Plan Reviewer's activity | | | 12/16/1998 | | PEND |
|
|
|
RECEIVED FOUNDATION ENGINEERING AND INFORMATION. STILL WAITING FOR TALL WALL AND BRACING ENGINEERING AND REMAINDER OF INFORMATION REQUIRED.
|
INSP - Final | 12/11/1998 | 12/14/1998 | 12/14/1998 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Hello!. c/n ok, l/c issued.
|
INSP - Final | 12/11/1998 | 12/11/1998 | 12/11/1998 | P | FAIL |
Carl Dependahl
|
|
|
joe ###-#### fn occ insp reconnect hvac duct, seal ext wall penetrations
|
INSP - Final | 12/9/1998 | 12/10/1998 | 12/10/1998 | P | FAIL |
Carl Dependahl
|
|
|
DAIRLD ###-#### PLEASE CALL FIRST-KEY IS ABOVE FRONT DOOR unable to access left tag.
|
INSP - Grading Inspection | 12/1/1998 | | 12/1/1998 | | PASS |
Rita DeYoung
|
|
|
Final grading and revegetaion complete and approved by Public Works.
|
SUPER- Supervisor's review | 6/12/1998 | 6/12/1998 | 6/12/1998 | | PEND |
|
|
|
Framing review all corrections except truss bracing made ok. Will review this P.M..
|
INSP - Framing/Rough-in | 6/11/1998 | 6/12/1998 | 6/12/1998 | A | FAIL |
Bob Archibald
|
|
|
re-inspection said meet 10:30 if possible sheet rock coming at 1 ###-#### dairle. Reasigned to 325. Fail in a.m..
|
INSP - Framing/Rough-in | 6/12/1998 | 6/12/1998 | 6/12/1998 | A | FAIL |
Wes Worcester
|
|
|
no approved plan, fire blking not done, truss eng incomplete....$42 reinspection fee due
|
INSP - Framing/Rough-in | 6/12/1998 | 6/12/1998 | 6/12/1998 | | PASS |
|
|
|
Corrections made ok in p.m..
|
SUPER- Supervisor's review | 6/10/1998 | 6/10/1998 | 6/10/1998 | | PEND |
|
|
|
Conference.
|
INSP - Framing/Rough-in | 6/9/1998 | 6/10/1998 | 6/10/1998 | A | FAIL |
Wes Worcester
|
|
|
06/10/98 342 - 11am Dairld ###-#### said you'd be out there so...insulating w/spraytech, no masks on site except installers.
|
INSP - Framing/Rough-in | 6/10/1998 | 6/10/1998 | 6/10/1998 | P | FAIL |
Carl Dependahl
|
|
|
per bob; to meet w/ bldr, not onsite, left c/n to bring eng's letter per previous c/n, complete various fireblocks; ok to insul ext walls only.
|
INSP - Framing/Rough-in | 6/2/1998 | 6/3/1998 | 6/3/1998 | A | NR |
Wes Worcester
|
|
|
06/03/98 342 - framing/ ###-#### or ###-#### no electrical, mechanical i and approved plan w/engineering not on site...called Dairle
|
INSP - Framing/Rough-in | 4/14/1998 | 4/14/1998 | 4/14/1998 | P | FAIL |
Carl Dependahl
|
|
|
###-#### DAIRLE...keep c/n, need eng's letter, address differences from eng'd plan & approve moment frame, etc. not complete frame insp, just chkng eng'd features
|
INSP - Framing/Rough-in | 4/8/1998 | 4/9/1998 | 4/9/1998 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by Hello!. Contact phone is [3779239]. went late pm...no plan, carpentry only; c/n, need eng's ok for moment frames & eng'd features; nail off sheathing..upper & lower edges missed
|
INSP - Framing/Rough-in | 4/3/1998 | 4/2/1998 | 4/2/1998 | P | NR |
Carl Dependahl
|
|
|
not requested insp...chk sheathing at roof prior to covering...looks ok
|
INSP - Conference | 2/4/1998 | 2/4/1998 | 2/4/1998 | A | PASS |
Carl Dependahl
|
|
|
W/ BLDR RE JOIST INSERTS...OK BY BA, BUT TJI?
|
INSP - Foundation | 1/28/1998 | 1/28/1998 | 1/28/1998 | P | PART |
Carl Dependahl
|
|
|
###-####, DAVE...MET W/ CONT.& DAIRLD WIRTZ ONSITE; REQ'D ENG'S OK FOR RIGID FRAME ASSY. & EXCAVATION....ALL LOOKS OK, OK TO PROCEED W/ POUR. HD'S & BAR IN PLACE AT EXT FND.
