Case Summary (BLD) | | | 6/29/2004 | | |
|
|
|
|
Case Summary (BLD) | | | 6/14/2000 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/15/1999 | | DONE |
|
|
|
Perm. Occ. Cert. #7942 issued 10-15-99 to the Amerisuites Hotel.
|
BLD-Final | 10/8/1999 | 10/11/1999 | 10/9/1999 | A | PASS |
|
|
|
Final reinspect for the Amerisuites Hotel
|
Permanent Occupancy | | 10/8/1999 | 10/8/1999 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/7/1999 | 10/5/1999 | 10/5/1999 | P | PASS |
Joe Tawney
|
|
|
reinsp ok for permanent occupancy
|
INSP-Final Inspection | 5/12/1999 | 5/12/1999 | 5/12/1999 | P | NR |
Joe Tawney
|
|
|
05/12/99 406 - not ready allC/N items not completed
|
Code Occupancy Approval | | | 4/28/1999 | | PASS |
|
|
|
Inspected for Final. They did not put 2' berm at front of proj. - o.k.'d by TKW 4/28/99 - no parking in this area and no negative impact - nothing along here that a 2' berm could buffer. Meets compliance with DR-8-97. PASS
|
INSP-Conference | 1/22/1999 | 1/22/1999 | 1/22/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CHECKED LOCATION OF HYDRANTS AT SITE TO VERIFY ADEQUATE WATE OK
|
INSP - Final | 1/11/1999 | 1/11/1999 | 1/11/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR FULL TEMP OCC
|
INSP - Final | 1/11/1999 | 1/11/1999 | 1/11/1999 | | PART |
|
|
|
/ / 338 - MADE OK FOR TEMP SIGNED THE TEMP COLSTILL NEED HARD COPY OF
|
SUPER- Supervisor's review | 1/7/1999 | 1/7/1999 | 1/7/1999 | | |
|
|
|
temp issued some question on low level exit signs. problem resoved.
|
INSP - Final | 1/7/1999 | 1/7/1999 | 1/7/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR LIMITED TEMP OCC NO PUBLIC ACCESS AT THIS TIME.
|
SUPER- Supervisor's review | 1/7/1999 | 1/6/1999 | 1/6/1999 | | |
|
|
|
revied final process with inspectors. still not open will do finals and test dampers.
|
INSP - Final | 1/6/1999 | 1/6/1999 | 1/6/1999 | | PART |
|
|
|
/ / 338 - made ok for conditionaql temporary occ cert for hotel person
|
INSP-Final Inspection | 1/4/1999 | 1/5/1999 | 1/5/1999 | A | NR |
Joe Tawney
|
|
|
01/05/99 406 - Preston ###-#### FINAL NOT READY
|
Code Occupancy Approval | | | 1/4/1999 | | FAIL |
|
|
|
Bond posted for stripping & landscaping - $15,950.00
|
INSP - Final | 12/30/1998 | 12/31/1998 | 12/31/1998 | A | FAIL |
Tom Arcoraci
|
|
|
12/31/98 408 - preston- ###-#### temp occ insp NOT READY WITH FIRE INSPECTOR
|
INSP-Final Inspection | 12/30/1998 | 12/31/1998 | 12/31/1998 | A | FAIL |
Rick Jackson
|
|
|
preston- ###-#### fn fire insp tested sprinkler alarms only. corridors and stairtowers not complete.
|
INSP-Final Inspection | 12/31/1998 | 12/31/1998 | 12/31/1998 | | FAIL |
Rick Jackson
|
|
|
12/31/98 409 - preston- ###-#### fn fire insp tested sprinkler alarm portion only. stair towers and corridors, alarms
|
Temporary occupancy | | | 12/31/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3767 issued 12-31-98 to the Amerisuites Hotel (note special conditions on this t.o.)
