Permanent occupancy | | | 8/18/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7355 issued 8-18-98 to McGrath's Publick Fish House #99.
|
Permanent Occupancy | | 8/17/1998 | 8/17/1998 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/5/1998 | 8/5/1998 | 8/5/1998 | P | PASS |
Joe Tawney
|
|
|
08/05/98 406 - ###-#### please call he will need to meet you out there REINSP OK FOR PERM OCC
|
Code Occupancy Approval | | | 6/22/1998 | | PASS |
|
|
|
Bonded for temporary - $1,600 for remaining landscaping. Inspected for Final 6/22/98 - Meets compliance with DRH97-0153-PASS
|
Temporary occupancy | | | 6/19/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3636 issued 6-19-98 to McGrath's Fish House.
|
INSP-Final Inspection | 6/18/1998 | 6/18/1998 | 6/18/1998 | P | PART |
Joe Tawney
|
|
|
06/18/98 406 - final jim ###-#### REINSP OK FOR TEMP OCC ADDRESS RISER ROOM AIR BALANCE REPORT
|
INSP - Final | 6/18/1998 | 6/18/1998 | 6/18/1998 | P | PART |
|
|
|
06/18/98 338 - made ok for temp occ, life safety and plmg ele are temp.
|
INSP-Final Inspection | 6/16/1998 | 6/16/1998 | 6/16/1998 | P | FAIL |
Joe Tawney
|
|
|
06/16/98 406 - Jim ###-#### REINSP FAIL FEW ITEMS LEFT FOR TEMP AND FINAL
|
INSP-Final Inspection | 6/11/1998 | 6/12/1998 | 6/12/1998 | A | FAIL |
Joe Tawney
|
|
|
06/12/98 406 - temp occ. arround 11 a.m. ###-####/ FINAL FAIL ANSUL SYSTEM TESTS EMERG AND EXIT LIGHTS
|
INSP-Sprinkler Rough-in/Hydro | 6/11/1998 | 6/11/1998 | 6/11/1998 | P | FAIL |
Joe Tawney
|
|
|
06/11/98 406 - sprinkler ###-#### jim FINAL FAIL ALARM SYSTEM EXIT AND EMERG LIGHTS
|
INSP - Framing/Rough-in | 6/4/1998 | 6/5/1998 | 6/5/1998 | A | PART |
|
|
|
06/05/98 338 - final on ceiling/ ###-#### jim ceiling grid ok to drop in the tiles willcheck slack wires again at the
|
INSP-Sprinkler Rough-in/Hydro | 6/3/1998 | 6/3/1998 | 6/3/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ABOVE GROUND HYDRO TEST
|
INSP-Conference | 6/1/1998 | 6/1/1998 | 6/1/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF ON TAMPER SWITCHES FOR ANTI FREEZE LOOP VLVS
|
INSP-Conference | 5/27/1998 | 5/27/1998 | 5/27/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - PROFIT CONFERENCE WANT OCC BY 6/19/98
|
INSP - Final | 5/20/1998 | 5/21/1998 | 5/21/1998 | A | PASS |
|
|
|
OK TO COVER THE SHAFTS
|
INSP - Framing/Rough-in | 5/19/1998 | 5/20/1998 | 5/20/1998 | A | PART |
|
|
|
grease duct chase ###-#### they are to recall whith verbal correction repairs
|
Plan resubmittals received | | | 5/20/1998 | | PEND |
|
|
|
RECEIVED RESUBS FROM DAVE BECK. FORWARDED TO PW AND PLUMBING.DAR
|
INSP - Framing/Rough-in | 5/13/1998 | 5/14/1998 | 5/15/1998 | A | PASS |
|
|
|
05/15/98 338 - grease chase ###-#### FAIL BAD CLEARANCES AND POOR WORKM
|
INSP - Framing/Rough-in | 4/20/1998 | 4/21/1998 | 4/21/1998 | A | PART |
|
|
|
04/21/98 338 - approved and posted resubmittals for the duct shaft attac
|
INSP - Framing/Rough-in | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | PART |
|
|
|
made ok to insulate ext walls only
|
INSP-Supply line flush | 3/25/1998 | 3/26/1998 | 3/26/1998 | A | PASS |
Joe Tawney
|
|
|
03/26/98 406 - 8:30 AS PER 406-GREGG ###-#### DIGITIAL OK ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 3/17/1998 | 3/18/1998 | 3/18/1998 | P | PART |
|
|
|
03/18/98 338 - sheer wall roof sheathing nailing harold ###-####
|
(F) Reprint permit | | | 1/12/1998 | | |
|
|
|
|
(F) Reprint permit | | | 1/12/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/9/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/9/1998 | | |
|
|
|
|
Print Occupancy Form | | | 1/9/1998 | | |
|
|
|
|
(F) Reprint permit | | | 1/9/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/1998 | | PASS |
|
|
|
|
Plan assigned to (JML) | 11/14/1997 | | 1/9/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/8/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 1/8/1998 | | PEND |
|
|
|
I faxed to Scott Beck a cover sheet informing him that all departments had approved the project for issuing a permit except for ACHD. We need verification of fees paid and approval from ACHD.
