Letter of compliance/Occupancy | | | 10/15/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/15/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/30/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/20/2007 | | |
|
|
|
|
(F) Reprint permit | | | 4/20/2007 | | |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 1/8/2001 | | DONE |
|
|
|
|
Fee Review-notes | 1/28/2000 | 1/28/2000 | 1/28/2000 | | DONE |
|
|
|
additional value from subs lh
|
(F) Reprint permit | | | 1/28/2000 | | DONE |
|
|
|
|
BLD-Final | 11/12/1999 | 11/12/1999 | 11/12/1999 | P | PASS |
|
|
|
penthouse occ--jeff ###-#### 2 new exit signs and occ. Load signs.
|
BLD-Final | 11/4/1999 | 11/4/1999 | 11/4/1999 | A | PASS |
|
|
|
Ok for occ.
|
BLD-Final | 11/4/1999 | 11/4/1999 | 11/4/1999 | A | PASS |
|
|
|
Ok for occ. L/C issued #18292
|
Letter of compliance | | | 11/4/1999 | | DONE |
|
|
|
Letter of Compliance #18292 issued 11-4-99.
|
CHANGE STATUS TO (TMP) | | | 10/29/1999 | | DONE |
|
|
|
|
SUPER- Supervisor's review | 7/7/1999 | 7/7/1999 | 7/7/1999 | | |
|
|
|
still in progress temp occ in place
|
SUPER- Supervisor's review | 7/1/1999 | 7/1/1999 | 7/1/1999 | | |
|
|
|
final continuing waiting for jim schmier. to signoff
|
SUPER- Supervisor's review | 6/7/1999 | 6/7/1999 | 6/7/1999 | | |
|
|
|
still waiting on hardware submittal
|
SUPER- Supervisor's review | 5/10/1999 | 5/10/1999 | 5/10/1999 | | |
|
|
|
hardware to comply with exiting spec on elevator lobby doors
|
Code Occupancy Approval | | | 5/10/1999 | | OPEN |
|
|
|
temporary only --no bond-- site clean up needs completed
|
SUPER- Supervisor's review | 5/6/1999 | 5/6/1999 | 5/6/1999 | | |
|
|
|
drainage from walking deck on top floor in question perry to find out answer
|
INSP-Conference | 5/6/1999 | 5/6/1999 | 5/6/1999 | P | PART |
Rick Jackson
|
|
|
damper for west stair now working
|
SUPER- Supervisor's review | 5/5/1999 | 5/5/1999 | 5/5/1999 | | |
|
|
|
pair of exit doors have fusable link pins to lock doors closed not approved. resumit or provide listing of approved egress hardware.
|
INSP-Conference | 5/5/1999 | 5/5/1999 | 5/5/1999 | A | PART |
Rick Jackson
|
|
|
voice evac working - fire watch not needed; left c/n for smoke control station for fans; damper for west fan not working
|
SUPER- Supervisor's review | 5/4/1999 | 5/4/1999 | 5/4/1999 | | |
|
|
|
continuing air leakage tests on floors
|
SUPER- Supervisor's review | 5/3/1999 | 5/3/1999 | 5/3/1999 | | |
|
|
|
air leakage continuing testing floors
|
INSP - Final | 4/30/1999 | 5/3/1999 | 5/3/1999 | A | PART |
Rick Jackson
|
|
|
temp occ approved - c/n issued
|
INSP - Final | 4/30/1999 | 5/3/1999 | 5/3/1999 | A | PART |
|
|
|
alarm testing and str walkthrough, made ok for temp occ with full time fire watch whenever tenants are in the building. c/n issued.
|
SUPER- Supervisor's review | 4/30/1999 | 4/30/1999 | 4/30/1999 | | |
|
|
|
continuing air leakage tests perry rick.
|
INSP-Alarm Testing | 4/28/1999 | 4/30/1999 | 4/30/1999 | A | NR |
Rick Jackson
|
|
|
Dan ###-#### panel not ready
|
INSP - Final | 4/29/1999 | 4/30/1999 | 4/30/1999 | P | FAIL |
|
|
|
04/30/99 338 - will reschedule for 05-03-99
|
Temporary occupancy | | | 4/30/1999 | | PASS |
|
|
|
Temp. Occ. Cert. #3828 issued 4-30-99 to the C.W. Moore Plaza Bldg. (shell & core only).
