Fee Review-notes | 7/15/1998 | | 10/16/1998 | | OK |
|
|
|
|
Permanent Occupancy | | 5/4/1998 | 5/4/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/4/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7238 issued 5-4-98 to Staples.
|
INSP-Alarm Testing | 4/28/1998 | 4/29/1998 | 4/29/1998 | P | PASS |
Joe Tawney
|
|
|
04/29/98 406 - DOMINICK/PAGER###-#### - RE-INSP ON ALARMS. REINSP OK FOR PERM OCC
|
INSP-Final Inspection | 4/28/1998 | 4/28/1998 | 4/28/1998 | P | FAIL |
Joe Tawney
|
|
|
04/28/98 406 - reinspection dominic ###-####-voice pager REINSP FAIL ALARM SYSTEM 3 SEPARATE SIGNALS & NFPA 72 FORM
|
INSP-Sprinkler Rough-in/Hydro | 4/22/1998 | 4/23/1998 | 4/24/1998 | A | FAIL |
Joe Tawney
|
|
|
04/23/98 406 - ###-####- VOICE PAGER/ DOMINICK - PLEASE CALL BEFORE YOU CAN BE THERE. REINSP FAIL ALARM SYSTEM HIGH PILED STORAGE ì
|
Code Occupancy Approval | | | 4/23/1998 | | PASS |
|
|
|
FINAL INSPECTION AND EXECUTED BOND RELEASE 4/23 - CAM
|
INSP - Final | 4/10/1998 | 4/13/1998 | 4/13/1998 | A | PASS |
|
|
|
04/13/98 333 - Final on shell & core. This is the one we talked about!
|
INSP - Final | 4/10/1998 | 4/10/1998 | 4/10/1998 | | PART |
|
|
|
04/10/98 338 - ok for cathy to sign temp with achd approval to her
|
Temporary occupancy | | | 4/10/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3590 issued 4-10-98 to Staples the Office Super Store.
|
INSP-Final Inspection | 4/8/1998 | 4/9/1998 | 4/9/1998 | P | PART |
Joe Tawney
|
|
|
###-#### DOMINIQUE \STAPLES FINAL OK FOR TEMP OCC SPKLRS ALARM SYSTEM PAPERWORK
|
Code Occupancy Approval | | | 4/8/1998 | | PEND |
|
|
|
Requested by: Dominic, ###-####--voice pager.
|
INSP-Sprinkler Rough-in/Hydro | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | PART |
Joe Tawney
|
|
|
03/31/98 406 - RON ###-####--WILL CALL TO SCHEDULE--STAPLES OK ON HYDRO TEST OF FDC PIPING
|
INSP-Sprinkler Rough-in/Hydro | 3/26/1998 | 3/26/1998 | 3/26/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - ok on hydro test exc FDC piping ok onrough in exc coverage S
|
INSP-Supply line flush | 3/23/1998 | 3/23/1998 | 3/23/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 3/20/1998 | 3/23/1998 | 3/23/1998 | A | PASS |
|
|
|
03/24/98 338 - CONFERENCE--###-####
|
INSP - Framing/Rough-in | 3/4/1998 | 3/4/1998 | 3/6/1998 | P | PASS |
|
|
|
03/05/98 338 - made ok for the rear portion ok to cover as ele insp appr int. framing
|
90 day tracking............. | | 10/27/1997 | 1/25/1998 | | PEND |
|
|
|
|
INSP - Framing/Rough-in | 1/20/1998 | 1/21/1998 | 1/21/1998 | A | PASS |
|
|
|
01/21/98 338 - BLOCK GROUTING ###-#### ok with sp insp approval
|
INSP - Framing/Rough-in | 1/16/1998 | 1/20/1998 | 1/20/1998 | A | PART |
Tom Arcoraci
|
|
|
MASONARY ,DOMINIQUE ###-####
|
INSP - Framing/Rough-in | 1/15/1998 | 1/15/1998 | 1/15/1998 | P | PART |
|
|
|
01/15/98 338 - this is for a masonry r-bar inspection r-bar is placed ok FRMS-OK FORMS-REBAR
|
INSP - Conference | 1/15/1998 | 1/15/1998 | 1/15/1998 | | PASS |
|
|
|
/ / 338 - on phone for continuity of inspections between building and
|
(F) Reprint permit | | | 1/13/1998 | | |
|
|
|
|
