Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD97-03210
StatusFinaled
Name DAVE BERENT
Site Address 1010 N ROSE ST
Project NameIDAHY CREDIT UNION
Customer Number 
ePlanReviewNo
Description
IDAHY FEDERAL CREDIT UNION * TO ADD APPROXIMATELY 3892 SQ.FT. OF ADDITIONAL OFFICE/TELLER AREA TO THE EXISTING 7271 SQ.FT BANK BUILDING, INCLUDED IN THIS PERMIT IS A 1008 SQ.FT DRIVE UP CANOPY WHICH IS BEING SUBMITTED FOR REVIEW AS A DEFERED SUBMITTAL. THE ENTIRE BUILDING IS BEING FIRE SPRINKLERED. THE NEW ADDITION IS A SINGLE STORY, METAL FRAMED, TYPE V NONRATED, FOR THE OFFICE AREA AND THE DRIVE UP AREA IS METAL FRAME WITH SKYLIGHT GLAZING. ALL CONSTRUCTION PER THE APPROVED PLANS. ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. PERMIT TO INCLUDE THE INSTALLATION OF NEW DOOR HARDWARE, IN THE EXISTING BUILDING. RELOCATING EXISTING TWO DRIVE UP TELLERS AND ADDING TWO NEW DRIVE UP TELLERS AND ADDING 12 NEW PARKING SPACES. MJP (PC# 693-97) DR121-97 CU36-97
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  11/12/1998 PASS
Perm. Occ. Cert. #7488 issued 11-12-98 to Idahy Federal Credit Union.
INSP - Final11/6/199811/9/199811/9/1998APASS
Details
11/09/98 333 - STRUCTURAL OK
Permanent Occupancy 11/9/199811/9/1998 DONE
Details
INSP-Final Inspection10/6/199810/7/199810/7/1998APASS
DetailsRick Jackson
HERB ###-#### occ approved
INSP - Final8/20/19988/21/19988/21/1998APART
Details
08/21/98 333 - TEMP OK FIRE NEEDED FOR PERM STRUCT OK
Temporary occupancy  8/21/1998 PASS
Temp. Occ. Cert. #3674 issued 8-21-98 to the Idahy Federal Credit Union.
INSP-Final Inspection8/19/19988/20/19988/20/1998AFAIL
DetailsRick Jackson
HERB WILL CALL TO SCHEDULE . ###-####. tampers produce alarm, not spuervisory; AHU detector not ready for test
INSP-Final Inspection8/20/19988/20/19988/20/1998PPART
DetailsRick Jackson
reinspect from 8/20 am temp occ approved. AHU detector not working. will reschedule when working properly
INSP-Final Inspection8/3/19988/3/19988/3/1998AFAIL
DetailsRick Jackson
sprinkler not monitored; panel not ready, extinguishers needed; test all tampers and flows; smoke detector needed for alarm panel; test detector for AHU
Code Occupancy Approval  7/31/1998 PASS
Final signed. Landscapd per plan.