|
SUPER- Supervisor's review | 4/27/1999 | 4/27/1999 | 4/27/1999 | | |
|
|
|
pressurazation of floors in progress ok
|
INSP-Conference | 4/27/1999 | 4/27/1999 | 4/27/1999 | A | PART |
Rick Jackson
|
|
|
discussed c/n issued for generator problems with Robert. items to be fixed prior to occupancy
|
INSP-Final Inspection | 4/27/1999 | 4/27/1999 | 4/27/1999 | P | PART |
Rick Jackson
|
|
|
smoke pressure test of 7th floor - data indicates it passed test
|
INSP-Final Inspection | 4/26/1999 | 4/26/1999 | 4/26/1999 | A | FAIL |
Rick Jackson
|
|
|
generator test failed - overheated
|
SUPER- Supervisor's review | 4/23/1999 | 4/23/1999 | 4/23/1999 | | |
|
|
|
FLOOR PRESSURIZATION CHECK OK
|
INSP-Final Inspection | 4/12/1999 | 4/12/1999 | 4/12/1999 | P | PART |
Rick Jackson
|
|
|
Mike will be on site 8th floor final 8th floor hyro okay - not a final
|
SUPER- Supervisor's review | 4/12/1999 | 4/12/1999 | 4/12/1999 | | |
|
|
|
motion detectors installed in stair vestibules ok
|
SUPER- Supervisor's review | 4/9/1999 | 4/9/1999 | 4/9/1999 | | |
|
|
|
still in progress. fire retardent treated plywood on interior walls-assemblys ok
|
INSP - Framing/Rough-in | 4/8/1999 | 4/8/1999 | 4/9/1999 | P | PART |
|
|
|
04/08/99 338 - made ok for the rest room cover at the penthouse
|
INSP-Final Inspection | 4/6/1999 | 4/6/1999 | 4/6/1999 | P | PART |
Rick Jackson
|
|
|
###-#### MIKE//FINAL FLRS 2,6 &7 not a final - hydro of floors 2, 6 and 7 okay
|
INSP - Framing/Rough-in | 4/5/1999 | 4/5/1999 | 4/5/1999 | P | PART |
|
|
|
04/05/99 338 - made ok for cover cept the bathroom walls confirm frp and
|
INSP-Final Inspection | 3/25/1999 | 3/29/1999 | 3/29/1999 | A | PART |
Rick Jackson
|
|
|
###-#### mike tested fire pump and standpipe flows - okay. alarms not connected or complete
|
INSP-Conference | 3/22/1999 | 3/23/1999 | 3/23/1999 | A | PART |
Rick Jackson
|
|
|
Jeff Langan at ###-####. discussed final requirements; smoke test; alarms for TI's not okay; lobbys needed
|
INSP - Framing/Rough-in | 3/23/1999 | 3/23/1999 | 3/23/1999 | | PART |
|
|
|
03/23/99 338 - conf with super and owner on the start up proceedure
|
INSP - Framing/Rough-in | 3/17/1999 | 3/18/1999 | 3/18/1999 | P | PART |
|
|
|
03/18/99 338 - c/n issued for the core area other c/n of 031699 madeok
|
INSP-Conference | 3/10/1999 | 3/10/1999 | 3/10/1999 | P | PART |
Rick Jackson
|
|
|
left letter requesting alarm plans with CSDI
|
INSP - Framing/Rough-in | 3/9/1999 | 3/10/1999 | 3/10/1999 | P | PART |
|
|
|
03/10/99 338 - part made ok verbal cn being done
|
INSP-Sprinkler Rough-in/Hydro | 3/8/1999 | 3/8/1999 | 3/8/1999 | | PART |
Rick Jackson
|
|
|
/ / 409 - VORTEX PLATE INSTALLED IN WATER TANK - OKAY TO COVER TANK
|
INSP - Framing/Rough-in | 3/8/1999 | 3/8/1999 | 3/8/1999 | P | FAIL |
|
|
|
03/08/99 338 - still must confirm penetration protection.
|
INSP-Conference | 3/4/1999 | 3/4/1999 | 3/4/1999 | A | PART |
Rick Jackson
|
|
|
profit meeting
|
INSP - Framing/Rough-in | 2/16/1999 | 2/17/1999 | 2/17/1999 | P | PART |
|
|
|
02/17/99 338 - WITH PAT AND FIRE SEALER FOR THE FLOOR PERIMETER
|
SUPER- Supervisor's review | 2/17/1999 | 2/17/1999 | 2/17/1999 | | |
|
|
|
continuing construction patching fireproofing -spray applied. in various areas ok
|
SUPER- Supervisor's review | 1/25/1999 | 1/25/1999 | 1/25/1999 | | |
|
|
|
reviewd penthouse frame. fireretardent treated wood used on assembly in this area. ok gs
|
SUPER- Supervisor's review | 1/22/1999 | 1/22/1999 | 1/22/1999 | | |
|
|
|
walk through of project with new inspector parry paine. also taking county inspector through to see a highrise in progress.
