Case Summary (BLD) | | | 7/18/2005 | | |
|
|
|
|
Receive PAYMENT IN FULL | | | 12/23/1998 | | |
|
|
|
|
Fee Review-notes | 8/4/1998 | | 9/10/1998 | | DONE |
|
|
|
ADDITIONAL VALUE OF 10616.00 LH
|
CHANGE STATUS TO (F) | | | 8/4/1998 | | |
|
|
|
|
Permanent occupancy | | | 5/28/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7260 issued 5-28-98 to the Idaho State Liquor Dispensary.
|
INSP - Final | 5/26/1998 | 5/27/1998 | 5/27/1998 | P | PASS |
Jim Storey
|
|
|
05/27/98 301 - FNL -OK FINAL
|
Permanent Occupancy | | 5/27/1998 | 5/27/1998 | | DONE |
|
|
|
|
INSP - Final | 3/19/1998 | 3/20/1998 | 3/20/1998 | P | PASS |
Jim Storey
|
|
|
03/20/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED temp ok for al
|
INSP-Final Inspection | 3/19/1998 | 3/20/1998 | 3/20/1998 | A | PASS |
Rick Jackson
|
|
|
301 IS GOING OUT ALSO IN THE PM PAT-###-#### all items corrected. occ approved
|
Code Occupancy Approval | | | 3/19/1998 | | PEND |
|
|
|
Final Occupancy request. SITE INSPECTION STILL SHOWED BUILDING NOT PAINTED, HE WILL CALL BACK WHEN DONE.
|
Temporary occupancy | | | 3/2/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3559 issued 3-2-98 to the Idaho State Liquor Dispensary for the ofc. area on the 1st floor only.
|
INSP - Final | 2/27/1998 | 2/27/1998 | 2/27/1998 | P | PART |
Jim Storey
|
|
|
02/27/98 301 - ###-#### pat FNL -OK FINAL OF THE OFFICE AREA FIRST FLOOR ONLY. NO OCCUPANCY OF THE S STORAGE AREA ABOVE THE OFFICE AND WAREHOUSE IS TO BE ALLOWED. ALL WORK P SCOPE OF PERMIT IS TO BE COMPLETED FOR PERMINT SIGN OFF WITH IN MAX. 90 TEMP.OCC GRACE
|
INSP-Final Inspection | 2/27/1998 | 2/27/1998 | 2/27/1998 | P | PART |
Rick Jackson
|
|
|
requested by steed. temp occ approved for office only. sprinklers for racking not complete. hydro and monitoring tests okay.
|
INSP-Conference | 2/27/1998 | 2/18/1998 | 2/27/1998 | | PASS |
|
|
|
DSM met with dave kadanko & based on the ongoing discussions & test in the code world surrounding smoke curtains, vents, & spk as they interreelate for high piled & rack storage, dsm agreed to approve kadanko request for draft curtain area of 3300 sqft Provided they use ELO sprinklers.
|
INSP - Framing/Rough-in | 2/25/1998 | 2/26/1998 | 2/26/1998 | A | CANC |
Russ Owen
|
|
|
02/26/98 407 - trans to 301 nspection
|
INSP-Sprinkler Rough-in/Hydro | 2/25/1998 | 2/25/1998 | 2/25/1998 | P | PART |
Rick Jackson
|
|
|
rough-in of office area - okay. seismic in warehouse not complete. mezzanine not sprinklered yet, small part of warehouse not complete. still needs hydro and monitoring.
|
Code Occupancy Approval | | | 2/25/1998 | | FAIL |
|
|
|
Building not painted, all landscape in in as required and parking lot strips not in, Bond posted for $19600.00 for uncompleted items required under DRH97-124, Temporary singed off today.
|
INSP - Framing/Rough-in | 2/20/1998 | 2/23/1998 | 2/24/1998 | P | NR |
Jim Storey
|
|
|
02/23/98 301 - ###-#### state liquor recall
|
Code Occupancy Approval | | | 2/23/1998 | | PEND |
|
|
|
Occupancy requested by: Pat ###-#### office ###-#### digital pager.
|
Code Occupancy Approval | | | 2/23/1998 | | FAIL |
|
|
|
Building was not painted as required, parking areas not stripped and handicapped areas not marked and signed as required, no trees planted, I informed Pat from Steed Construction (###-####) of the requirement for bonding, will recall for bonding OK Thr. or Fri.
|
INSP-Conference | 2/11/1998 | 2/11/1998 | 2/11/1998 | P | PART |
Rick Jackson
|
|
|
discussed curtain board design/area coverage. areas under boards are over 3,000 sq ft. steed to contact hummel about problem.