PubWorks Occupancy Approval  7/31/1998 DONE
Signed Permanent Occupancy 7/31/98. R.Cummings
INSP-Final Inspection7/6/19987/7/19987/7/1998PPASS
DetailsRick Jackson
Patrick ###-#### hydro only okay - not a final inspection
INSP-Sprinkler Rough-in/Hydro6/18/19986/19/19986/18/1998P
DetailsRick Jackson
PATRICK ###-####
INSP-Supply line flush6/18/19986/18/19986/18/1998APASS
DetailsRick Jackson
underground flush only - okay
INSP - Foundation5/4/19985/4/19985/4/1998 PASS
Details
05/04/98 333 - olk pend special insp reports
INSP - Framing/Rough-in4/27/19984/28/19984/28/1998APART
Details
04/28/98 333 - all but center bearing wall need detail for bearing
INSP - Framing/Rough-in4/10/19984/10/19984/10/1998PPART
Details
welding ok
INSP - Foundation3/5/19983/6/19983/6/1998PPASS
Details
03/06/98 333 - pending special insp IDAHY CREDIT UNION--FOOTING--NELL 3
INSP - Foundation3/2/19983/3/19983/3/1998PPART
Details
03/03/98 333 - ftg ok pending spec insp reports
Routing Off Site - A.C.H.D10/28/1997 2/13/1998 PASS
PACKAGE #2 CONTACTED DAVE BERENT AT ###-#### TO TAKE PLANS OUT TO ACHD FEES PAID IMPACT FEE CERTIFICATE #98-0811
Plan assigned to (M_P)11/14/1997 2/13/1998 PASS
DetailsMike Phillips
02/13/98 12:00:14 KMM - this action updated by action script from <<>> in Case No. BLD97-3210
Plan Reviewer's activity  2/13/1998 PASS
Print Pending Permit.LaserJet4  2/13/1998 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/13/1998 PASS
Telephone call  2/13/1998 MESS
LEFT MESSAGE 12:19 ON VOICE MAIL
Print Occupancy Form  2/13/1998
Inspection Record Card- Bld  2/13/1998
Issue PAID IN FULL permit  2/13/1998
Plan Reviewer's activity  2/11/1998 PEND
WAITING FOR APPROVED PLANS AND FEE RECEIPT FROM ACHD. LAFT MESSAGE WITH CHUCK AT MAXEY ARCHITECTS TODAY
Routing - MECHANICAL  2/10/1998
FIELD VERIFIED
Plan resubmittals received  2/9/1998
RECEIVED 2 COPIES OF SHEETS A-1, A-2,A-3,A-13,A-17. 1 COPY OF RESPONSE LETTER 2 COPIES OF STRUCTURAL ENGINEER PAGES:COVER, C1 AND C2 1 COPY OF MANUFACTURER CUT SHEETS FOR AUTOMATIC DOOR OPERATORS/ACTUATORS. ROUTED TO MIKE PHILLIPS. KMM
90 day tracking............. 10/24/19971/22/1998 PEND
Routing - FIRE12/16/1997 12/30/1997 PASS
PACKAGE #1
Print Pending Permit.LaserJet4  12/15/1997 FAIL
Plan resubmittals requested  12/15/1997 FAIL
SENT CORRECTION NOTICE.
Plan Reviewer's activity  12/3/1997 HOLD
waiting for information of 8"water line and alley vacatement. 1) ALLEY VACATED IN 1985 PER MARCUS GREEN. 2) WATER LINE IS TO BE ABANDED, WAITING FOR LETTER FROM PINNACLE ENGINEERS AND THE WATER DEPARTMENT PRIOR TO ISSUING PERMIT.
Routing - PLUMBING11/25/1997 12/1/1997 PASS
PACKAGE #1
Routing - PLANNING11/6/1997 11/24/1997 PASS
PACKAGE #1 X-REF: CUP97-0036 & DRH97-0121. APPROVED BY RLB & TKW.
Plan assigned to (RGG)10/28/1997 11/14/1997 PASS
Routing - PUBLIC WORKS10/28/1997 11/6/1997 PASS
PACKAGE #1
Routing - ELECTRICAL10/28/1997 10/28/1997 PASS
no review field verify PACKAGE #1
Plan assigned to (MYS)10/24/1997 10/28/1997
DetailsMarlene Southard
Routing Off Site - STRUCTURAL10/28/1997 10/28/1997 PASS
GAVE PACKAGE #3 FOR OUTSIDE ENGINEERING TO JOHN M. TO EVALUATE. HE STATED WE CAN DO THE ENGINEERING. KMM no out side review required
Plan routing begun/NEW & ADDTN  10/28/1997 PASS
Plans ACCEPTED BY PLAN CHECK  10/28/1997 PASS
Received Certificate of Value  10/24/1997 PASS
Recd Pcfee & Taken To Pln CK  10/24/1997 PEND
Application received  10/24/1997