Case Summary (BLD) | | | 4/25/2019 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/12/1997 | | 12/18/1998 | | |
|
|
|
RESUBS OUT TO ATWOOD, HINZMAN, JONES.
|
Receive PAYMENT IN FULL PRINT | | | 12/17/1998 | | |
|
|
|
|
Permanent occupancy | | | 12/17/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7557 issued 12-17-98 to Ameritel Inns.
|
INSP - Final | 12/16/1998 | 12/16/1998 | 12/16/1998 | | PASS |
|
|
|
12/16/98 338 - made ok for perm other agencies approved
|
INSP-Final Inspection | 12/16/1998 | 12/16/1998 | 12/16/1998 | | PASS |
Joe Tawney
|
|
|
12/16/98 406 - CLAY ###-#### FN FIRE INSP REINSP OK FOR PERM OCC
|
Permanent Occupancy | | 12/16/1998 | 12/16/1998 | | DONE |
|
|
|
|
INSP-Final Inspection | 10/28/1998 | 10/29/1998 | 11/29/1998 | P | FAIL |
Joe Tawney
|
|
|
10/29/98 406 - CLAY ###-#### 1:00 ? PER JOE FINAL ALARM TEST FAIL NUMBER OF ITEMS NEED CORRECTING
|
Temporary occupancy | | | 11/4/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3731 issued 11-4-98 to the Ameritel Inns.
|
INSP-Final Inspection | 11/2/1998 | 11/3/1998 | 11/3/1998 | A | PART |
Joe Tawney
|
|
|
11/03/98 406 - CLAY- ###-#### REINSP OK FOR TEMP OCC
|
INSP - Final | 11/2/1998 | 11/2/1998 | 11/3/1998 | P | FAIL |
|
|
|
11/03/98 338 - ###-####- CLAY FN OCC INSP
|
INSP-Final Inspection | 11/2/1998 | 11/2/1998 | 11/2/1998 | P | FAIL |
Joe Tawney
|
|
|
11/02/98 406 - CLAY ###-#### FIRE FN-ALARM SYS INSP REINSP FAIL 24 ITEM C/N ISSUED
|
INSP-Final Inspection | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | CANC |
|
|
|
CLAY ###-#### alarms were not ready - try again on monday
|
Code Occupancy Approval | | | 10/30/1998 | | FAIL |
|
|
|
Landscaping and above-grade H/C parking signs not done - Bonded $20,000 + 10% $22,000.00 - Cashiers Check for Temporary. (cannot get sod/still need some striping in parking lot to the west of structure) 2/5/99. N/R - they have not been able to sod - they have barked in all of the areas they could not sod for appearances sake.
|
INSP-Sprinkler Rough-in/Hydro | 10/23/1998 | 10/26/1998 | 10/26/1998 | A | PART |
Joe Tawney
|
|
|
10/26/98 406 - clay ###-#### OK ON HYDRO TEST FOR 1ST AND 2ND FLOORS
|
INSP-Final Inspection | 10/23/1998 | 10/26/1998 | 10/26/1998 | A | FAIL |
Joe Tawney
|
|
|
10/26/98 406 - clay ###-#### final fire REINSP OF SPKLR SYSTEM FAIL FEW ITEMS LEFT
|
INSP-Final Inspection | 10/21/1998 | 10/22/1998 | 10/23/1998 | P | FAIL |
Joe Tawney
|
|
|
10/22/98 406 - CLAY -###-#### -FN FIRE-HYDRO-STATIC 1 & 2-STAND PIPE INS HYDRO TEST 1 & 2 FLRS FAIL 1ST FLR ROUGH IN FAIL BRACING NOT COMPLETE
