Case Summary (BLD) | | | 10/1/2002 | | |
|
|
|
|
Case Summary (BLD) | | | 10/1/2002 | | |
|
|
|
|
Letter of compliance | | | 1/23/1998 | | PASS |
|
|
|
Letter of Compliance #13844 issued 1-23-98.
|
INSP - Final | 1/15/1998 | 1/15/1998 | 1/15/1998 | P | PART |
Jim Sly
|
|
|
01/15/98 316 - Temp Occ...Health and Welfare...Needs signature for code
|
INSP - Final | 1/13/1998 | 1/15/1998 | 1/15/1998 | A | FAIL |
Jim Sly
|
|
|
01/14/98 316 - Need signature for electrical....
|
INSP-Final Inspection | 1/9/1998 | 1/14/1998 | 1/14/1998 | A | PASS |
Joe Tawney
|
|
|
01/14/98 406 - ###-#### ROBERT REINSP OK FOR PERM OCC ADDRESS IS 1720 WESTGATE
|
INSP - Final | 12/24/1997 | 12/26/1997 | 12/26/1997 | A | CANC |
Tom Arcoraci
|
|
|
HE DIDN'T IF YOU WERE GOING TO MAKE IT WED PM OCC CARD NOT COMPLETE CONTRACTOR WILL RE CALL FOR FINAL
|
INSP - Final | 12/24/1997 | 12/24/1997 | 12/24/1997 | P | NH |
Jim Sly
|
|
|
12/24/97 316 - HEALTH AND WELFARE No one on site...4:30 Xmas eve..left n
|
INSP-Final Inspection | 12/23/1997 | 12/24/1997 | 12/24/1997 | A | PASS |
Joe Tawney
|
|
|
12/24/97 406 - HEALTH AND WELFARE FINAL OK FOR TEMP OCC
|
INSP-Alarm Testing | 12/18/1997 | 12/22/1997 | 12/22/1997 | P | NR |
Joe Tawney
|
|
|
12/22/97 406 - ALARM TEST NOT READY APPROVED SUBMITTALS NOT ON SITE
|
INSP - Final | 12/19/1997 | 12/19/1997 | 12/21/1997 | P | PART |
Jim Sly
|
|
|
12/21/97 316 - Conference with superintendent for requirements for final
|
90 day tracking............. | | 9/22/1997 | 12/21/1997 | | |
|
|
|
|
INSP - Final | 12/19/1997 | 12/19/1997 | 12/19/1997 | | NR |
Jim Sly
|
|
|
12/19/97 316 - Conference with superintendant for requirements for final
|
INSP - Framing/Rough-in | 12/10/1997 | 12/11/1997 | 12/11/1997 | A | PART |
Jim Sly
|
|
|
12/10/97 316 - Ceiling grid inspection...2 areas to west OK (areas sep b
|
INSP - Energy code compliance | 12/4/1997 | 12/4/1997 | 12/4/1997 | P | PASS |
Jim Sly
|
|
|
Insulation OK entire bldg.
|
INSP - Framing/Rough-in | 12/4/1997 | 12/4/1997 | 12/4/1997 | | PART |
Jim Sly
|
|
|
/ / 316 - Framing OK far East end and including 1hr wall...
|
INSP - Framing/Rough-in | 12/4/1997 | 12/4/1997 | 12/4/1997 | P | PART |
Jim Sly
|
|
|
health and welfare Far East end OK frame.
|
INSP - Carpentry | 12/3/1997 | 12/3/1997 | 12/3/1997 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N...Arch to submit detail for duct penitr @ 2hr wall.
|
INSP - Framing/Rough-in | 12/1/1997 | 12/2/1997 | 12/2/1997 | A | PART |
Jim Sly
|
|
|
12/01/97 316 - Looked at framing on far East end.....OK
|
Additional plans submitted | | | 12/1/1997 | | PASS |
|
|
|
Plan changes submitted to Jim Sly for review, he gave them to me for review. Relocation of some walls to create a file room and smaller office spaces, added two doors. rmh
|
INSP - Framing/Rough-in | 11/26/1997 | 11/28/1997 | 11/28/1997 | A | PART |
Tom Arcoraci
|
|
|
WESTGATE PHASE 11 SHELL AND CORE
|
INSP-Final Inspection | 11/21/1997 | 11/21/1997 | 11/21/1997 | | PASS |
Joe Tawney
|
|
|
11/21/97 406 - CONFERENCE ON LOCATION OF FIRE EXT ALSO OK TO COVER ON CE
|
INSP - Framing/Rough-in | 11/18/1997 | 11/19/1997 | 11/19/1997 | A | PART |
Jim Sly
|
|
|
11/18/97 316 - Inspection of framing section next to West end (section).
|
INSP - Framing/Rough-in | 11/14/1997 | 11/14/1997 | 11/14/1997 | P | PART |
Jim Sly
|
|
|
11/14/97 316 - Interior walls ..far West section OK...
|
INSP - Energy code compliance | 11/14/1997 | 11/14/1997 | 11/14/1997 | P | PART |
Jim Sly
|
|
|
11/14/97 316 - Far West Section Ok
|
INSP - Framing/Rough-in | 11/12/1997 | 11/13/1997 | 11/13/1997 | A | FAIL |
Jim Sly
|
|
|
11/12/97 316 - FIRE WALL AND METAL STUDS Need fire smoke dampers...2hr w
|
INSP - Conference | 11/7/1997 | 11/10/1997 | 11/10/1997 | A | PASS |
Jim Sly
|
|
|
11/07/97 316 - Conference with Gene from Petra - fire walls, etc. OK : )
|
(F) Reprint permit | | | 10/28/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/28/1997 | | |
|
|
|
|
Print Occupancy Form | | | 10/27/1997 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/27/1997 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/1997 | | PASS |
|
|
|
NOTE: ELECTRICAL AND MECHANICAL TO BE FIELD VERIFIED.
|
Inspection Record Card- Bld | | | 10/27/1997 | | |
|
|
|
|
Meeting | | | 10/27/1997 | | |
|
|
|
Met with Mark Knowles and Floyd Varley, discussed the requirements of the Magnetic hold down devices, smoke and fire damper requirements and Hardware requirements for the doors in the existing shell building. Made note to the plan sheets to what will be required.
|
Routing - FIRE | 10/21/1997 | | 10/27/1997 | | PASS |
|
|
|
|
Plan assigned to (R_H) | 10/1/1997 | | 10/27/1997 | | PASS |
|
|
|
10/27/97 14:14:47 R_H - this action updated by action script from <<>> in Case No. BLD97-2777
|
Plan Reviewer's activity | | | 10/21/1997 | | FAIL |
|
|
|
Faxed corrections to Mark Knowles Architect. Needed fire smoke dampers, occupancy separation walls & detail of toof truss penetration through rated walls. Routed to fire department.
|
Routing - PLAN CHECK | 10/14/1997 | | 10/21/1997 | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/13/1997 | | 10/14/1997 | | PASS |
|
|
|
Had to be rerouted due to changes in the resubmittals received on 10/7/97.
|
Routing - PLAN CHECK | 10/5/1997 | | 10/13/1997 | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/2/1997 | | 10/3/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 9/22/1997 | | 10/1/1997 | | |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 10/1/1997 | | |
|
|
|
Route to PUBLIC WORKS then to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT.
|
Recd Pcfee & Taken To Pln CK | | | 9/22/1997 | | |
|
|
|
|
Application received | | | 9/22/1997 | | |
|
|
|
|