|
INSP - Framing/Rough-in | 1/11/1999 | 1/14/1999 | 1/15/1999 | A | PART |
|
|
|
01/14/99 338 - madeok with sp insp approval
|
SUPER- Supervisor's review | 1/14/1999 | 1/14/1999 | 1/14/1999 | | |
|
|
|
fireretardant treated plywood used in roof assembly
|
SUPER- Supervisor's review | 1/12/1999 | 1/12/1999 | 1/12/1999 | | |
|
|
|
change studs penthouse from 25ga to 16ga and will be load bearing.
|
INSP - Framing/Rough-in | 1/11/1999 | 1/11/1999 | 1/11/1999 | P | FAIL |
|
|
|
01/11/99 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 1/11/1999 | 1/11/1999 | 1/11/1999 | P | PART |
|
|
|
01/11/99 333 - 7th core ok
|
INSP - Framing/Rough-in | 12/28/1998 | 12/28/1998 | 12/28/1998 | P | PART |
|
|
|
12/28/98 333 - 6th ok
|
SUPER- Supervisor's review | 12/22/1998 | 12/22/1998 | 12/22/1998 | | |
|
|
|
setting roof units and enclosier still in progress. ok
|
SUPER- Supervisor's review | 12/16/1998 | 12/16/1998 | 12/16/1998 | | |
|
|
|
firestopping floors ok ephis system continuing ok
|
Fee Review-notes | 9/22/1998 | | 12/15/1998 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 12/14/1998 | 12/14/1998 | 12/14/1998 | A | FAIL |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 12/11/1998 | 12/11/1998 | 12/11/1998 | P | CANC |
Joe Tawney
|
|
|
12/11/98 406 - GREG ###-#### PAGER CANCEL RESCHEDULE FOR 12/14/98
|
INSP - Framing/Rough-in | 12/10/1998 | 12/11/1998 | 12/10/1998 | A | PART |
|
|
|
12/11/98 333 - 2nd and 3rd floor ok
|
INSP - Framing/Rough-in | 12/10/1998 | 12/10/1998 | 12/10/1998 | | PART |
|
|
|
12/10/98 333 - third and fourth floor corridors and baths
|
INSP - Framing/Rough-in | | | 12/10/1998 | | PART |
|
|
|
12/10/98 333 - PAT SIMONS ###-####
|
SUPER- Supervisor's review | 12/9/1998 | 12/9/1998 | 12/9/1998 | | |
|
|
|
masonary starting special inspection ok
|
INSP - Framing/Rough-in | 12/3/1998 | 12/4/1998 | 12/4/1998 | A | PART |
|
|
|
12/04/98 333 - fire stop conference
|
SUPER- Supervisor's review | 11/24/1998 | 11/24/1998 | 11/24/1998 | | |
|
|
|
framing proceeding ephis system being installed. floor slab to extend to outer wall facing on curtain walls of the system.
|
INSP - Framing/Rough-in | 11/20/1998 | 11/23/1998 | 11/23/1998 | A | PART |
|
|
|
11/23/98 333 - 1st second and basement
|
INSP - Concrete | 11/4/1998 | 11/5/1998 | 11/5/1998 | A | PASS |
Bob Archibald
|
|
|
PAT AT ###-####. Covered by special inspection.
|
INSP-Supply line flush | 10/29/1998 | 10/30/1998 | 10/30/1998 | P | PASS |
Rick Jackson
|
|
|
GREG ###-#### 1:15 underground flush okay
|
INSP-Sprinkler Rough-in/Hydro | 10/29/1998 | 10/30/1998 | 10/30/1998 | P | PART |
Rick Jackson
|
|
|
GREG ###-#### 1:15 checked 3rd floor - check sway bracong requirements on feed main
|
INSP - Framing/Rough-in | 10/13/1998 | 10/14/1998 | 10/14/1998 | P | PART |
|
|
|
10/14/98 333 - basement all but soffits
|
INSP-Sprinkler Rough-in/Hydro | 10/13/1998 | 10/13/1998 | 10/13/1998 | P | PART |
Rick Jackson
|
|
|
pat simons ###-#### fire r-in insp requested location for outside bell - northeast wall
|
INSP - Concrete | 10/8/1998 | 10/9/1998 | 10/9/1998 | A | CANC |
Dave Lightfoot
|
|
|
10/09/98 337 - pat ###-####
|
INSP-Sprinkler Rough-in/Hydro | 10/1/1998 | 10/2/1998 | 10/2/1998 | A | PART |
Rick Jackson
|
|
|
GREG ###-#### PAGER checked the placement of the standpipe hose outlets in stairs - okay.
