Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-02393
StatusFinaled
Name BOULEVARD
Site Address 1121 S CAPITOL BLVD
Project NameBOULEVARD APARTMENTS
Customer Number 
ePlanReviewNo
Description
To upgrade an existing motel to 21 apartments per approved plans on file. Work to include installation of a new 13-R Fire Sprinkling system on the main floor, basement, and in the attic, installation of new kitchenette cabinets, repair of damaged shower stalls, flooring and framing under showeres and other areas needed, installation of three new doors and landings and stairs out of the rear of the building, construct new draft stops in attic locations, remove existing roofing and replace with new class B roofing over new sheathing, install a new ramp and door to laundry area, create a new accessible rest room and office area, repair walls, ceilings, and flooring as needed and as per plans attached . NOTE: This building to be fully fire sprinklered with a 13-R system under this permit in accordance with 1994 UBC Section 904.2.8 as regulated by the Fire Department. CU-72-94/DR-144-94. (P.C.#525-97) PRP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval  2/23/1999 PASS
Final signed. ased upon replacement of one dead pinetree nw corner.
Permanent Occupancy 8/25/19988/25/1998 DONE
Details
Permanent occupancy  8/25/1998 PASS
Perm. Occ. Cert. #7367 issued 8-25-98 to the Boulevard Apts.
DOC - C/O Approved8/5/19988/5/19988/5/1998 PASS
Details
/ / 333 - CARD SIGNED
Temporary occupancy  2/27/1998 PASS
Temp. Occ. Cert. #3555 issued 2-27-98 to the Boulevard Motel Apts.
Code Occupancy Approval  2/27/1998 TEMP
Bond posted for remaining landscape work. Temporary Occup. ok.
INSP - Final2/26/19982/26/19982/26/1998PCANC
DetailsJim Storey
INSP-Final Inspection2/26/19982/26/19982/26/1998PPASS
DetailsRick Jackson
called in by contractor - Don for 1:30 all items corrected
INSP - Final2/26/19982/26/19982/26/1998PFAIL
Details
02/27/98 333 - OTH-OTHER AGENCIES NOT APPROVED
INSP-Sprinkler Rough-in/Hydro2/24/19982/25/19982/26/1998PPART
DetailsRick Jackson
02/25/98 409 - shelly ###-#### rough-in of attic area completed and okay. they will retent. all other corrected. draft stops not complete at far south and north ends. temp o approved.
INSP-Final Inspection2/24/19982/24/19982/24/1998AFAIL
DetailsRick Jackson
correction notice issued. must verify sprinkler piping in attic, knox box, alarm plans, PIV lock, accessible room alarms, inspecotrs test door in room 22, hydraulic data nameplate on riser
INSP - Final2/20/19982/23/19982/23/1998ANR
DetailsJim Storey
02/23/98 301 - ###-#### DON trans to kim via cell phone.
INSP-Final Inspection2/23/19982/23/19982/23/1998PNR
DetailsRick Jackson
DON ###-#### corrections from 2/20 not completed. alarms/sprinkler not ready.
Code Occupancy Approval  2/20/1998 PEND
Checked site. Not ready for inspection. Still preparing ground for planting, irrigation system, plants etc.. Check Monday for progress.
INSP-Sprinkler Rough-in/Hydro2/18/19982/19/19982/19/1998AFAIL
DetailsJoe Tawney
02/19/98 406 - SHELLIE ###-#### UNDERGROUND HYDRO TEST FAIL RESTRICTION IN PIPE OR PIV VLV
INSP-Final Inspection2/18/19982/19/19982/19/1998PPART
DetailsJoe Tawney
02/19/98 406 - SHELLIE ###-#### OK ON UNDERGROUND FLUSH & ABOVE GROUND HYDRO TESTS EXCEPT FOR FDC PIPING
INSP - Framing/Rough-in2/19/19982/19/19982/19/1998PPART
Details
02/19/98 333 - pre final PRELIM CONF WITH DON AT ###-####
PubWorks Occupancy Approval  2/5/1998 DONE
Project complete 02/05/98. D.Hagen
INSP-Conference1/27/19981/27/19981/27/1998APART
DetailsRick Jackson
basement requirements, reviewed plans.
INSP-Conference1/5/19981/7/19981/7/1998PPART
DetailsRick Jackson
01/07/98 409 - relocated water main, riser in basement, outside valve/on question. architect was going to be on-site today to see if one hour co done.
Receive PAYMENT IN FULL  11/26/1997
Inspection Record Card- Bld  10/29/1997
Print Pending Permit.LaserJet4  10/29/1997 PASS
files
Telephone call  10/29/1997
LEFT MESSAGE W/SECRETRARY
Routing - PLAN CHECK10/28/1997 10/29/1997 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/29/1997 PASS
issue
Print Occupancy Form  10/29/1997
Issue & PRINT FEE-DUE permit  10/29/1997
Plan Reviewer's activity  10/29/1997 PASS
reviewed plans, prepare correction list and Fax to Arch, set meeting with Arch 10/14/97. Hold till after meeting then forward back to PW and Planning, Talk to Marlene about sending to Plumbing. 10/29/97-Received plans back from routing, input into Tidemark, Fax request for updated C of V, issue upon reciept.
Plan assigned to (PRP)8/19/1997 10/29/1997 PASS
Details
BEGAN ROUTING 8/21/97 10/29/97 13:05:08 PRP - this action updated by action script from <<>> in Case No. BLD97-2393
Routing - PLANNING10/23/1997 10/27/1997 PASS
X-REF: DRH97-0201. APPROVED BY MGS.
Routing - FIRE10/21/1997 10/23/1997 PASA
Plan resubmittals received  10/21/1997 PEND
RECIEVED RESUBS AS NEEDED, INSERT TO PLANS AND FORWARD TO FIRE.
Routing - PLAN CHECK10/17/1997 10/21/1997
Routing - PUBLIC WORKS10/15/1997 10/16/1997 PASS
Routing - PLAN CHECK10/15/1997 10/15/1997
Routing - PLUMBING10/14/1997 10/15/1997 PASS
Application received  10/14/1997
Routing - PLAN CHECK10/8/1997 10/14/1997
Plan resubmittals requested10/13/1997 10/13/1997
Routing - PLANNING10/5/1997 10/7/1997 FAIL
PHONED JIM FACKRELL 10/7/97 AND LET HIM KNOW WE NEED A STAFF LEVEL DR. REVIEWED BY TKW.
Routing - PUBLIC WORKS9/19/1997 10/3/1997 FAIL
REQUIRES DRAINAGE PLAN.
Routing Off Site - A.C.H.D8/21/1997 9/19/1997 FAIL
PLANS NOT SIGNED. ACHD FEES PAID 10/28/97
(F) Reprint permit  8/26/1997
Plan routing begun/TENANTS  8/19/1997
Route to ADA COUNTY HIGHWAY DISTRCIT, PUBLIC WORKS, PLANNING then back to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT.
Application received  8/14/1997
Routing - PLANNING10/24/1997