Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD97-02510
StatusFinaled
Name MICRON TECH
Site Address 8000 S FEDERAL WAY
Project NameMIC #24 (FAB4 REMOD)
Customer Number 
ePlanReviewNo
Description
MICRON BUILDING #24 (PROJECT #2013) * TO DEMOLISH AN 1100 SQUARE FOOT AREA IN SPACE 118A, INCLUDING REMOVAL OF THE EXISTING SLAB FLOOR AND EXCAVATE FOR NEW SLAB FLOOR AND CONCRETE PIPE TRENCH BELOW NEW RAISED ACCESS FLOOR; AND TO REFINISH AS RECLAIM/FAB 4 118A AREA AND SERVICE AISLE AREA 118B. THIS AREA IS LOCATED EAST OF EXIT CORRIDOR 100AA AND SOUTH OF EXIT CORRIDOR 100AB, AT THE WEST CENTRAL AREA OF THE BUILDING. THIS PERMIT ALSO INCLUDES INSTALLATION OF NEW CONCRETE FOOTINGS AND PEDESTALS TO SUPPORT THE NEW SECOND LEVEL AIR HANDLING EQUIPMENT PLATFORM OVER THIS AREA. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. PC#562-97
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  4/17/2001 DONE
Receive PAYMENT IN FULL  12/15/1999 DONE
Fee Review-notes12/7/1998 3/23/1999
Letter of compliance  2/9/1999 PASS
Letter of Compliance #14972 issued 2-9-99 to Micron Technology.
INSP-Final Inspection1/26/19991/27/19991/27/1999APASS
DetailsRick Jackson
01/27/99 409 - occ approved
INSP - Final1/22/19991/27/19991/27/1999APASS
DetailsJim Storey
01/27/99 301 - FNL -OK FINAL
INSP-Final Inspection8/21/19988/25/19988/25/1998APASS
DetailsRick Jackson
dan ###-####-bldg 25 reception area sprinkler head problem corrected - occ approved
INSP-Sprinkler Rough-in/Hydro8/7/19988/14/19988/14/1998APART
DetailsRick Jackson
dan ###-#### sprinkler heads mixed within service corridor (quick response and regular)
INSP - Wall cover5/13/19985/15/19985/15/1998AFAIL
DetailsJim Storey
05/15/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED fire stopping
Receive PAYMENT IN FULL  10/27/1997
Inspection Record Card- Bld  9/30/1997
Print Occupancy Form  9/30/1997
Issue & PRINT FEE-DUE permit  9/30/1997
PLANS/APPL TAKEN TO FRONT DESK  9/30/1997 PASS
Plan assigned to (JCM)9/3/1997 9/29/1997 PASS
DetailsJohn Menard
Routing - PLAN CHECK9/29/1997 9/29/1997 PASS
Routing - FIRE9/24/1997 9/25/1997 PASS
Routing - PLAN CHECK9/12/1997 9/24/1997
Plan Reviewer's activity  9/23/1997 PASS
FINISHED PLAN REVIEW APPROVED AS SUBMITTED AND ROUTED TO FIRE DEPARTMENT FOR THEIR REVIEW.
Received partial PAYMENT  9/12/1997
Routing - PLUMBING9/5/1997 9/10/1997 PASS
Routing - PUBLIC WORKS9/3/1997 9/4/1997 PASS
Received Certificate of Value  9/3/1997 PASS
Routing - MECHANICAL9/3/1997 9/3/1997 PASS
NO REVIEW FIELD VERIFY.
Routing - ELECTRICAL9/3/1997 9/3/1997 PASS
NO REVIEW FIELD VERIFY.
Plans ACCEPTED BY PLAN CHECK  9/3/1997 PASS
Plan routing begun/TENANTS  9/3/1997 PASS
Application received  8/26/1997
Issue & PRINT FEE-DUE permit  8/26/1997