|
INSP-Final Inspection | 12/14/1998 | 12/17/1998 | 12/17/1998 | A | PART |
Joe Tawney
|
|
|
12/17/98 406 - ERIC PAGER ###-#### PER JOE 9:00 FN INSP
|
SUPER- Supervisor's review | 12/16/1998 | 12/16/1998 | 12/16/1998 | | |
|
|
|
profit in progress. perry keeper of record for all trades smooth so far.perry managing site
|
Fee Review-notes | 7/15/1998 | | 12/15/1998 | | |
|
|
|
|
INSP-Conference | 12/14/1998 | 12/14/1998 | 12/14/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - PROFIT MEETING WITH ALL INSPECTORS, CONTRACTOR AND SUB CONTR
|
SUPER- Supervisor's review | 12/14/1998 | 12/14/1998 | 12/14/1998 | | |
|
|
|
PROFIT MEETING. P. PAINE IN CHARGE. MIKE OTTO ATTENDING AS WELL AS ASSIGNED INSPECTORS. RULES SET. SHOULD GO WELL
|
INSP - Framing/Rough-in | 12/10/1998 | 12/11/1998 | 12/11/1998 | A | PART |
|
|
|
12/11/98 338 - made ok to drop in he tile in east hall 1st floor
|
INSP - Final | 12/10/1998 | 12/10/1998 | 12/10/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST OF 1ST & 2ND FLRS, OK ON BOOSTER PUMP TEST
|
INSP - Wall cover | 11/13/1998 | 11/16/1998 | 11/16/1998 | A | PART |
|
|
|
11/14/98 338 - PRESTON ###-#### WALL COVER INSP madeok to cover restroom
|
INSP - Framing/Rough-in | 11/9/1998 | 11/10/1998 | 11/10/1998 | A | FAIL |
|
|
|
11/10/98 338 - PRESTON BAKER- ###-####-2ND FLOOR BATHROOMS fail penetrat
|
INSP - Framing/Rough-in | 11/6/1998 | 11/9/1998 | 11/9/1998 | A | PART |
|
|
|
11/09/98 338 - made ok to cover the 2nd floor and the rest of the 3rd fl
|
INSP - Framing/Rough-in | 11/4/1998 | 11/4/1998 | 11/5/1998 | P | PART |
Tom Arcoraci
|
|
|
11/04/98 408 - 3RD FLOOR BATHROOM--PRESTON ###-#### ok to cover 3rd floor
|
INSP - Framing/Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 | P | PART |
|
|
|
11/03/98 338 - ok to cover east end of 4 th floor
|
INSP-Sprinkler Rough-in/Hydro | 10/27/1998 | 10/27/1998 | 10/27/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - ok on hydro test of 3rd & 4th flrs, underground,FDC,DPV,& st
|
INSP - Framing/Rough-in | 10/22/1998 | 10/23/1998 | 10/23/1998 | A | PART |
|
|
|
10/23/98 338 - COVER INSPECTION PRESTON ###-#### ok to cover parts of th
|
INSP - Wall cover | 10/19/1998 | 10/20/1998 | 10/20/1998 | A | FAIL |
|
|
|
10/20/98 338 - fire caulk putty pads not complet no cover
|
INSP - Wall cover | 10/15/1998 | 10/15/1998 | 10/15/1998 | P | PART |
|
|
|
MADE K TO COVER 4TH FLOOR WALLS BETWEEN SUITES
|
INSP - Wall cover | 10/13/1998 | 10/13/1998 | 10/13/1998 | | PART |
|
|
|
/ / 338 - MADD OK RECIEVED ENG FIX FOR RE ROUT OF STORM DRAINS
|
INSP - Framing/Rough-in | 9/29/1998 | 10/13/1998 | 10/13/1998 | A | FAIL |
|
|
|
10/13/98 338 - need eng for the holes cut in bearing/ demising walls
|
INSP - Wall cover | 10/9/1998 | 10/13/1998 | 10/13/1998 | A | PART |
Tom Arcoraci
|
|
|
10/13/98 408 - preston ###-#### done by 338
|
INSP - Framing/Rough-in | 9/29/1998 | 10/12/1998 | 10/12/1998 | A | NR |
|
|
|
10/12/98 338 - will call for insp for 10-13-98
|
INSP - Framing/Rough-in | 9/29/1998 | 10/9/1998 | 10/9/1998 | A | PART |
|
|
|
10/09/98 338 - conference on the plans review and approved plans and the
|
INSP - Framing/Rough-in | 9/29/1998 | 10/8/1998 | 10/8/1998 | A | PART |
|
|
|
10/08/98 338 - made ok to cover the 1st floor all penetrations made ok.