|
INSP - Framing/Rough-in | 10/2/1998 | 10/2/1998 | 10/2/1998 | A | PART |
|
|
|
resubmittal
|
INSP - Concrete | 9/24/1998 | 9/25/1998 | 9/25/1998 | A | PART |
|
|
|
09/25/98 333 - ok floor
|
INSP-Conference | 9/22/1998 | 9/22/1998 | 9/22/1998 | P | PART |
Rick Jackson
|
|
|
okay to bury underground - not connected to city, still requires flush and hydro. reviewed sprinkler plans and temporary standpipe.
|
INSP - Framing/Rough-in | 9/21/1998 | 9/21/1998 | 9/21/1998 | P | PART |
|
|
|
first floor in progress
|
INSP - Concrete | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | PASS |
Tom Arcoraci
|
|
|
09/18/98 408 - PAT ###-####-POUR SLAB INSP-4TH FLOOR SPEC INSP ON SITE TMA
|
INSP - Framing/Rough-in | 9/3/1998 | 9/8/1998 | 9/8/1998 | A | PART |
|
|
|
09/08/98 333 - talked about firestoping req with elect
|
INSP - Foundation | 9/1/1998 | 9/2/1998 | 9/2/1998 | P | PASS |
|
|
|
09/02/98 333 - pend spec insp reports
|
INSP - Concrete | 8/27/1998 | 8/28/1998 | 8/28/1998 | A | |
|
|
|
pouring stair tower on the west side ###-#### allday
|
INSP - Concrete | 8/25/1998 | 8/25/1998 | 8/25/1998 | P | PART |
|
|
|
08/25/98 333 - pour east stair tower for the 8th floor ###-#### pour ok
|
Plan assigned to (JCM) | 5/11/1998 | | 8/25/1998 | | PASS |
John Menard
|
|
|
THIS ASSIGNMENT IS FOR THE RESUBMITTED PLANS SHEETS AFTER THE PERMIT WAS ISSUED. RESUBMITTED PLANS APPROVED.
|
Routing - PLAN CHECK | 8/20/1998 | | 8/25/1998 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/24/1998 | | 8/24/1998 | | PASS |
|
|
|
|
INSP - Foundation | 8/20/1998 | 8/21/1998 | 8/21/1998 | A | PART |
|
|
|
08/21/98 333 - 5TH FLOOR STAIR OK PEND SPEC INSP REPORTS
|
Routing - PLANNING | 8/7/1998 | | 8/19/1998 | | PASS |
|
|
|
approved with the condition that the utility vault located at the south-west corner of the site be relocated (as noted on sheet A.1.3).
|
INSP - Concrete | 8/14/1998 | 8/17/1998 | 8/17/1998 | A | PART |
|
|
|
08/17/98 333 - 5th floor stair
|
INSP - Concrete | 8/12/1998 | 8/14/1998 | 8/14/1998 | A | PART |
|
|
|
08/14/98 333 - 4th floor stair tower ok pend spec insp reports
|
Routing - FIRE | 7/23/1998 | | 7/28/1998 | | PASS |
|
|
|
|
Routing - PLUMBING | 7/21/1998 | | 7/23/1998 | | PASS |
|
|
|
TO REVIEW REVISIONS
|
INSP - Foundation | 7/9/1998 | 7/10/1998 | 7/10/1998 | A | PART |
Jim Storey
|
|
|
07/10/98 301 - covered w/special insp on site pending report.