|
INSP-Final Inspection | 10/20/1998 | 10/20/1998 | 10/20/1998 | P | FAIL |
Joe Tawney
|
|
|
10/20/98 406 - clay-###-####-ROOM 417 -2,3, 4TH VENDING STORAGE ROOM REINSP 3RD & 4TH FLRS FAIL BRACING SPKLR HDS STANDPIPE CAPS
|
INSP-Final Inspection | 10/19/1998 | 10/19/1998 | 10/19/1998 | P | FAIL |
Joe Tawney
|
|
|
10/19/98 406 - CLAY ###-#### FINAL ON 3RD AND 4TH REINSP 3RD & 4TH FLOORS FAIL ALL CORRECTION ITEMS NOT COMPLETED
|
INSP-Final Inspection | 10/16/1998 | 10/16/1998 | 10/16/1998 | | PART |
Joe Tawney
|
|
|
10/16/98 406 - CLAY ###-#### FINAL SPKLR INSP 3RD & 4TH FLRS FAIL OK ON HYDRO TEST 3RD & 4TH FLRS ì
|
INSP-Final Inspection | 10/14/1998 | 10/15/1998 | 10/15/1998 | P | CANC |
Joe Tawney
|
|
|
10/15/98 406 - CLAY ###-#### 3RD AND 4TH FLOOR HYDRO AND FINAL CANCELLED
|
INSP-Conference | 8/27/1998 | 8/27/1998 | 8/27/1998 | P | PART |
Joe Tawney
|
|
|
08/27/98 406 - charlie ###-#### CONF ON PROJ BEAM DETECTOR NO INFO AVAIL TO VERIFY LOCATION
|
INSP-Sprinkler Rough-in/Hydro | 8/10/1998 | 8/10/1998 | 8/10/1998 | P | PART |
Joe Tawney
|
|
|
08/10/98 406 - clay ###-#### OK ON UNDERGROUND FLUSH ì
|
INSP-Sprinkler Rough-in/Hydro | 7/30/1998 | 7/30/1998 | 7/30/1998 | A | PART |
Joe Tawney
|
|
|
07/30/98 406 - clay ###-#### OK ON ROUGH IN OF SPKLR SYSTEM IN CENTER AREA OF 1ST FLOOR
|
INSP - Framing/Rough-in | 7/22/1998 | 7/22/1998 | 7/23/1998 | P | PART |
|
|
|
07/22/98 338 - clay ###-#### for fr where is clay no answer at the conta
|
INSP-Final Inspection | 6/24/1998 | 6/25/1998 | 6/25/1998 | P | PART |
Joe Tawney
|
|
|
06/25/98 406 - clay ###-#### OK ROUGH IN FOR NW WING 4TH FLR EXC JACUZZI SUITES ì
|
INSP - Conference | 6/24/1998 | 6/24/1998 | 6/24/1998 | | NR |
Carl Dependahl
|
|
|
/ / 340 - unable to contact; no name or ph#
|
INSP-Conference | 5/20/1998 | 6/24/1998 | 6/24/1998 | P | NR |
Carl Dependahl
|
|
|
AS PER 338; no name, unable to contact.
|
INSP - Framing/Rough-in | 6/22/1998 | 6/22/1998 | 6/22/1998 | P | PASS |
|
|
|
06/22/98 338 - clay ###-#### MADE OK TO CONTINUE WITH THE 4TH FLOOR IN THE GUEST ROOMS ONLY
|
INSP-Conference | 5/20/1998 | 6/17/1998 | 6/17/1998 | P | PART |
|
|
|
06/18/98 338 - AS PER 338 made ok for the cover of the guest units of the 3rd floor west wing
|
INSP-Sprinkler Rough-in/Hydro | 6/10/1998 | 6/11/1998 | 6/11/1998 | A | PART |
Joe Tawney
|
|
|
06/11/98 406 - 3rd floor / clay ###-#### OK ON ROUGH IN OF NORTH WING OF 3RD FLOOR
|
INSP-Conference | 5/20/1998 | 6/10/1998 | 6/10/1998 | P | CANC |
|
|
|
06/09/98 338 - BY THE CONTR.