|
INSP - Framing/Rough-in | 9/29/1998 | 10/7/1998 | 10/7/1998 | A | FAIL |
|
|
|
10/07/98 338 - PROPER ASSYS NOT ON SITE NO INSP MADE
|
INSP - Framing/Rough-in | 9/29/1998 | 10/6/1998 | 10/6/1998 | A | NR |
|
|
|
10/06/98 338 - not ready assys were not on site inspection will not be d
|
INSP-Supply line flush | 10/6/1998 | 10/6/1998 | 10/6/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SUPPLY LINE FLUSH OK ON 4TH FLR ROUGH IN
|
INSP - Framing/Rough-in | 9/29/1998 | 10/5/1998 | 10/5/1998 | A | NR |
|
|
|
10/05/98 338 - need fire stop info prior to inspection
|
INSP - Framing/Rough-in | 9/29/1998 | 10/2/1998 | 10/2/1998 | A | FAIL |
|
|
|
subs do not have proper info not ready no insp completed
|
INSP - Framing/Rough-in | 10/2/1998 | 10/2/1998 | 10/2/1998 | | PART |
|
|
|
10/02/98 338 - MADE OK TO COVER PART OF THE 3RD FLOOR EAST END
|
INSP - Framing/Rough-in | 9/29/1998 | 10/1/1998 | 10/1/1998 | A | CANC |
Tom Arcoraci
|
|
|
bob called early and said insp could wait til tomorroe as subs were all not ready
|
INSP - Framing/Rough-in | 9/29/1998 | 9/30/1998 | 9/30/1998 | A | FAIL |
|
|
|
09/30/98 338 - not ready fire assys are not complete next not complete i
|
INSP - Framing/Rough-in | 9/30/1998 | 9/30/1998 | 9/30/1998 | P | PART |
|
|
|
09/30/98 338 - made ok to cover the suite walls in the west of the 3rd a
|
INSP - Framing/Rough-in | 9/28/1998 | 9/29/1998 | 9/29/1998 | A | FAIL |
|
|
|
09/29/98 338 - sheer wall bob ###-#### NOT REWADY FOR INSP OTHER AGENCIE
|
INSP - Wall cover | 9/24/1998 | 9/25/1998 | 9/25/1998 | A | PART |
|
|
|
09/25/98 338 - made ok for to cover the 2nd floor rooms only not hall
|
INSP-Sprinkler Rough-in/Hydro | 9/16/1998 | 9/16/1998 | 9/16/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ROUGH IN OF 2ND FLOOR OK TO COVER
|
INSP - Framing/Rough-in | 9/4/1998 | 9/8/1998 | 9/8/1998 | A | FAIL |
|
|
|
09/08/98 338 - NOT READY TO COVER C/N ISSUED FIRE ASSYS AND FIRE BLOCK A
|
INSP - Framing/Rough-in | 8/31/1998 | 8/31/1998 | 8/31/1998 | | NR |
|
|
|
08/28/98 338 - with m otto , P BAKER. B LEONARD. PLMER SUPER AND MYSELF
|
INSP - Framing/Rough-in | 8/28/1998 | 8/28/1998 | 8/28/1998 | P | NR |
|
|
|
fireproofing/bob ###-#### this is a conf had m otto on site to answer questions on the fire proofing requirements and the rated wall assys
|
INSP - Conference | 8/14/1998 | 8/14/1998 | 8/14/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - wanted underground pipe looked at, they don't have permit, c
|
INSP - Framing/Rough-in | 8/13/1998 | 8/13/1998 | 8/13/1998 | P | PART |
|
|
|
08/13/98 338 - ok to start rocking as inspected
|
INSP - Framing/Rough-in | 8/11/1998 | 8/12/1998 | 8/12/1998 | A | PART |
|
|
|
08/12/98 338 - ok to cover bob ###-####
|
INSP - Wall cover | 8/11/1998 | 8/11/1998 | 8/11/1998 | P | PART |
|
|
|
08/11/98 338 - conf with bob leonard and p baker on the use of approved
|