|
INSP - Framing/Rough-in | 7/8/1998 | 7/9/1998 | 7/9/1998 | A | PART |
|
|
|
07/09/98 333 - third floor elevators
|
Print Pending Permit.LaserJet4 | | | 6/29/1998 | | PEND |
|
|
|
|
Plan resubmittals requested | | | 6/25/1998 | | |
|
|
|
RECEIVED PLAN MODIFICATION APPLICATION
|
INSP - Concrete | 6/19/1998 | 6/22/1998 | 6/22/1998 | A | PART |
|
|
|
06/22/98 333 - east stair tower first pour
|
Plan resubmittals received | | | 6/11/1998 | | PEND |
|
|
|
RECEIVED RESUBS FROM CSHQA FORWARDED SAME TO JOHN MENARD
|
Routing Off Site - STRUCTURAL | 6/2/1998 | | 6/10/1998 | | |
|
|
|
SENT RESUBS TO ATWOOD, HINZMAN, JONES DAR
|
INSP - Framing/Rough-in | 6/2/1998 | 6/4/1998 | 6/4/1998 | A | PART |
|
|
|
06/04/98 333 - ok pend spec insp rep
|
Routing Off Site - STRUCTURAL | 5/28/1998 | | 6/3/1998 | | PEND |
|
|
|
SENT RESUBS TO ATWOOD, HINZMAN, JONES. COVERS SECOND PHASE (AFTER FOUNDATION)
|
Plan resubmittals received | | | 6/3/1998 | | PEND |
|
|
|
RECEIVED RESUBS FROM CSHQA AND FORWARDED THEM TO KIM MAURER.
|
INSP - Foundation | 6/2/1998 | 6/2/1998 | 6/2/1998 | | PART |
|
|
|
/ / 333 - NORTH EAST CORNER OK
|
INSP - Framing/Rough-in | 6/2/1998 | 6/2/1998 | 6/2/1998 | P | PART |
|
|
|
06/02/98 333 - north east side ok
|
Plan resubmittals received | | | 6/1/1998 | | |
|
|
|
RECEIVED ONE COPY OF STRUCTURAL ENGINEERS LETTER AND CLACULATIONS. TWO COPIES OF DRAWING SHEETS A2.6, A3.4, AND S3.5. ROUTED TO KIM MAURER.
|
INSP - Concrete | 5/28/1998 | 5/29/1998 | 5/29/1998 | A | PART |
|
|
|
05/29/98 333 - south east ok
|
Plan resubmittals received | | | 5/22/1998 | | |
|
|
|
recieved reusbmittals and sent them to John Menard
|
INSP - Foundation | 5/12/1998 | 5/12/1998 | 5/12/1998 | | PART |
|
|
|
/ / 333 - SOUTH EAST WALL OK
|
INSP - Foundation | 5/1/1998 | 5/1/1998 | 5/1/1998 | P | PART |
|
|
|
05/01/98 333 - ok pending special insp reports
|
Routing Off Site - STRUCTURAL | 5/1/1998 | | 5/1/1998 | | PEND |
|
|
|
RECEIVED RESUBS BACK FROM AHJ. RESUBS RECEIVED BY DEPARTMENT AFTER THE 0ERMIT WAS ISSUED.
|
(F) Reprint permit | | | 3/25/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/24/1998 | | |
|
|
|
|
Plan assigned to (JCM) | 10/28/1997 | | 3/20/1998 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 3/20/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 3/18/1998 | | 3/20/1998 | | PASS |
|
|
|
PACKAGE #1
|
Inspection Record Card- Bld | | | 3/20/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 2/3/1998 | | 3/18/1998 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 3/18/1998 | | 3/18/1998 | | PASS |
|
|
|
|
INSP - Foundation | 3/17/1998 | 3/17/1998 | 3/17/1998 | | PART |
|
|
|
/ / 333 - TALKED TO JEFF HE WILL GET PERMIT TODAY
|
Routing Off Site - A.C.H.D | 10/22/1997 | | 3/17/1998 | | PEND |
|
|
|
PACKAGE #2 CONTACTED JEFF LANGAN AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES NOT PAID. 3/17/98
|
Routing - PUBLIC WORKS | 1/30/1998 | | 2/3/1998 | | FAIL |
|
|
|
NEEDS DRAINAGE PLAN REVISION. BM
|
Plan Reviewer's activity | | | 1/30/1998 | | PASS |
|
|
|
REVIEWED ALL RESUBMITTED PLANS AND HAVE APPROVED THEM FOR PERMIT AS SUBMITTED. SENT A COPY OF THE FINAL PLAN REVIEW COMMENTS TO THE ARCHITECT OF RECORD FOR HIS FILE.
