Permit Information
Permit NumberBLD97-03236
StatusExpired
Name SCOTT CHANDLER
Site Address 1299 N ORCHARD ST
Project NameSYRINGA BANK-PHASEII
Customer Number 
ePlanReviewNo
Description
SYRINGA BANK BUILDING PHASE II DEVELOPMENT SHELL AND CORE * TO CONSTRUCT A NEW THREE STORY, TYPE II-1HR, FULLY FIRE SPRINKLERED, OFFICE BUILDING ADDITION OF 31,116 S.F. CONSTRUCTION TO CONSIST OF MASONRY EXTERIOR WALLS, STEEL BEAMS AND COLUMNS WITH CONCRETE FLOORS AND ROOF. INTERIOR WALLS ARE STEEL STUD. NOTE: THE ADDITION IS SEPARATED WITH A 2HR AREA SEPARATION WALL AND FIRE SPRINKLERS ARE USED FOR AREA. DR#47-96 CU#29-96 PC#698-97. NO OCCUPANCY ALLOWED UNDER THIS PERMIT. SPEARATE PERMITS REQUIRED FOR TENANT IMPROVEMENTS.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/26/2000 DONE
Temporary occupancy  7/31/1998 PASS
Temp. Occ. Cert. #3665 issued 7-31-98 to Syringa Bank, Phase II.
INSP - Final7/30/19987/30/19987/30/1998PPART
DetailsJim Storey
07/30/98 301 - TCO -TEMP C OF O ISSUED w/c/n posted for p.paine to check
INSP-Final Inspection7/24/19987/27/19987/27/1998PPASS
DetailsJoe Tawney
07/27/98 406 - 1 o'clock with perry/ gary ###-#### FINAL OK FOR CERT OF COMPLETION FOR SHELL AND CORE
INSP-Sprinkler Rough-in/Hydro7/14/19987/15/19987/15/1998APART
DetailsJoe Tawney
07/15/98 406 - 200 lb test/ ###-#### OK ON HYDRO TEST
INSP - Framing/Rough-in6/18/19986/18/19986/18/1998PPART
Details
06/18/98 338 - made ok to cover the 3rd floor bathroom ceilings fire cau
INSP-Sprinkler Rough-in/Hydro5/26/19985/26/19985/26/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON ROUGH IN OF SPKLR SYSTEM
INSP - Framing/Rough-in5/20/19985/21/19985/21/1998APAR
Details
OK TO DROP IN CEILING TILES THIS AREA
INSP - Framing/Rough-in5/19/19985/19/19985/19/1998PPART
Details
fire caulking 2nd floor/ ###-#### made ok above the restrooms
INSP - Wall cover4/24/19984/24/19984/24/1998PPASS
Details
04/28/98 338 - made ok fire caulk ok above the restrooms no answer on the contact #
90 day tracking............. 10/28/19971/26/1998 PEND
Routing Off Site - STRUCTURAL1/12/1998 1/20/1998 PASS
REVISED SUPPLEMENTAL STRUCTURAL CALCULATIONS FOR SYRINGA BANK PHASE II SENT TO CH2MHILL. KMM 1-20-98 1 COPY OF SYRINGA BANK PHASE II SHELL AND CORE RESUBMITTAL NO. 1 AND STRUCTURAL REVIEW LETTER BY CH2MHILL DATED 1-20-98. ROUTED TO MIKE OTTO
Print Occupancy Form  1/20/1998
PLANS/APPL TAKEN TO FRONT DESK  1/20/1998 PASS
Issue PAID IN FULL permit  1/20/1998
Inspection Record Card- Bld  1/20/1998
Plan assigned to (M_O)12/8/1997 1/20/1998 PASS
Telephone call  1/16/1998 PEND
LEFT MESSAGE WITH CH2MHILL TO PROVIDE STATUS ON RESUBMITTAL. PERMIT IS READY TO ISSUE EXCEPT FOR FINAL APPROVAL OF STRUCTURAL. MO
Plan resubmittals received  1/13/1998
RECEIVED 2 COPIES OF REVISED SHEET S1.1. ROUTED TO MIKE OTTO
Routing - FIRE12/18/1997 12/31/1997 PASS
PACKAGE #1
Routing - PLAN CHECK12/8/1997 12/17/1997 PASS
Plan resubmittals requested  12/17/1997 FAIL
CORRECTIONS FOR STRUCTRUAL FAXED TO ARCHITECT. MO
Routing Off Site - A.C.H.D10/29/1997 12/16/1997 PASS
PACKAGE#2 CONTACTED JIM AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES NOT PAID.
Plan assigned to (JCM)11/14/1997 12/8/1997 PASS
DetailsJohn Menard
BOB ASSIGNED THIS PROJECT TO ME, BUT AFTER REVIEWING THE PROJECT IT SEEMED MORE LOGICAL FOR MIKE OTTO TO DO IT SINCE HE DID THE FIRST PHASE.
Routing Off Site - STRUCTURAL10/29/1997 12/2/1997 FAIL
GAVE PLANS TO JOHN TO EVALUATE FOR OUT SIDE ENGINEERING. PACKAGE #3 JOHN WANTS ROUTED TO OUT SIDE ENGINEERING. WILL CONTACT PDQ TO SEND PLANS OUT TO CH2MHILL.
Plan assigned to (RGG)10/29/1997 11/14/1997 PASS
Routing - PLUMBING11/10/1997 11/10/1997 PASS
PACKAGE #1
Routing - ELECTRICAL11/10/1997 11/10/1997 PASS
PACKAGE #1 NO REVIEW FIELD VERIFY
Routing - PLANNING10/31/1997 11/6/1997 PASS
PACKAGE #1 X-REF: CU-29-96 & DR-47-96. APPROVED BY RC & MGS.
Routing - PUBLIC WORKS10/29/1997 10/30/1997 PASS
PACKAGE #1
Plan assigned to (MYS)10/28/1997 10/29/1997
DetailsMarlene Southard
Plan routing begun/NEW & ADDTN  10/29/1997 PASS
Plans ACCEPTED BY PLAN CHECK  10/29/1997 PASS
Received Certificate of Value  10/28/1997 HOLD
CONTACTED JIM ###-#### TO REQUEST A SIGNED CERT. OF VALUE
Recd Pcfee & Taken To Pln CK  10/28/1997
Application received  10/28/1997
Received Certificate of Value  10/28/1997 PASS
RECEIVED SIGNED CERT. OF VALUE. (IN WALL FILE READY TO PUT WITH PLANS)