Print Occupancy Form | | | 1/12/1998 | | |
|
|
|
|
Telephone call | | | 1/12/1998 | | |
|
|
|
called at 2:30 and gave $ amount due
|
Inspection Record Card- Bld | | | 1/12/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/12/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/1998 | | PASS |
|
|
|
APPROVED TO ISSUE
|
Waiting for Cert. of Value | | | 1/9/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/9/1998 | | PASS |
|
|
|
APPROVED TO ISSUE
|
Print Pending Permit.LaserJet4 | | | 1/9/1998 | | PASS |
|
|
|
APPROVED TO ISSUE
|
Print Pending Permit.LaserJet4 | | | 1/9/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/12/1997 | | 1/9/1998 | | PASS |
|
|
|
ACHD PACKAGE. impact fees paid 12-19-97 jml
|
Plan assigned to (JML) | 11/14/1997 | | 1/9/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/31/1997 | | PEND |
|
|
|
received response from arch to plan review
|
Routing - PLUMBING | 12/22/1997 | | 12/23/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - FIRE | 12/9/1997 | | 12/19/1997 | | PASS |
|
|
|
PACKAGE #1 REIN
|
Routing - PUBLIC WORKS | 12/8/1997 | | 12/9/1997 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/5/1997 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 12/5/1997 | | FAIL |
|
|
|
REQUESTING RESUBMITTALS FROM ARCH. ROUTING TO FIRE
|
Plan Reviewer's activity | | | 12/5/1997 | | |
|
|
|
|
Plan Reviewer's activity | | | 12/5/1997 | | PEND |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/5/1997 | | FAIL |
|
|
|
SENT CORRECTION LIST TO ARCH AWAITING RESPONSE JML SENT TO FIRE
|
Routing - PLANNING | 11/13/1997 | | 12/1/1997 | | PASS |
|
|
|
PACKAGE #1 PUT RESUBS WITH PLANS (TWO L-1 SHEETS) IN BOB BROWN'S OFFICE. X-REF: CUP97-0102 & DRH97-0152. APPROVED BY RLB & MGS.
|
Plan assigned to (RGG) | 11/3/1997 | | 11/14/1997 | | |
|
|
|
|
Plan resubmittals received | | | 11/13/1997 | | |
|
|
|
RECEIVED TWO L-1 SHEETS. PUT IN BOB BROWN'S OFFICE WITH THE PLANS.
|
Routing - PUBLIC WORKS | 11/3/1997 | | 11/12/1997 | | FAIL |
|
|
|
PACKAGE #1 REQUIRES 3 MORE COPIES OF DRAINAGE PLAN PER BM.
|
Routing Off Site - A.C.H.D | 11/3/1997 | | 11/12/1997 | | PASS |
|
|
|
PACKAGE #2 CONTACTED STEVE HILL AT ###-#### TO TAKE PLANS OUT TO ACHD. FEES DUE PER MGG 11/12/97 ACHD FEES PAID 12/19/97
|
Plans ACCEPTED BY PLAN CHECK | | | 11/3/1997 | | PASS |
|
|
|
RECEIVED PACKAGE #2 AND CIVIL SHEETS. WILL START ROUTING.
|
Plan routing begun/NEW & ADDTN | 11/3/1997 | | 11/3/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 10/27/1997 | | 10/28/1997 | | |
Marlene Southard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/28/1997 | | 10/28/1997 | | PEND |
|
|
|
GAVE JOHN M. PACKAGE #3 TO EVALUATE. HE STATED WE WILL BE DOING THE ENGINEERING. KMM
|
Plans ACCEPTED BY PLAN CHECK | | | 10/28/1997 | | HOLD |
|
|
|
SPOKE WITH BILL OF ATWOOD HE SAID THEY WILL BE SENDING OVER CIVIL SHEETS AND A PACKAGE #2 BY WEEKS END. BILL WILL BE OUT OF TOWN THIS WEEK SO ASK FOR KEITH.
|
Recd Pcfee & Taken To Pln CK | | | 10/27/1997 | | |
|
|
|
|
Received Certificate of Value | | | 10/27/1997 | | PASS |
|
|
|
|
Application received | | | 10/27/1997 | | |
|
|
|
|