Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-03195
StatusExpired
Name OLD NAVY STORE
Site Address 526 N MILWAUKEE ST
Project NameBOISE TOWNE PLAZA
Customer Number 
ePlanReviewNo
Description
To finish a 14,600 sq.ft. retail store per approved plans on file. Work to include construction of interior partitions to divide area into storage, dressing rooms, office, one-hour rated corridor to rear exit, and sales area. And to install 10' high storage racks. NOTE: This building is fully fire sprinklered. Any alteration to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (P.C.#688-97)RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 6/10/19986/10/1998 DONE
Details
INSP - Final5/27/19985/27/19985/27/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR PERM OCC
INSP-Final Inspection5/7/19985/11/19985/11/1998AFAIL
DetailsJoe Tawney
05/11/98 406 - ###-#### REINSP FAIL TAMPER SWITCH ON OUTSIDE CONTROL VLV NOT WORKING
INSP - Final3/24/19983/24/19983/24/1998 FAIL
DetailsJoe Tawney
/ / 406 - REINSP FOR PERM OCC FAIL ALARM SYSTEM NOT OPERATING PROPERLY
Temporary occupancy  3/23/1998 PASS
Temp. Occ. Cert. #3580 issued 3-23-98 to the Old Navy Store.
INSP-Final Inspection3/19/19983/20/19983/20/1998APASS
DetailsJoe Tawney
03/20/98 406 - DAN WILL CALL YOU TO SCHEDULE--###-#### REINSP OK FOR TEMP OCC NFPA 72 FORM FAX OF ALARM SIGNALS
INSP - Final3/19/19983/20/19983/20/1998PPART
Details
03/20/98 338 - FNL -OK FINAL signed the temp col occ req card
INSP - Final3/17/19983/19/19983/19/1998PCANC
Details
cancelled by contractor upon my arrival as the ele and fire had problems
INSP - Final3/19/19983/19/19983/19/1998 FAIL
DetailsJoe Tawney
/ / 406 - FINAL FAIL SPKLR MONITORING BLDG ADDRESS TAPE ON HEADS EMER
INSP-Final Inspection3/17/19983/18/19983/18/1998PNR
DetailsJoe Tawney
03/18/98 406 - OLD NAVY STORE--DAN ###-####--HE WILL CALL YOU FOR A TIME FINAL NOT READY
INSP-Conference3/13/19983/13/19983/13/1998 PASS
DetailsJoe Tawney
/ / 406 - PRE FINAL CONFERENCE MONITORING SYSTEM EXIT SIGNS DOOR HDWRE
Plan resubmittals received  3/6/1998
RECEIVED 2 COPIES OF E-Z REVISION #3. ROUTED ONE COPY TO RECORDS AND ONE COPY TO PERRY PAINE TO TAKE TO JOB SITE.
INSP - Framing/Rough-in2/12/19982/12/19982/12/1998PPASS
Details
02/12/98 338 - ###-#### old navy store MADE OK TO COVER FRAM-OK FRAMING DROPPED OF THE APPROVED AS NOTED RESUBMITTALS
INSP - Framing/Rough-in2/10/19982/11/19982/11/1998PPART
Details
02/11/98 338 - FRWL-RATED WALL CONST. OK
INSP - Framing/Rough-in2/10/19982/10/19982/10/1998PPASS
DetailsJoe Tawney
02/10/98 406 - dan ###-#### fire inspection CONF ON EXIT SIGNS, FIRE EXT PLACEMENT, AND EXIT DOOR HDWRE
Plan resubmittals received  2/10/1998
RECEIVED 2 COPIES OF MECHANICAL, PLUMBING, AND FIRE PROTECTION BLUELINES - WET STAMPED AND SIGNED. ROUTED TO RON HILL. RECEIVED 2 COPIES OF STAMPED AND SIGNED A1.0, A2.0, A3.0, A4.0, A4.1, A4.2, A5.3, E-1, E-2, E-4 &E-5 REVISION #2 DESCRIPTION. ROUTED TO RON HILL THEN ONE COPY TO RECORDS, AND ONE COPY TO PERRY PAINE.
90 day tracking............. 10/23/19971/21/1998 PEND
Issue PAID IN FULL permit  1/16/1998
PLANS/APPL TAKEN TO FRONT DESK  1/15/1998 PASS
Print Occupancy Form  1/15/1998
Telephone call  1/15/1998
left message on voice mail
Inspection Record Card- Bld  1/15/1998
Plan Reviewer's activity  1/15/1998 PASS
Received resubmitted plans detail of crridor and engineering of Racks.
Plan assigned to (R_H)11/3/1997 1/15/1998 PASS
Details
01/15/98 11:05:05 R_H - this action updated by action script from <<>> in Case No. BLD97-3195
Routing - PLAN CHECK11/26/1997 1/15/1998 PASS
Telephone call  1/5/1998 FAIL
Spoke with Gary Palmer about submitted Plan sheets for racking, I indicated that the calculations and design had to be under 1994 UBC, that if the Engineers stamp was from out of state that he would have to design to seismic zone #4, and informed him that the engineers stamp had expiered. And asked him for the detail of the on-hour corridor.
Routing - FIRE11/21/1997 11/25/1997 PASS
Plan Reviewer's activity  11/21/1997 FAIL
FAXED REQUIREMENTS TO ROGER PALMER CONTACT PERSON FOR THIS PROJECT. I TALKED TO MISTER PALMER TO GET THE ARCHITECTS ADDRESS AND HE ASKED ME TO FAX HIM ALL CORRESPONDENCE AND HE WOULD GET THE INFORMATION TO THE RIGHT PERSONS. I WILL ROUTE THE PLANS TO THE FIRE DEPARTMENT.
Routing - PUBLIC WORKS11/3/1997 11/4/1997 PASS
Plan routing begun/TENANTS  11/3/1997
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Application received  10/23/1997
Recd Pcfee & Taken To Pln CK  10/23/1997