|
INSP-Conference | 5/20/1998 | 6/3/1998 | 6/3/1998 | P | PART |
|
|
|
06/03/98 338 - MADE OK TO COVER GUEST ROOMS IN THE 2ND FLOOR WEST WING
|
INSP-Final Inspection | 6/1/1998 | 6/2/1998 | 6/2/1998 | A | PART |
Joe Tawney
|
|
|
06/02/98 406 - 2nd floor clay ###-#### OK ON ROUGH IN OF NORTH EAST WING OF 2ND FLOOR
|
INSP-Conference | 5/20/1998 | 5/27/1998 | 5/27/1998 | P | PART |
|
|
|
PART
|
INSP - Framing/Rough-in | 5/22/1998 | 5/26/1998 | 5/26/1998 | A | PART |
|
|
|
4th floor clay ###-#### ok to insulate and hang ceilings of units in the east wing only
|
INSP-Conference | 5/20/1998 | 5/20/1998 | 5/20/1998 | P | PART |
|
|
|
ok to cover the laundry room and insul in progress throughout 1 ceiling at suite
|
INSP-Final Inspection | 5/18/1998 | 5/19/1998 | 5/19/1998 | A | PART |
Joe Tawney
|
|
|
05/19/98 406 - ###-#### OK ON ROUGH IN OF 3RD FLR EAST WING
|
INSP - Framing/Rough-in | 5/8/1998 | 5/12/1998 | 5/12/1998 | A | PART |
|
|
|
05/12/98 338 - made ok to cover guest rooms in the 3rd floor east wing a
|
INSP - Framing/Rough-in | 5/7/1998 | 5/8/1998 | 5/8/1998 | P | PART |
|
|
|
05/08/98 338 - 2nd floor guest rooms only for cover fire caulk ok
|
INSP - Framing/Rough-in | 5/6/1998 | 5/7/1998 | 5/7/1998 | A | PASS |
|
|
|
05/07/98 338 - 2nd floor east rooms only verbal corrections ok to insula
|
INSP-Sprinkler Rough-in/Hydro | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | PART |
Joe Tawney
|
|
|
04/28/98 406 - john ###-#### OK ROUGH IN ON 1ST, 2ND, & 3RD FLR EAST WING OK TO COVER EXC CORRIDOR
|
INSP - Conference | 4/16/1998 | 4/16/1998 | 4/16/1998 | | PART |
|
|
|
/ / 338 - conf on combustable trim placement
|
INSP - Framing/Rough-in | 4/15/1998 | 4/15/1998 | 4/15/1998 | P | PART |
|
|
|
04/15/98 338 - ok to cover in the pump/sorage roomclay ###-#### framing
|
INSP - Framing/Rough-in | 4/8/1998 | 4/9/1998 | 4/9/1998 | A | FAIL |
|
|
|
04/09/98 338 - verbal corrections to repair fireproofing and recall for
|
INSP - Framing/Rough-in | 4/3/1998 | 4/3/1998 | 4/3/1998 | P | PART |
Jim Storey
|
|
|
LOBBY \\ ###-#### CLAY lobby ceilling ok
|
INSP - Foundation | 5/1/1998 | 5/1/1998 | 4/1/1998 | P | PART |
|
|
|
###-####meeting with clay odell on the cover of units ok to start cover on the east wing first floor units only.
|
INSP - Framing/Rough-in | 3/13/1998 | 3/17/1998 | 3/17/1998 | A | NR |
|
|
|
03/17/98 338 - CONFERENCE WITH CLAY AT ###-####--AMERITEL INN made ok co
|
INSP - Concrete | 3/9/1998 | 3/10/1998 | 3/8/1998 | A | PART |
|
|
|
03/10/98 338 - poured and sp insp approvalSLAB POUR--CLAY ###-####
|
INSP - Conference | 2/26/1998 | 2/26/1998 | 2/26/1998 | | PART |
|
|
|
/ / 338 - met with gslane,barchibald,kmaurer, per questions raised by
|
(F) Reprint permit | | | 2/23/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 2/19/1998 | 2/19/1998 | 2/20/1998 | P | PART |
|
|
|
02/19/98 338 - conf on fire proofingPRE CONSTRUCTION MEETING--CLAY 870-7
|
INSP - Framing/Rough-in | 2/17/1998 | 2/17/1998 | 2/19/1998 | P | NR |
|
|
|
02/17/98 338 - CONFERENCE ###-#### CLAY postponed
|
INSP-Conference | 2/13/1998 | 2/17/1998 | 2/17/1998 | A | CANC |
Wes Worcester
|
|
|
02/17/98 342 - CLAY ###-#### cancelled by Clay until 2/18
|
Plan assigned to (JCM) | 11/14/1997 | | 2/13/1998 | | PASS |
John Menard
|
|
|
|
Telephone call | | | 2/13/1998 | | |
|
|
|
CALLED GAVE DOLLAR AMOUNT CLAY
|
Print Occupancy Form | | | 2/13/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/13/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/13/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/1998 | | PASS |
|
|
|
2-13-98 JOHN IS KEEPING OFFICE COPY FOR NOW. KMM
|
Routing - PLAN CHECK | 2/12/1998 | | 2/12/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - A.C.H.D | 10/6/1997 | | 2/12/1998 | | PASS |
|
|
|
PACKAGE #2 IMPACT FEE CERTIFICATE #97-1846
|
Routing - PLAN CHECK | 2/12/1998 | | 2/12/1998 | | PASS |
|
|
|
ACHD PACKAGE
|
Routing - FIRE | 2/10/1998 | | 2/11/1998 | | PASS |
|
|
|
PACKAGE #1
|
Plan resubmittals received | | | 2/11/1998 | | |
|
|
|
RECEIVED 2 COPIES OF REVISED SHEETS A4, A5, A6, A7, A8, A9, A18, A19.1 ROUTED TO JOHN M.