INSP - Wall cover | 8/7/1998 | 8/7/1998 | 8/7/1998 | P | CANC |
|
|
|
this is for a conf only no framing is to be covered
|
INSP - Wall cover | 8/7/1998 | 8/7/1998 | 8/7/1998 | | PART |
|
|
|
08/07/98 338 - bob ###-#### struc. and wall need to supply ner 200 for t
|
INSP - Framing/Rough-in | 8/4/1998 | 8/5/1998 | 8/5/1998 | P | NR |
|
|
|
08/05/98 338 - this is a conference to speak to the rated walls and fram attending Dave McKlenna, Bob Leonard, Prestom Baker and P Paine.Must rev
|
INSP - Framing/Rough-in | 8/3/1998 | 8/4/1998 | 8/4/1998 | A | NR |
|
|
|
08/04/98 338 - NR NO ONE ON JOBSITE
|
CHANGE STATUS TO (I) | | | 6/10/1998 | | |
|
|
|
|
INSP - Foundation | 6/8/1998 | 6/8/1998 | 6/8/1998 | P | PART |
|
|
|
06/08/98 338 - Preston ###-#### FOOTINGS out of time will inspect 06-09-
|
INSP - Foundation | 6/3/1998 | 6/3/1998 | 6/3/1998 | P | PART |
|
|
|
06/03/98 338 - MADE OK WITH SP INSP APPROVAL R-BAR IS PLACED
|
INSP - Foundation | 6/1/1998 | 6/2/1998 | 6/2/1998 | A | PART |
|
|
|
06/02/98 338 - made ok with sp insp for the west end only sp insp for th
|
Receive PAYMENT IN FULL PRINT | | | 6/1/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/1998 | | PASS |
|
|
|
FEES RECEIVED FOR RESUBMITTALS PLANS TAKEN TO FRONT DESK. MLO
|
INSP - Foundation | 5/27/1998 | 5/28/1998 | 5/28/1998 | A | PART |
|
|
|
AROUND 12:00-PRESTON ###-#### ok to pour only south and north walls
|
Plan assigned to (MLO) | 5/4/1998 | | 5/28/1998 | | PASS |
Mike Otto
|
|
|
resubmittals for changes to approved permit submitted 05\04\98.
|
Plan Reviewer's activity | | | 5/28/1998 | | PASS |
|
|
|
FAX SENT TO ARCHITECT WITH COPY OF INVOICE OF FEES DUE. ARCHITECT INFORMED THAT FEES TO BE PAID PRIOR TO APPROVED MODFICATIONS BEING RELEASED.
|
Routing - PLAN CHECK | 5/27/1998 | | 5/28/1998 | | PASS |
|
|
|
REVIEW OF RESUBMITTALS COMPLETED. MLO
|
Telephone call | | | 5/28/1998 | | PASS |
|
|
|
CONTACTED PRESTON BAKER ABOUT RESUBMITTED PLANS AND FEES DUE. AMOUNT DUE IS 1332.50 WHICH WAS RELAYED TO BAKER. ALSO INFORMED BAKER THAT MODIFICATION FORM NEEDS TO BE FILLED OUT AND SIGNED AND THAT PLANS COULD NOT BE RELEASED UNTIL FEES DUE ARE PAID IN FULL. MLO
|
Telephone call | | | 5/27/1998 | | PEND |
|
|
|
PUT IN PHONE CALL TO KEITH JONES TO FIND OUT FEE DUE FOR ADDITIONAL REVIEW. HE SAID IT WOULD GET BACK TO ME IN A DAY OR SO. PLANS ON HOLD PENDING OUTSIDE ENGINEERING FEE AMOUNT. MLO
|
Routing Off Site - STRUCTURAL | 5/18/1998 | | 5/27/1998 | | PASS |
|
|
|
CORRECTIONS BY ATTWOOD-HINZMAN-JONES VERIFIED BY MLO.
|
INSP - Concrete | 5/18/1998 | 5/19/1998 | 5/19/1998 | P | PART |
|
|
|
made ok with sp insp approval
|
Plan resubmittals received | | | 5/18/1998 | | PEND |
|
|
|
recieved resubmittals from Wieser Architects forwarded same to Mike O
|
Routing Off Site - STRUCTURAL | 5/7/1998 | | 5/13/1998 | | FAIL |
|
|
|
SENT RESUB TO KEITH JONES AT MIKE OTTO'S REQUEST.
