INSP - Letter of compliance | 4/15/1998 | 4/15/1998 | 4/15/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14361. Note:Garage wing walls still require sheet rock on inside, contractor will apply as none of the garages are left unfinished. Rock was not yet done do to the wing wall engineering which is now completed.
|
INSP - Final | 4/15/1998 | 4/15/1998 | 4/15/1998 | P | PASS |
Russ Owen
|
|
|
04/15/98 407 - Scheduled by Hello!. Contact phone is [3857310].
|
INSP - Letter of compliance | 4/15/1998 | 4/15/1998 | 4/15/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14361. Note:Garage wing walls still require sheet rock on inside, contractor will apply as none of the garages are left unfinished. Rock was not yet done do to the wing wall engineering which is now completed.
|
INSP - Framing/Rough-in | 4/14/1998 | 4/14/1998 | 4/14/1998 | P | PASS |
Russ Owen
|
|
|
04/14/98 407 - hold downs have been installed in the garage.
|
INSP - Set-back | 1/13/1998 | 1/13/1998 | 1/13/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - hold downs added to rear wall,still need garage hd's.
|
INSP - Energy code compliance | 1/6/1998 | 1/7/1998 | 1/7/1998 | A | PASS |
Russ Owen
|
|
|
still have a framing correction to complete.
|
INSP - Energy code compliance | 1/6/1998 | 1/6/1998 | 1/7/1998 | P | NR |
Russ Owen
|
|
|
01/06/98 407 - not ready .
|
INSP - Framing/Rough-in | 12/30/1997 | 12/31/1997 | 1/2/1998 | P | FAIL |
Russ Owen
|
|
|
12/31/97 407 - left correction.lo!.
|
Issue PAID IN FULL permit | | | 10/14/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/1997 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/23/1997 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 9/23/1997 | | |
|
|
|
|
Plan assigned to (DJO) | 9/8/1997 | | 9/23/1997 | | PASS |
Dan Overy
|
|
|
09/23/97 09:15:34 DJO - this action updated by action script from <<>> in Case No. BLD97-2626
|
Plans ACCEPTED BY PLAN CHECK | | | 9/22/1997 | | PASS |
|
|
|
|
Routing - PLANNING | 9/10/1997 | | 9/10/1997 | | PASS |
|
|
|
STEVE BROUGHT IN NEW PLANS, FOOT PRINT OF HOUSE HAS CHANGED APPROVED BY GRH.
|
Routing - PLAN CHECK | 9/9/1997 | | 9/10/1997 | | CANC |
|
|
|
|
Routing - PLANNING | 9/9/1997 | | 9/9/1997 | | PASS |
|
|
|
Approved by: GRH
|
Routing - PUBLIC WORKS | 9/8/1997 | | 9/9/1997 | | PASS |
|
|
|
|
Application received | | | 9/8/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 9/10/1997 | | | | PEND |
|
|
|
|