|
Routing - PLAN CHECK | 1/23/1998 | | 1/30/1998 | | PASS |
|
|
|
PACKAGE #1
|
Plan Reviewer's activity | | | 1/29/1998 | | PASS |
|
|
|
A record of survey for the C. W. Moore Plaza property was recorded on 01/29/98 - The record of survey number #4152, the instrument number is #98007321
|
Routing - FIRE | 1/22/1998 | | 1/23/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 1/22/1998 | | 1/22/1998 | | PASS |
|
|
|
X-REF: DRH97-0246. APPROVED BY MGS.
|
90 day tracking............. | | 10/22/1997 | 1/20/1998 | | PEND |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/9/1998 | | 1/20/1998 | | |
|
|
|
RRESUBS SENT TO ATWOOD, HINZMAN, JONES 1-20-98 RECEIVED ONE COPY OF STRUCTRURAL PLAN CHECK REVIEW RESPONSES GEVEN FOR THE SECOND REVIEW. ALSO RETURNED ARE THE RESUBMITTED PLANS. ROUTED TO JOHN M. KMM THE STRUCTURAL PLAN REVIEW HAS BEEN REVIEWED AND APPROVED BY ATWOOD-HINZMAN-JONES.
|
Routing - PLUMBING | 1/15/1998 | | 1/16/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 1/12/1998 | | 1/14/1998 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION, PER BRIAN MURPHY.
|
Routing - PLANNING | 11/25/1997 | | 1/9/1998 | | FAIL |
|
|
|
PACKAGE #1 - THE DESIGN REVIEW WAS DENIED BY MARTY SANTOYO. HE INDICATED THAT THE DENIAL WAS BASED ON THE FACT THAT THE DESIGN REVIEW HAD NOT YET BEEN THROUGH THE REQUIRED APPEALS PERIOD. THE APPEAL PERIOD IS SCHEDULED TO BE COMPLETED ON 1/19/98.
|
Routing Off Site - STRUCTURAL | 10/22/1997 | | 12/16/1997 | | |
|
|
|
JOHN IS DOING REVIEW TO SEE IF THESE PLANS NEED TO GO TO OUT SIDE ENGINEERING. CALLED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES PER JOHN M.
|
Routing Off Site - STRUCTURAL | 12/11/1997 | | 12/16/1997 | | |
|
|
|
|
Plan resubmittals received | | | 12/10/1997 | | |
|
|
|
RECEIVED 2 REVISED STRUCTURAL PLANS PER BUILDING DEPARTMENT COMMENTS RECEIVED 2 REVISED RESPONSE TO STRUCTURAL PORTION OF BUILDING DEPARTMENT COMMENTS. CONTACTED MIKE BROWN AT CSHQA (###-####) TO LET HIM KNOW THAT I NEED ONE MORE SUBMITTAL BEFOR I CAN SEND TO ATWOOD HINZMAN AND JONES. 12-11-97 RECEIVED 1 REVISED STRUCTURAL PLANS PER BUILDING DERPT. RECEIVED 1 REVISED RESPONSE TO STRUCT. PORTION . AM NOW ROUTING TO ATWOOD HINZMAN AND JONES.
|
Plan resubmittals received | | | 11/28/1997 | | PEND |
|
|
|
|
Routing - FIRE | 11/17/1997 | | 11/25/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Plan resubmittals requested | | | 11/17/1997 | | PEND |
|
|
|
MAILED A COPY OF THE PLAN REVIEW TO OTIS LEMON AT CSHQA AND CALLED MARTIN HAHLE TO ASK IF HE WANTED TO COME OVER AND PICK UP A COPY; THE LIST WAS TOO LARGE TO FAX.
|
Routing - PUBLIC WORKS | 10/22/1997 | | 11/4/1997 | | FAIL |
|
|
|
PACKAGE #1 REQUIRES DRAINAGE PLAN REVISION PER BM.
|
Plan assigned to (RGG) | 10/22/1997 | | 10/28/1997 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/22/1997 | | |
|
|
|
|
Received Certificate of Value | | | 10/22/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 10/22/1997 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/22/1997 | | PASS |
|
|
|
|
Application received | | | 10/22/1997 | | |
|
|
|
|
Plan assigned to (MYS) | 10/22/1997 | | 10/22/1997 | | |
Marlene Southard
|
|
|
|
SUPER- Supervisor's review | 5/3/1999 | 4/30/1999 | | | |
|
|
|
|
PRINT ACTIONS | | | | | |
|
|
|
|
PRINT ACTIONS | | | | | |
|
|
|
|