|
INSP - Framing/Rough-in | 1/16/1998 | 1/20/1998 | 1/21/1998 | A | NH |
Russ Owen
|
|
|
01/20/98 407 - could not find the contractor.called the number no answer they wanted.
|
90 day tracking............. | | 8/22/1997 | 11/20/1997 | | PEND |
|
|
|
|
(F) Reprint permit | | | 11/14/1997 | | |
|
|
|
|
(F) Reprint permit | | | 11/13/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/13/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/12/1997 | | |
|
|
|
|
Telephone call | | | 11/12/1997 | | |
|
|
|
TALKED TO DAVID-GAVE DOLLAR AMOUNT
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/1997 | | PASS |
|
|
|
|
Print Occupancy Form | | | 11/12/1997 | | |
|
|
|
|
Routing - FIRE | 11/10/1997 | | 11/12/1997 | | PASS |
|
|
|
PACKAGE #2
|
Print Pending Permit.LaserJet4 | | | 11/12/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/24/1997 | | 11/10/1997 | | |
|
|
|
PACKAGE #2
|
Routing - PLAN CHECK | 10/30/1997 | | 11/10/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 9/8/1997 | | 11/10/1997 | | |
|
|
|
package #3
|
Routing - FIRE | 10/22/1997 | | 10/29/1997 | | FAIL |
|
|
|
PACKAGE #2
|
Plan assigned to (RGG) | 8/27/1997 | 10/10/1997 | 10/20/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/19/1997 | | 10/20/1997 | | |
|
|
|
PACKAGE #1
|
Plan Reviewer's activity | | | 10/15/1997 | | |
|
|
|
ISSUED A EARLY FOUNDATION PERMIT UNDER MIS97-0211 AT THE REQUEST OF THE CONTRACTOR.
|
Routing - PUBLIC WORKS | 9/16/1997 | | 9/24/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing - PLUMBING | 9/18/1997 | | 9/19/1997 | | PASS |
|
|
|
|
Routing - FIRE | 9/16/1997 | | 9/17/1997 | | PEND |
|
|
|
PACKAGE #1 APPROVED FOR GRADING AND DRAINAGE PERMIT ONLY, PROVIDED THAT AT LEAST 2750 GPM OF FIRE FLOW IS AVAILABLE AT HYDRANT(S) TO BE INSTALLED FOR THIS PROJECT. AT LEAST ONE HYDRANT MUST BE PROVIDED PRIOR TO ANY COMBUSTIBLE MATERIAL STORAGE ON THIS SITE.
|
Routing Off Site - A.C.H.D | 8/27/1997 | | 9/16/1997 | | PASS |
|
|
|
PACKAGE #2 CONTACTED RANDY STEED AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES PAID #98-0271
|
Routing - PLANNING | 9/11/1997 | | 9/16/1997 | | PASS |
|
|
|
X-REF: DRH97-0124. APPROVED BY MGS.
|
Plan Reviewer's activity | | | 9/8/1997 | | PEND |
|
|
|
FAXED A COPY OF THE STRUCTURAL ENGINEER'S COMMENTS TO THE ARCHITECT OF RECORD FOR HIM TO REVIEW AND FORWARD TO THE ENGINEER OF RECORD FOR RESPONSE. - THIS PROJECT HAS NOT YET BEEN ASSIGNED TO A PLAN REVIEWER. JCM
|
Routing Off Site - STRUCTURAL | 8/27/1997 | | 9/8/1997 | | |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL DRAWINGS AND CALCULATIONS RETAINED AT CH2MHILL STRUCTURAL REVIEW LETTER GIVEN TO JOHN M.
|
Plans ACCEPTED BY PLAN CHECK | | | 8/27/1997 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/27/1997 | | PASS |
|
|
|
|
Routing - MECHANICAL | 8/27/1997 | | 8/27/1997 | | PASS |
|
|
|
PACKAGE #1
|
Received Certificate of Value | | | 8/22/1997 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/22/1997 | | |
|
|
|
|
Application received | | | 8/22/1997 | | |
|
|
|
|
Routing - PUBLIC WORKS | 8/27/1997 | | 9/11/1907 | | FAIL |
|
|
|
PACKAGE #1 REQUIRES DRAINAGE PLAN. BM REVISE PLANS TO "PROTECT EXISTING GRAVEL ROAD" AND CONSTRUCT " CONSTRUCT ROAD TO PROPOSED MANHOLE". JJ
|