|
Telephone call | | | 2/11/1998 | | |
|
|
|
RECEIVE BY FAX 6 PAGES OF AVIGATION EASEMENT AND 5 PAGES OF NO BUILD EASMENT. GAVE TWO COPIES TO MARLENE, ONE COPY TO JOHN M. AND ONE COPY TO FILE. KMM
|
Telephone call | | | 2/11/1998 | | PASS |
|
|
|
SPOKE WITH JERRY WOLF TO LET HIM KNOW THAT CDH WAS PASSED PER JOHN M.
|
Plan resubmittals requested | | | 2/9/1998 | | PEND |
|
|
|
FAXED JERRIE WOLFE WITH A REQUEST FOR CLARIFICATION ON A COUPLE REMAINING ITEMS.
|
Routing - PLAN CHECK | 1/30/1998 | | 2/2/1998 | | PEND |
|
|
|
|
Routing - FIRE | 1/30/1998 | | 2/2/1998 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 1/29/1998 | | PEND |
|
|
|
MAILED JERRIE WOLFE'S OFFICE A COPY OF THE PRELIMINARY PLAN REVIEW COMMENTS.
|
Routing - PLUMBING | 1/26/1998 | | 1/27/1998 | | PASS |
|
|
|
RESUBMITTED PLUMBING SHEETS ROUTED TO LEE RICE FOR REVIEW. PLANS WERE REVIEWED AND APPROVED BY LEE RICE, LEE RETURNED PLANS TO JOHN MENARD'S DESK.
|
Plan resubmittals received | | | 1/26/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM RUSSELL COLBURN AT 5:02 PM 1/23/98. PUT ON JOHN MENARD'S DESK 1/26/98. DAR
|
Plan resubmittals received | | | 1/26/1998 | | PEND |
|
|
|
RECEIVED PLUMBING RESUBMITTALS REQUESTING REVISIONS. PLANS GIVEN TO LEE RICE FOR REVIEW.
|
Routing - FIRE | 1/9/1998 | | 1/16/1998 | | FAIL |
|
|
|
PACKAGE #1 returned to Menard to add resubmittals rec'd 1/13/98 plans were not complete enough to do a review w/o the resubmittals
|
INSP - Framing/Rough-in | 1/15/1998 | 1/15/1998 | 1/15/1998 | P | PASS |
|
|
|
01/15/98 338 - conf. clay ###-####
|
Plan resubmittals received | | | 1/13/1998 | | |
|
|
|
REQUIRED CORRECTION RECEIVED AND ROUTED TO JOHN M.
|
Routing - PLANNING | 1/2/1998 | | 1/6/1998 | | PASS |
|
|
|
X-REF: DRH97-0146. APPROVED BY MGS.
|
Routing - PLUMBING | 12/31/1997 | | 1/2/1998 | | PASS |
|
|
|
|
90 day tracking............. | | 9/30/1997 | 12/29/1997 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 12/18/1997 | | 12/29/1997 | | PASS |
|
|
|
PACKAGE #1
|
Meeting | | | 12/22/1997 | | PEND |
|
|
|
A MEETING WAS HELD WITH TIM HOGLAND, JOHN MENARD, MARLENE SOUTHARD, JEFF JONES, FLOYD VARLEY, CLAY ODELL AND BRAD CHARLES. THE MEETING WAS HELD TO IDENTIFY PROBLEMS AND CONCERNS ABOUT THE INCOMPLETE PLANS THAT WERE SUBMITTED. IT WAS INDICATED BY CLAY ODELL THAT IT WOULD TAKE SEVERAL WEEKS FOR THE PLANS TO BE COMPLETED TO THE POINT REQUIRED FOR A COMPLETE PLAN REVIEW. TIM HOGLAND INDICATED THAT IT WOULD BE POSSIBLE FOR AMERITEL TO GET A PERMIT TO START THE STEEL IF THEY AGREED TO CHANGE THE BUILDING CONSTRUCTION TYPE TO II-FR. (THERE WAS NOT REPRESENTATIVE FROM THE ARCHITECT'S OFFICE AT THIS MEETING.)
