2/23/19982/23/19982/23/1998PPART
Details
02/23/98 338 - dale ###-#### conference
INSP-Sprinkler Rough-in/Hydro1/20/19981/28/19981/28/1998APASS
DetailsJoe Tawney
01/28/98 406 - ###-#### ROUGH IN OK ON HEADS INSTALLED IN PHARMACY
INSP - Framing/Rough-in1/26/19981/27/19981/27/1998PPART
Details
01/27/98 338 - COSTCO\\###-#### CEILINGS OK TO DROP IN TILES AT PHARM.
INSP - Framing/Rough-in1/14/19981/15/19981/15/1998PPASS
DetailsTom Arcoraci
3ostco Dale ###-#### OK FOR COVER AFTER ELEC AND PLUMB ROUGH
INSP - Conference12/11/199712/11/199712/11/1997 PASS
Details
/ / 338 - made ok
INSP - Framing/Rough-in12/4/199712/5/199712/5/1997APART
Details
/ / 338 - ok to cover with the ele division approval e
INSP-Sprinkler Rough-in/Hydro11/25/199712/1/199712/2/1997PPASS
DetailsJoe Tawney
12/01/97 406 - OK ON HYDRO TEST FOR SPKLR ADDITION IN TIRE SHOP
INSP - Roof11/21/199711/24/199711/24/1997APASS
Details
EARLY AM PLEASE NAILING OK STR STRAPS PER THE APPROVED PLAN
Plan Reviewer's activity  11/6/1997 PASS
RECEIVED RESUBMITED PLANS SHOWING AN 8 FT EXTENSION OF THE TIRE SALES AREA, WHICH WILL ADD 288 SQ FT MORE TO BUILDING AREA, SPOKE WITH MARCUS FROM ACHD HE SAID HE HAD NO CONCERNS, SPOKE WITH TEMPRA WILSON SHE INDICATED SHE HAD NO CONCERNS.
90 day tracking............. 8/4/199711/2/1997 PEND
INSP - Footings10/24/199710/27/199710/27/1997PPASS
Details
READY AT 1:00 R-BAR PLACED SP INSP ON SITE
Issue PAID IN FULL permit  10/22/1997
Inspection Record Card- Bld  10/21/1997
Print Occupancy Form  10/21/1997
Plan Reviewer's activity  10/20/1997 PASS
Recieved spec book, structural changes, architech modifications, cooler information and new certificate of value.
PLANS/APPL TAKEN TO FRONT DESK  10/20/1997 PASS
Print Pending Permit.LaserJet4  10/20/1997 PASS
Plan assigned to (R_H)8/5/1997 10/20/1997 PASS
Details
10/20/97 15:16:10 R_H - this action updated by action script from <<>> in Case No. BLD97-2260
Routing - FIRE10/13/1997 10/17/1997 PASS
Routing - PLAN CHECK10/13/1997 10/13/1997
Routing Off Site - A.C.H.D10/6/1997 10/13/1997 PEND
FEES DUE
Routing - PLAN CHECK9/30/1997 10/6/1997
Plan Reviewer's activity  10/2/1997 FAIL
Met with Mr. Wong representing Mullvaney Architects, I indicated to him that I just began my review of the project. And that I was sending a correction list to the Engineer, for clarifications. I also told him that I would need a copy of the specifications book, manufactures information on the new cooler that is being installled, a new detail of the type one hood shaft that is being installed, a revision showing that there is a rated door in an existing opening in a one-hour occupancy separation. The plans need to reviewed by fire and then sent back out to ACHD for there signiture and approval.
Plan Reviewer's activity  10/1/1997 PEND
Received plans and began review today 10-01-97.
Routing - PLANNING9/16/1997 9/29/1997 PASS
DR Approved by: TKW CU Approved by: RLB
Routing - PLUMBING9/10/1997 9/16/1997 PASS
Routing - ELECTRICAL9/16/1997 9/16/1997 PASS
FIELD VERIFY.
Routing - PUBLIC WORKS9/3/1997 9/9/1997 PASS
Routing Off Site - C.D.H8/18/1997 8/28/1997 PASS
CONTACTED MIKE MCNARY AT ###-#### TO TAKE PLANS OUT TO CDH.
Routing Off Site - A.C.H.D8/12/1997 8/18/1997 FAIL
CONTACTED MIKE MCNARY AT ###-#### TO TAKE PLANS OUT TO ACHD. TRAFFIC STUDY REQUIRED BY ACHD.
Plan routing begun/NEW & ADDTN  8/12/1997 PASS
Plan assigned to (MYS)8/4/1997 8/12/1997
DetailsMarlene Southard
Routing - MECHANICAL8/12/1997 8/12/1997 PASS
NO REVIEW FIELD VERIFY
Plans ACCEPTED BY PLAN CHECK  8/12/1997 PASS
Received Certificate of Value  8/5/1997 PASS
Recd Pcfee & Taken To Pln CK  8/4/1997
Application received  8/4/1997
Routing - PLAN CHECK10/20/1997