|
Plan Reviewer's activity | | | 1/8/1998 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 1/8/1998 | | 1/8/1998 | | PASS |
|
|
|
received ACHD receipt # 98-0542
|
Routing Off Site - STRUCTURAL | 12/19/1997 | | 12/31/1997 | | PASS |
|
|
|
RESUBMITTALS RECEIVED AND SENT OUT TO ATWOOD HINZMAN AND JONES VIA PDQ SENT THREE SETS OUT. RESUBMITTALS APPROVED 12-31-97 BY AHJ
|
90 day tracking............. | | 9/29/1997 | 12/28/1997 | | PEND |
|
|
|
|
Plan resubmittals received | | | 12/22/1997 | | PEND |
|
|
|
RESPONSE TO STRUCTURAL NON-STRUCTURAL AND MECH PLAN REVIEWS RECIEVED (PLANS CALC'S 3-EACH & LETTER)
|
Routing - FIRE | 12/4/1997 | | 12/12/1997 | | FAIL |
|
|
|
PACKAGE #1 APPROVED FOR GRADING ONLY. BLD97-3295
|
Routing - PLUMBING | 12/3/1997 | | 12/4/1997 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 12/2/1997 | | PEND |
|
|
|
The review is completed, a response and corrections are required from the architect. I will send to fire for review.
|
Meeting | | | 12/1/1997 | | PEND |
|
|
|
Meet with Scott Beck in our office and gave him a copy of my plan review comments minus the respose from the structural consultant. I told him I would contact the consultant to see where thier response was. I did so and found out they had responded earlier but we had no record of it so they faxed me a copy. I will transmit a copy of the fax to Scott Bec , the architect.
|
Routing - ELECTRICAL | 11/14/1997 | | 11/21/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 11/18/1997 | | 11/18/1997 | | PASS |
|
|
|
|
Plan assigned to (RGG) | 10/6/1997 | | 11/14/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/13/1997 | | 11/13/1997 | | FAIL |
|
|
|
|
Routing - PLANNING | 11/7/1997 | | 11/12/1997 | | PASS |
|
|
|
PACKAGE #1 X-REF: DRH97-0022,DRH97-0153. APPROVED BY MGS.
|
Routing - PLUMBING | 11/4/1997 | | 11/7/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Routing Off Site - STRUCTURAL | 10/6/1997 | | 11/6/1997 | | FAIL |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN JONES RECEIVED CORRECTIONS AND REQUESTING KNEW PLANS TO BE SUBMITTED FOR FUTHER REVEIW ABY ATWOOD HINZMAN AND JONES.
|
Plan resubmittals received | | | 11/3/1997 | | |
|
|
|
SHEETS; AO.O, A4.3, A5.1, A5.2, A7.1, A8.2, A8.3, P2.1, E3.2, E5.1, AND REVISED PROJECT MANUELS. (3 SETS OF SHEETS AND 2 MANUELS.)
|
Routing - PUBLIC WORKS | 10/28/1997 | | 10/31/1997 | | FAIL |
|
|
|
PACKAGE #1 REQUIRES DRAINAGE PLAN (MORE COPIES) BM INCOMPLETE FIXTURE INFORMATION FOR BAR AREA,ARDEN BAUMAN
|
Routing Off Site - A.C.H.D | 10/6/1997 | | 10/10/1997 | | PASS |
|
|
|
PACKAGE #2 CONTACTED BRIAN HUFFAKER ###-#### TO TAKE PLANS OUT TO ACHD FEES DUE FEES PAID 1-8-98
|
Plans ACCEPTED BY PLAN CHECK | | | 10/6/1997 | | PASS |
|
|
|
REQUIRES SITE PLAN SHEETS. CONTACTED SCOTT BECK OF THIS NEED. I AM GOING TO STILL ROUTE TO CDH FIRST,PW, PLUMB. THEN P.& Z.
|
Plan routing begun/NEW & ADDTN | | | 10/6/1997 | | PASS |
|
|
|
|
Routing - MECHANICAL | 10/6/1997 | | 10/6/1997 | | PASS |
|
|
|
NO REVEIW FIELD VERIFY PACKAGE #1
|
Routing - PLAN CHECK | 9/29/1997 | | 9/29/1997 | | PEND |
|
|
|
|
Received Certificate of Value | | | 9/29/1997 | | PASS |
|
|
|
|
Application received | | | 9/29/1997 | | |
|
|
|
|
Plan assigned to (MYS) | 9/29/1997 | | 9/29/1997 | | |
Marlene Southard
|
|
|
|
Routing - FIRE | 1/5/1998 | | 1/6/1997 | | PASS |
|
|
|
|
Routing Off Site - C.D.H | 10/6/1997 | | 10/28/1907 | | PASS |
|
|
|
PACKAGE #1 CONTACTED BRIAN HUFFAKER AT ###-#### TO TAKE PLANS OUT TO CDH
|