SAILFISH PLACE (SHELL BUILDING) TO BUILD A NEW 13,100 SQ. FT., ONE STORY SHELL BUILDING, CONSTRUCTED OF CONCRETE TILT-UP EXTERIOR WALLS, CONCRETE SLAB FLOOR, TRUSS JOIST ROOF SYSTEM SUPPORTED BY GLU-LAM BEAMS AND STEEL INTERIOR COLUMNS. THIS BUILDING IS FULLY FIRE SPRINKLED. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. THE ARCHITECT HAS INDICATED THAT THE BUILDING TENANTS WILL BE B,S1,F1 & M OCCUPANCIES. IF ANY OTHER OCCUPANCIES ARE PROPOSED FOR THIS BUILDING, THEY MUST MEET ALL APPLICABLE CODE REQUIREMENTS. THIS PERMIT IS FOR THE CONSTRUCTION OF A SHELL BUILDING ONLY. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING; NO OCCUPANCY IS PERMITTED UNDER THIS PERMIT. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DR#144-96 PC#529-97/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/22/2003  
Letter of compliance  11/18/1999 DONE
Letter of Compliance #18183 issued 11-18-99.
BLD-Final11/4/199911/4/199911/4/1999PPASS
Details
Ok for L/C
Code Occupancy Approval  11/4/1999 DONE
Meets compliance with DR-144-96
INSP - Final4/9/19994/9/19994/9/1999 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION ON SHELL
INSP-Conference4/1/19994/1/19994/1/1999 PART
DetailsJoe Tawney
/ / 406 - CONF W/DAVE TUCKER REG SIGN OFF OF PERMIT
Temporary occupancy  12/22/1998 PASS
Temp. Occ. Cert. #3762 issued 12-22-98 to the Sailfish Place Bldg.
INSP - Final12/21/199812/21/199812/21/1998 PART
Details
12/21/98 338 - c/n issued need fire; ele; p/z; and mech perm sign-off
INSP - Final12/18/199812/18/199812/18/1998 PART
DetailsJoe Tawney
/ / 406 - REINSP OK FOR TEMP OCC CONTROL VLV SUPR, ACCELERATOR
INSP-Final Inspection12/17/199812/17/199812/17/1998PFAIL
DetailsJoe Tawney
12/17/98 406 - dwayne- ###-#### fn fire REINSP FAIL ACCEL FAILED DUCT DET CONTROL VLV MONITORING
Fee Review-notes7/14/1998 12/15/1998
INSP-Final Inspection12/4/199812/7/199812/7/1998PFAIL
DetailsJoe Tawney
12/07/98 406 - dwayne ###-#### fn fire per joe 1? REINSP FAIL SPKLR SYSTEM DUCT DET
INSP - Final12/2/199812/4/199812/4/1998AFAIL
Details
12/04/98 338 - OTHER AGENCIES NOT APPROVED
INSP - Final12/3/199812/3/199812/3/1998 FAIL
DetailsJoe Tawney
/ / 406 - FINAL FAIL SPKLR SYSTEM NOT READY FOR TEST
PubWorks Occupancy Approval  11/13/1998 DONE
Drainage project complete, signed permanent occupancy 11/13/98. R.Cummings
Print Occupancy Form  11/12/1998
INSP-Sprinkler Rough-in/Hydro10/9/199810/12/199810/12/1998PPART
DetailsJoe Tawney
10/12/98 406 - brian ###-#### r-in spr insp-early if possible OK ROUGH IN OF SHELL & 1ST FLR OK HYDRO TEST 1ST FLR
INSP-Sprinkler Rough-in/Hydro6/3/19986/3/19986/3/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON HYDRO TEST OF FDC
INSP-Sprinkler Rough-in/Hydro5/29/19985/29/19985/29/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON HYDRO TEST EXCEPT FDC PIPING
INSP-Supply line flush5/29/19985/29/19985/29/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Framing/Rough-in3/30/19983/30/19983/31/1998PPASS
DetailsJim Storey
03/30/98 301 - RF -OK ROOF NAILING
INSP - Framing/Rough-in3/18/19983/18/19983/18/1998PPART
Details
03/18/98 338 - nailing robbie edmans -nails in deck penetrate to far int
INSP - Framing/Rough-in3/18/19983/18/19983/18/1998 PASS
Details