|
Plan Reviewer's activity | | | 5/13/1998 | | PEND |
|
|
|
CHECKED WITH TEMPRA WILSON, PLANNING AND NO REVIEW REQUIRED FOR EXTERIOR CHANGES AT POOL HOUSE BREEEZEWAY AND SPANDREL GLASS IN FRONT AND REAR OF HOTEL AS SHOWN ON RESUBMITTALS DATED 5-4-98. MLO
|
Plan resubmittals requested | | | 5/13/1998 | | FAIL |
|
|
|
CORRECTIONS FORM THE CONSULTING ENGINEER HAVE BEEN RECEIVED AND FORWARDED ON TO THE ARCHITECT. MLO
|
INSP - Conference | 5/12/1998 | 5/12/1998 | 5/12/1998 | | PART |
|
|
|
/ / 338 - WITH OWNERS REP PROJECT SUPER AND SP INSP
|
Routing - PLAN CHECK | 5/4/1998 | | 5/8/1998 | | PEND |
|
|
|
|
INSP - Foundation | 5/7/1998 | 5/7/1998 | 5/7/1998 | P | PART |
|
|
|
05/07/98 338 - made ok to pour south wall 100 ft. +-
|
Plan resubmittals received | | | 5/4/1998 | | |
|
|
|
RECEIVED RESUBMITTALS AND GIVEN TO MIKE O.
|
(F) Reprint permit | | | 4/2/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/1/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/30/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/30/1998 | | |
|
|
|
|
Telephone call | | | 3/30/1998 | | |
|
|
|
called lafe feller gave him $ amount
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/1998 | | PASS |
|
|
|
|
Plan assigned to (M_O) | 9/23/1997 | | 3/27/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/23/1998 | | 3/24/1998 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 9/2/1997 | | 3/24/1998 | | PASS |
|
|
|
PACKAGE #4 CONTACTED CLINTON YAKA AT ###-#### TO TAKE PLANS OUT TO ACHD. ACHD FEES PAID RECEIPT # 98-0973 DAR 3/24/98 DAR
|
Routing - PUBLIC WORKS | 2/18/1998 | | 2/20/1998 | | FAIL |
|
|
|
PACKAGE #2 REQUIRES STREET LIGHT PLAN
|
Plan resubmittals received | | | 2/12/1998 | | |
|
|
|
RECEIVED 3 COPIES OF STAMPED DRAWINGS. ROUTED TO MIKE O.
|
Plan resubmittals received | | | 2/11/1998 | | FAIL |
|
|
|
RECEIVED 2 COPIES OF BLUELINE SET - CHANGES TO AMERISUITES HOTEL 1 COPY LETTER CONTACTED LAFE FELLER TO LET HIM KNOW THAT THE PLANS NEED TO BE STAMPED AND SIGNED.
|
Routing - PLAN CHECK | 1/29/1998 | | 2/3/1998 | | FAIL |
|
|
|
CORRECTIONS ON REUSBMITTAL NOT COMPLETED. COMMENTS FAXED AND MAILED TO ARCHITECT. MO
|
Routing Off Site - STRUCTURAL | 12/5/1997 | | 2/3/1998 | | PASS |
|
|
|
RESUBS KEITH JONES HAD ONE ADDITIONAL COMMENT WHICH HAS BEEN MAILED TO THE ARCHITECT. MO
|
Routing - PLUMBING | 1/30/1998 | | 1/30/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/30/1998 | | PEND |
|
|
|
PLUMBING RESUBS RECEIVED.
|
Plan resubmittals received | | | 1/29/1998 | | |
|
|
|
RECEIVED 2 COPIES OF PARTIAL SET (BUILDING REVIEW SET) 2 COPIES OF PARTIAL SET (PLUMBING REVIEW SET) RECEIVED 1 COPY OF LETTER TO MIKE O. 1 CC OF LETTER MR. VARNER CONCERNING PLUMBING PLAN REVIEW OF 1-2-98. ROUTED ALL TO MIKE O. KMM
|
Plan resubmittals received | | | 1/26/1998 | | PASS |
|
|
|
SEE ACTION A103: RECEIVED THE ADDITIONAL REVISED SHEETS G2.3,A4.3,A5.3, AND COVER SHEET. ROUTED TO MIKE OTTO
|
Plan resubmittals received | | | 1/23/1998 | | HOLD |
|
|
|
RECEIVED ONE COPY OF UPDATED PLANS AND 2 COPIES OF RESPONSE LETTER. CONTACTED KEVIN OF WIESER ARCH. AND TOLD HIM I NEED 2 COPIES OF THE PLANS. HE WILL HAVE THEM TO US BY 1-26-98. KMM
|
SUPER- Supervisor's review | 1/5/1999 | 1/5/1998 | 1/5/1998 | | |
|
|
|
request for temp. w/o pool being completed. i told mec contractor to write letter with time frames, no use of that area.
|
Routing - FIRE | 12/15/1997 | | 12/30/1997 | | PASS |
|
|
|
PLANS BACK TO BLDG. PLAN REVIEW.