|
INSP - Conference | 1/26/1998 | 1/26/1998 | 1/26/1998 | P | PART |
Carl Dependahl
|
|
|
LEFT NOTE AT JOBSITE FOR CONTRACTOR TO CALL ME.
|
INSP - Carpentry | 1/26/1998 | 1/23/1998 | 1/23/1998 | P | PART |
Carl Dependahl
|
|
|
CHK'D WIP, NO ONE ONSITE, NEED ENG'S OK OF SITE EXCAVATION & CLARIFICATION OF STEEL COL. IMBEDS.
|
INSP - Footings | 1/22/1998 | 1/22/1998 | 1/22/1998 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - need engineer's letter
|
INSP - Framing/Rough-in | 1/21/1998 | 1/22/1998 | 1/22/1998 | A | NR |
Wes Worcester
|
|
|
01/22/98 342 - FOOTINGS LOT 6 BLOCK 1 HILLSBORO SUB. ###-#### DARILD. POUR AT 10:00, 1/22/98 need ftg insp....not ready see ftg insp
|
Issue PAID IN FULL permit | | | 1/15/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/14/1998 | | |
|
|
|
|
Telephone call | | | 1/14/1998 | | |
|
|
|
CALLED GAVE DOLLAR AMOUNT TO BOISE VALLEY
|
Print Occupancy Form | | | 1/14/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 12/1/1997 | | 1/14/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 1/13/1998 | | PASS |
|
|
|
TALKED WITH TIM JOHNSON OF BRIGGS ENG. STATES THAT SHEAR AND HOLDOWN DETAILS (DINING) ARE BEING PLACED AT LIVING ROOM. STRAPPING MICRO-LAM THRU DINING ROOM AND COIL STRAPPING ACROSS ENTRY WILL ELIMINATE ANY NEED FOR SHEAR WALL AT DINING ROOM.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/13/1998 | | PASS |
|
|
|
|
Plan assigned to (DJO) | 12/1/1997 | | 1/13/1998 | | PASS |
Dan Overy
|
|
|
hillside 01/13/98 17:26:42 DJO - this action updated by action script from <<>> in Case No. BLD97-3197
|
Plan Reviewer's activity | | | 1/10/1998 | | PEND |
|
|
|
MOMENT FRAME DETAILS & ENG. NOT SUBMITTED (NEW REVISION) RED-LINED SHEET # 8 DOES NOT APPEAR TO CORRESPONDE WITH ENG. SUBMITTED. VERIFY
|
Plan Reviewer's activity | | | 12/9/1997 | | PEND |
|
|
|
VARIOUS ENGINEERING REQUIRED. WALL BRACING, TALL WALLS, ETC. NEED ADDITIONAL INFORMATION FROM DESIGNER.
|
Plans ACCEPTED BY PLAN CHECK | | | 12/9/1997 | | PEND |
|
|
|
|
Plan assigned to (PRP) | 10/23/1997 | | 12/1/1997 | | PEND |
|
|
|
to DJO-HILLSIDE
|
Routing - PLANNING | 11/20/1997 | | 12/1/1997 | | PASS |
|
|
|
approved by Mike Hall
|
Routing - PUBLIC WORKS | 10/23/1997 | | 11/20/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/19/1997 | | 11/19/1997 | | PASS |
Rita DeYoung
|
|
|
Received foundation design and approved as category 3.
|
Routing - PUBLIC WORKS GRADING | 11/6/1997 | | 11/6/1997 | | PEND |
Rita DeYoung
|
|
|
Received engineering on 11/04/97. Talked to Dairld Wurtz on 11/05/97 and told him that due to the height of the retaining wall that this would be a Category 1 and that would delay a building permit. He said that he would go back to his engineer and attempt to revise the wall to be 4 feet or less and make it a Category 3.
|
Routing - PUBLIC WORKS GRADING | 10/24/1997 | | 10/24/1997 | | FAIL |
Rita DeYoung
|
|
|
No engineering or grading plan submitted with house plans. Note on plans said that the engineering would be submitted by the applicant at a later date.
|
Application received | | | 10/23/1997 | | |
|
|
|
|
INSP - Carpentry | 1/22/1998 | 1/22/1998 | 1/22/1997 | P | PART |
Carl Dependahl
|
|
|
has incorrect eng's letter, need prior to pour. ok to begin perimeter ftgs,. need detail for pads w/ imbeds for steel frame; told to have builder call me.
|
INSP - Framing/Rough-in | 2/20/1998 | 2/19/1998 | 2/19/1990 | A | NR |
Carl Dependahl
|
|
|
W/ FRAMER, NEED ENG'D PLANS, SHEAR INSPS
|