/ / 338 - with cornell larson, will get nailing problems resolved and,
INSP - Framing/Rough-in1/26/19981/26/19981/26/1998PPART
Details
01/26/98 338 - robert ###-#### made ok r-bar placed ok to pour with sp i to re-check panel # 5
INSP - Foundation1/6/19981/7/19981/7/1998APASS
Details
01/07/98 338 - made ok with sp insp approval
INSP - Footings12/29/199712/30/199712/30/1997APASS
Details
12/30/97 338 - made ok with sp insp papproval
INSP - Footings12/17/199712/17/199712/18/1997PPASS
Details
12/17/97 338 - made ok with the ok from the special inspector
INSP - Footings12/16/199712/16/199712/16/1997PCANC
DetailsDave Lightfoot
12/16/97 337 -
INSP - Framing/Rough-in12/12/199712/15/199712/15/1997ACANC
Details
12/15/97 338 - this is to be concrete reinforcing for tilt up walls
INSP - Framing/Rough-in12/12/199712/15/199712/15/1997ACANC
Details
12/15/97 338 - this is to be a reinforcing inspection for tilt up walls
INSP - Footings11/10/199711/12/199711/12/1997APART
Details
center col forms only ok after sp insp approval
90 day tracking............. 8/14/199711/12/1997
FEE REVIEW-NOTES  10/30/1997 FEES
OVERPAYMENT ON PLAN CHECK 213.71 REFUND
(F) Reprint permit  10/27/1997
Issue PAID IN FULL permit  10/24/1997
Telephone call  10/23/1997
called dave tucker
PLANS/APPL TAKEN TO FRONT DESK  10/23/1997 PASS
Print Occupancy Form  10/23/1997
Inspection Record Card- Bld  10/23/1997
Routing - PLAN CHECK10/20/1997 10/23/1997 PASS
package #1
Plan assigned to (JCM)10/9/1997 10/23/1997 PASS
DetailsJohn Menard
Routing - PLAN CHECK9/15/1997 10/23/1997 PASS
PACKAGE #3 RESUB FROM ENGINEERING.
Routing - FIRE10/14/1997 10/20/1997 PASS
PACKAGE #1
Routing - PLAN CHECK10/3/1997 10/14/1997
PACKAGE #1
Plan resubmittals requested  10/13/1997 PEND
CORRECTION LIST SENT TO THE ARCHITECT (CORNEL LARSON) FOR REQUESTED REVISIONS.
Plan assigned to (RGG)8/18/1997 10/9/1997 PASS
Routing Off Site - A.C.H.D8/18/1997 10/1/1997 PASS
PACKAGE #2 CONTACTED CORNEL LARSON AT ###-#### TO TAKE PLANS OUT TO ACHD fees paid IMPACT FEE CERTIFICATE #97-5033
Routing - FIRE9/12/1997 9/23/1997 PEND
PACKAGE #1 9-12-97 for grading.
Routing - ELECTRICAL9/23/1997 9/23/1997 PASS
PACKAGE #1 FIELD VERIFY.
Routing Off Site - STRUCTURAL9/11/1997 9/15/1997 PASS
RESUBS SENT TO STRUCTURAL ENGINEER. RESUBS RETURNED FROM STRUCT. GAVE TO PC ( BEHIND BOB'S DOOR ) PLAN RESUBMITTALS APPROVED - SEE LETTER IN FILE FROM ATWOOD-HINZMAN-JONES (RILEY MAHAFFEY)
Routing - PLUMBING9/9/1997 9/11/1997 PASS
PACKAGE #1
Routing - PLANNING9/3/1997 9/5/1997 PASS
PACKAGE #1 X-REF: DR-144-96. NOTE: BRIAN JORGENSON (FORESTRY) VERBALLY AGREED TO THE WAIVER OF RECOMMENDATION D OF HIS STAFF REPORT DATED 12/24/96. APPROVED BY SB.
Routing - PUBLIC WORKS8/18/1997 9/3/1997 PASS
PACKAGE #1
Routing Off Site - STRUCTURAL8/18/1997 8/26/1997 PEND
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAND, JONES PACKAGE #3 RETURNED FROM AHJ, WITH COMMENTS.
Plans ACCEPTED BY PLAN CHECK  8/18/1997 PASS
Plan routing begun/NEW & ADDTN  8/18/1997 PASS
Routing - MECHANICAL8/18/1997 8/18/1997 PASS
PACKAGE #1 NO REVIEW FIELD VERIFY.
Plan assigned to (MYS)8/14/1997 8/15/1997
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  8/14/1997
Application received  8/14/1997