|
Routing Off Site - STRUCTURAL | 12/9/1997 | | 12/18/1997 | | |
|
|
|
REVISED PLANS SENT OUT TO CH2MHILL VIA PDQ. ONE SUBMITTAL OF THREE RESUBMITTED FOR CH2MHILL BY RUSSEL COBURN. THESE INCLUDED ITEM 4. CLARIFICATION DRAWING AND ITEM 6. ENGINEERING AND DETAILING OF MANUFACTURED STEEL TRUSSES. A LETTER FROM REESE LEAVITT, (AMERITEL INNS STRUCTRUAL REVIEW COMMENT ANSWERS) A LETTER FROM GOLDEN EMPIRE MAN. INC. SIGNED BY BRUCE HORROCKS P.E.
|
Routing Off Site - STRUCTURAL | 11/17/1997 | | 12/15/1997 | | |
|
|
|
ONE SUBMITTAL OF THREE RESUBMITTED FOR CH2MHILL. CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL ALSO THREE REVISED STRUCTURAL CALCS. AND THREE LETTERS ADDRESSED TO MR. WOLFE FROM BRUCE L. HORROCKS P.E.
|
Plan resubmittals received | | | 12/9/1997 | | |
|
|
|
RECEIVED 1. 2 SETS OF PLUMBING 2. 2 SETS OF MECH. 3. 3 SETS OF OUTSIDE ENGINEERING RECEIVED.WILL SEND TO CH2MHILL 4. 3 SETS OF P & Z.I GAVE ONE SET TO MARTY SANTOYO.
|
Routing - ELECTRICAL | 11/18/1997 | | 11/26/1997 | | PASS |
|
|
|
PACKAGE #1 FIELD VERIFY PER 324 11/26/97 DAR
|
Routing - PLUMBING | 11/13/1997 | | 11/18/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Routing Off Site - STRUCTURAL | 10/30/1997 | | 11/17/1997 | | |
|
|
|
REVISED PLANS SENT OUT TO CH2MHILL VIA PDQ RETURNED TO BUILDING DEPARTMENT 11-17-97, STRUCTURAL REVIEW LETTER BY CH2MHILL DATED 11-17-97 REVISED FOUNDATION DRAWINGS (2 SETS) ANCHOR BOLT CALCULATIONS (2 SETS) FOUNDATION CALCULATIONS (2 SETS)
|
Plan assigned to (RGG) | 10/6/1997 | | 11/14/1997 | | PASS |
|
|
|
|
Routing - PLANNING | 11/7/1997 | | 11/13/1997 | | FAIL |
|
|
|
PACKAGE #1 X-REF: CUP97-0074 & DRH97-0146. CU APPROVED BY RC. DR CONDITIONS HAVE NOT BEEN MET; LET RUSSELL COBURN OF WOLFE'S OFFICE KNOW THIS VIA PHONE CALL. DR REVIEWED BY MGS.
|
Routing - PUBLIC WORKS | 10/30/1997 | | 11/6/1997 | | FAIL |
|
|
|
PACKAGE #1 REQUIRES DRAINAGE PLAN REVISION. PER BM
|
Routing Off Site - C.D.H | 10/6/1997 | | 10/29/1997 | | PASS |
|
|
|
PACKAGE #1 CONTACTED CLAY ODELL AT ###-#### TO TAKE PLANS OUT TO CDH PLANS INCOMPLETE TO DO POOL AND KITCHEN REVIEW PER SUSIE SIMMON. 12-05-97 PLANS SUBMITTED FOR POOL UNDER PERMIT BLD97-3604 THERE IS NO KITCHEN PROPOSED AS PART OF THIS BUILDING PROJECT.
|
Routing Off Site - STRUCTURAL | 10/6/1997 | | 10/27/1997 | | |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL
|
Plans ACCEPTED BY PLAN CHECK | | | 10/6/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 9/30/1997 | | 10/6/1997 | | PEND |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/6/1997 | | PASS |
|
|
|
|
Application received | | | 9/30/1997 | | |
|
|
|
|
Received Certificate of Value | | | 9/30/1997 | | PASS |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
PRINT ACTIONS | | | | | |
|
|
|
|