|
Plan resubmittals requested | | | 12/12/1997 | | FAIL |
|
|
|
CORRECTIONS ON RESUBMITTALS SENT TO ARCHITECT. MO
|
Routing - PLAN CHECK | 12/5/1997 | | 12/12/1997 | | FAIL |
|
|
|
CORRECTIONS ON RESUBMITTAL MAILED TO ARCHITECT 12-12-97.MO
|
Plan resubmittals received | | | 12/5/1997 | | FAIL |
|
|
|
|
90 day tracking............. | | 8/28/1997 | 11/26/1997 | | |
|
|
|
|
Plan Reviewer's activity | | | 11/17/1997 | | FAIL |
|
|
|
LETTER SENT TO LAFE FELLER CONCERING USE OF FIRE RATED WOOD IN EXTERIOR WALLS OF TYPE III-1HR IN COMBINATION WITH E.I.F.S. SYSTEMS. MO
|
Routing - FIRE | 10/14/1997 | | 10/29/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Plan resubmittals requested | | | 10/13/1997 | | FAIL |
|
|
|
CORRECTIONS MAIELD TO ARCHITECT. MO
|
Routing - PLAN CHECK | 9/23/1997 | | 10/13/1997 | | FAIL |
|
|
|
CORRECTIONS MAILED TO ARCHITECT. MO
|
Routing Off Site - STRUCTURAL | 9/9/1997 | | 10/3/1997 | | FAIL |
|
|
|
PACKAGE #3 ON HOLD UNTIL I RECEIVE A THIRD SET OF PLANS FROM CLINTON. I NOTIFIED HIM OF THIS NEED. KMM 9-9-97 RECEIVED THIRD SET. CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN, AND JONES. CORRECITIONS MAILED WITH BUILDING CORRECTIONS 10-13-97. MO
|
Routing - PLANNING | 9/24/1997 | | 9/26/1997 | | PASS |
|
|
|
PACKAGE #2 CU-93-96 & DRH97-0008. APPROVED BY TKW & RC.
|
Routing - PUBLIC WORKS | 9/10/1997 | | 9/24/1997 | | FAIL |
|
|
|
PACKAGE #2 REQUIRES DRAINAGE PLAN REVISIONS. BM RREQUIRES STREET LIGHT PLAN. BILL COLSEN
|
Plan assigned to (RGG) | 9/2/1997 | | 9/23/1997 | | PASS |
|
|
|
|
Routing - PLUMBING | 9/15/1997 | | 9/16/1997 | | FAIL |
|
|
|
PACKAGE #1 PROVIDE SITE DRAWINGS INDICATING MAIN WATER AND SANITARY SEWER SOURCE -LOCATION - SIZE.
|
Routing - ELECTRICAL | 9/2/1997 | | 9/15/1997 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW FIELD VERIFY
|
Routing Off Site - C.D.H | 9/2/1997 | | 9/9/1997 | | PASS |
|
|
|
PACKAGE #2 CONTACTED CLINTON YAKA AT ###-#### TO TAKE PLANS OUT TO CDH.
|
Received Certificate of Value | | | 9/2/1997 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/2/1997 | | PASS |
|
|
|
|
Routing - MECHANICAL | 9/2/1997 | | 9/2/1997 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW FIELD VERIFY.
|
Plan assigned to (MYS) | 8/28/1997 | | 9/2/1997 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 9/2/1997 | | PASS |
|
|
|
AM HOLDING PACKAGE #3 (WHICH REQUIRES AN ADDITIONAL SET), UNTIL I RECEIVE A THIRD SET. CONTACTED CLINTON YAKA OF THIS NEED. KMM
|
Application received | | | 8/28/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/28/1997 | | |
|
|
|
|
Routing - PLUMBING | 12/31/1997 | | 1/5/1997 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 2/20/1998 | | 2/23/1938 | | PASS |
|
|
|
|
SUPER- Supervisor's review | 6/18/1998 | | | | D |
|
|
|
pre constuction meeting. perry ran show plan review notes reviewed subs their, inspectors their. well done, 75% of plan review notes were ada requirments and should be on the approved plan not just notes. policy is inspectors are to do exactly what the plan has for ada. The architect is responsible and plan review is in sole charge of checking against the ada documents. Questions on ada were to be refered to plan review and not answored by inspectors in the field.
|