Fee Review-notes | 7/14/1998 | | 10/16/1998 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/14/1998 | 8/14/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/14/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7344 issued 8-14-98 to the Bon Marche.
|
Receive PAYMENT IN FULL PRINT | | | 8/13/1998 | | |
|
|
|
|
CHANGE STATUS TO (I) | | | 8/13/1998 | | |
|
|
|
|
CHANGE STATUS TO (F) | | | 8/12/1998 | | |
|
|
|
ADDITIONAL VALUE
|
(F) Reprint permit | | | 8/12/1998 | | |
|
|
|
|
INSP-Final Inspection | 7/23/1998 | 7/24/1998 | 7/24/1998 | A | PASS |
Joe Tawney
|
|
|
07/24/98 406 - FINAL POSSIBLE A TEMP OCC. JOHN ###-#### THE BON MARCHE REINSP OK ON PHASE 5 AND OK FOR PERM OCC & OR CERT OF COMPLETION
|
INSP - Final | 7/23/1998 | 7/24/1998 | 7/24/1998 | P | PASS |
|
|
|
07/24/98 338 - SIGNED THE TEMP COL OF THE OCC REQ CARD FOR PHASE 5
|
INSP-Final Inspection | 7/6/1998 | 7/7/1998 | 7/7/1998 | P | PART |
Joe Tawney
|
|
|
07/07/98 406 - John ###-#### OK FOR TEMP OCC OF PHASE VI ì
|
INSP - Final | 7/6/1998 | 7/7/1998 | 7/7/1998 | P | PART |
|
|
|
07/07/98 338 - TCO -TEMP C OF O ISSUED ok for same i signed the occ req
|
Temporary occupancy | | | 7/7/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3653 issued 7-7-98 to the Bon Marche, Phase 6.
|
INSP - Final | 6/9/1998 | 6/10/1998 | 6/10/1998 | P | PART |
Joe Tawney
|
|
|
06/10/98 406 - JOHN ###-#### AND 338 IS ALSO SCHEDULED TO GO OUT TEMP OCC FINAL OK FOR TEMP ON PHASE IV
|
INSP-Conference | 6/9/1998 | 6/10/1998 | 6/10/1998 | P | PASS |
|
|
|
06/09/98 338 - OK FOR THE PHASE 5 OF PROJECT FOR TEMP OCC
|
Temporary occupancy | | | 6/10/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3633 issued 6-10-98 to Phase 4 at the Bon Marche.
|
INSP-Final Inspection | 6/3/1998 | 6/3/1998 | 6/3/1998 | P | PART |
Joe Tawney
|
|
|
06/03/98 406 - fire sprinkle Mike ###-#### OK SPKLR PROTECTION FOR ESCALATOR OPENING OK RI FOR PHASE 4 PART PHASE 5
|
INSP-Final Inspection | 5/13/1998 | 5/14/1998 | 5/14/1998 | P | PART |
Joe Tawney
|
|
|
05/14/98 406 - john ###-#### FINAL PHASE III OK FOR TEMP OCC
|
INSP - Final | 5/13/1998 | 5/14/1998 | 5/14/1998 | P | PART |
|
|
|
05/14/98 338 - signed the temp col for this phase
|
Temporary occupancy | | | 5/14/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3616 issued 5-14-98 to the Bon Marche, Phase 3.
|
Temporary occupancy | | | 5/11/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3613 issued 5-11-98 to the Bon Marche Phase 2-B.
|
INSP - Final | 5/7/1998 | 5/11/1998 | 5/8/1998 | P | PART |
|
|
|
05/11/98 338 - sogned the temp col called cathy to verify
|
INSP - Final | 5/7/1998 | 5/7/1998 | 5/7/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL OK ON SPKLR SYSTEM COVERAGE WOMENS DEPT PHASE III
|
INSP-Final Inspection | 5/7/1998 | 5/7/1998 | 5/7/1998 | P | PART |
Joe Tawney
|
|
|
05/07/98 406 - ###-#### SHOE DEPT PHASE II OK FOR TEMP OCC
|
INSP - Framing/Rough-in | 4/30/1998 | 5/1/1998 | 5/1/1998 | A | PASS |
|
|
|
made ok seizmic ok935
|
INSP - Framing/Rough-in | 4/30/1998 | 4/30/1998 | 4/30/1998 | | CANC |
|
|
|
04/30/98 338 - cancelled till 05-01-98
|
INSP-Final Inspection | 4/30/1998 | 4/30/1998 | 4/30/1998 | P | PART |
Joe Tawney
|
|
|
04/30/98 406 - mike ###-#### OK ON SPKLR ROUGH IN FOR MALL AREA OF BON ADD ONE HEAD
|
INSP - Framing/Rough-in | 4/29/1998 | 4/30/1998 | 4/30/1998 | A | CANC |
|
|
|
CANCELLED BY JON TILL 05-01-98
|
INSP - Framing/Rough-in | 4/30/1998 | 4/30/1998 | 4/30/1998 | | CANC |
|
|
|
04/30/98 338 - cancelled till 05-01-98
|
INSP - Letter of compliance | 4/24/1998 | 4/24/1998 | 4/24/1998 | | PASS |
|
|
|
/ / 338 - # 014265
|
INSP - Letter of compliance | 4/24/1998 | 4/24/1998 | 4/24/1998 | | PASS |
|
|
|
/ / 338 - # 014265
|
INSP - Final | 4/23/1998 | 4/24/1998 | 4/24/1998 | A | PASS |
|
|
|
04/24/98 338 - c/c issued final approval documentation from sp insp agen
|
INSP-Final Inspection | 4/22/1998 | 4/23/1998 | 4/24/1998 | P | PART |
Joe Tawney
|
|
|
04/23/98 406 - JOHN ###-#### FINAL OK FOR TEMP OCC ON "IN BON" PHASE OF REMODEL
|
Temporary occupancy | | | 4/24/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3595 issued 4-24-98 to the Bon Marche, Phase 2 only.
|
INSP - Final | 4/22/1998 | 4/23/1998 | 4/23/1998 | P | PART |
|
|
|
04/24/98 338 - temp made ok fire ext in place for phase 2-a/b
|
INSP-Final Inspection | 4/15/1998 | 4/16/1998 | 4/16/1998 | A | PART |
Joe Tawney
|
|
|
mike ###-#### OK ON ROUGH IN OF IN BON PORTION OF REMODEL
|
INSP - Framing/Rough-in | 4/7/1998 | 4/7/1998 | 4/7/1998 | P | PART |
|
|
|
04/07/98 338 - verify slip joint at the attachment of the overhead door
|
INSP - Final | 3/24/1998 | 3/27/1998 | 3/27/1998 | A | PART |
|
|
|
03/27/98 338 - TCO -TEMP C OF O ISSUED by cathy for the 2nd phase/additi
|
INSP-Final Inspection | 3/24/1998 | 3/27/1998 | 3/27/1998 | A | PASS |
Joe Tawney
|
|
|
03/27/98 406 - 7:00 as per 406 and 338 john ###-#### FINAL OK FOR TEMP OCC OF NEW ADDITION
|
Temporary occupancy | | | 3/27/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3584 issued 3-27-98 to The Bon Marche, Phase II.
|
INSP-Alarm Testing | 3/25/1998 | 3/26/1998 | 3/26/1998 | A | PART |
Joe Tawney
|
|
|
03/26/98 406 - JOHN ###-#### ALARM TEST OK ON SIGNALLING DEVICES, PULLS, & SMOKE DET DUCT DET NOT TES
|
Print Occupancy Form | | | 3/26/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/26/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/26/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/26/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/26/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/26/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/26/1998 | | |
|
|
|
|
INSP-Conference | 3/23/1998 | 3/23/1998 | 3/23/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF ON SMOKE EVAC SYSTEM AND FINAL INSPECTION SCHEDULE WITH
|
INSP - Conference | 3/17/1998 | 3/17/1998 | 3/17/1998 | | PART |
|
|
|
/ / 338 - with Jon Anderson on the signoffs needed for temp occ on the
|
INSP - Framing/Rough-in | 3/9/1998 | 3/11/1998 | 3/10/1998 | P | CANC |
|
|
|
CONFERENCE WITH JOHN FOR 2:00 PLEASE--###-####. HE WILL CALL YOU TO CONFIRM.. cancelled as per 338.mps
|
INSP-Conference | 3/9/1998 | 3/11/1998 | 3/10/1998 | P | CANC |
Joe Tawney
|
|
|
JOHN WILL CALL TO CONFIRM 2:00 WITH YOU..###-#### cancelled as per 338.mps
|
INSP - Conference | 3/10/1998 | 3/10/1998 | 3/10/1998 | | PART |
|
|
|
/ / 338 - with Jack Bolar and jon anderson ---requiremens for the smok
|
INSP - Conference | 3/9/1998 | 3/9/1998 | 3/9/1998 | | PASS |
|
|
|
/ / 338 - with jon on conf request of an inspection to determin possib of new 20,000 s.f. addition prior to the installation of the new evac sy the system parts are not to arrive until same date as gand opening conf for wed p.m. 03
|
INSP - Conference | 3/9/1998 | 3/9/1998 | 3/9/1998 | | PASS |
|
|
|
/ / 338 - with jon on conf request of an inspection to determin possib of new 20,000 s.f. addition prior to the installation of the new evac sy the system parts are not to arrive until same date as gand opening conf for wed p.m. 03
|
INSP - Framing/Rough-in | 3/5/1998 | 3/6/1998 | 3/6/1998 | A | PART |
|
|
|
03/06/98 338 - most of 2nd 1/2 of ceiling gridScheduled by Hello!. Cont
|
INSP - Framing/Rough-in | 3/4/1998 | 3/5/1998 | 3/5/1998 | A | CANC |
|
|
|
03/05/98 338 - cancelled by jonScheduled by Hello!. Contact phone is [8
|
INSP - Framing/Rough-in | 2/19/1998 | 2/20/1998 | 2/20/1998 | P | PART |
|
|
|
02/20/98 338 - east 1/3 ceiling grid ok ###-#### jon
|
INSP - Framing/Rough-in | 2/10/1998 | 2/11/1998 | 2/11/1998 | A | PART |
|
|
|
02/11/98 338 - jon ###-#### framing mADE OK SP INSP TO VERIFY INSTALL OF
|
Plan assigned to (M_P) | 10/15/1997 | | 2/10/1998 | | PASS |
Mike Phillips
|
|
|
02/10/98 12:30:00 KMM - this action updated by action script from <<>> in Case No. BLD97-3096
|
Print Occupancy Form | | | 2/10/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/10/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 2/10/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/10/1998 | | |
|
|
|
|
Telephone call | | | 2/10/1998 | | PASS |
|
|
|
DARLA
|
Plan resubmittals received | | | 2/10/1998 | | |
|
|
|
RECEIVED 1 COPY OF A LETTER REGARDING SMOKE CONTROL SYSTEMS REVIEW 1 COPY OF SMOKE MANAGEMENT ANALYSIS\ 2 COPIES OF SHEETS M2.2, M2.3, M2.4, M3.0, E2.1AP, E2.2AP, E3.0, & E4.0 ROUTED TO MIKE PHILLIPS
|
Issue PAID IN FULL permit | | | 2/10/1998 | | |
|
|
|
|
Routing - FIRE | 2/5/1998 | | 2/5/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/3/1998 | | |
|
|
|
RECEIVED 2 COPIES OF REVISED MECHANICAL AND ELECTRICAL PLANS. 2 COPIES OF RATIONAL ANALYSIS OF SMOKE MANAGEMENT. ROUTED TO MIKE P. ALSO RECEIVED 1 COPY FOR FLOYD AND ROUTED TO HIM. KMM
|
Plan Reviewer's activity | | | 1/16/1998 | | PEND |
|
|
|
WAITING FOR FIRE DEPARTMENT APPROVAL AND MIKE DILLON APPROVAL FOR SMOKE MANAGEMENT SYSTEM.
|
Routing - FIRE | 11/14/1997 | | 1/13/1998 | | PASS |
|
|
|
|
90 day tracking............. | | 10/14/1997 | 1/12/1998 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 11/14/1997 | | FAIL |
|
|
|
Sending to fire department for review waiting for analysis of smoke control system prior to sending correction notice to Architect.
|
Print Pending Permit.LaserJet4 | | | 11/14/1997 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 10/16/1997 | | 10/16/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 10/14/1997 | | 10/15/1997 | | |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 10/15/1997 | | |
|
|
|
Route to PUBLIC WORKS then PLAN CHECK then FIRE.
|
Recd Pcfee & Taken To Pln CK | | | 10/14/1997 | | |
|
|
|
|
Application received | | | 10/14/1997 | | |
|
|
|
|