Case Summary (BLD) | | | 7/26/2000 | | DONE |
|
|
|
|
Temporary occupancy | | | 7/31/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3665 issued 7-31-98 to Syringa Bank, Phase II.
|
INSP - Final | 7/30/1998 | 7/30/1998 | 7/30/1998 | P | PART |
Jim Storey
|
|
|
07/30/98 301 - TCO -TEMP C OF O ISSUED w/c/n posted for p.paine to check
|
INSP-Final Inspection | 7/24/1998 | 7/27/1998 | 7/27/1998 | P | PASS |
Joe Tawney
|
|
|
07/27/98 406 - 1 o'clock with perry/ gary ###-#### FINAL OK FOR CERT OF COMPLETION FOR SHELL AND CORE
|
INSP-Sprinkler Rough-in/Hydro | 7/14/1998 | 7/15/1998 | 7/15/1998 | A | PART |
Joe Tawney
|
|
|
07/15/98 406 - 200 lb test/ ###-#### OK ON HYDRO TEST
|
INSP - Framing/Rough-in | 6/18/1998 | 6/18/1998 | 6/18/1998 | P | PART |
|
|
|
06/18/98 338 - made ok to cover the 3rd floor bathroom ceilings fire cau
|
INSP-Sprinkler Rough-in/Hydro | 5/26/1998 | 5/26/1998 | 5/26/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ROUGH IN OF SPKLR SYSTEM
|
INSP - Framing/Rough-in | 5/20/1998 | 5/21/1998 | 5/21/1998 | A | PAR |
|
|
|
OK TO DROP IN CEILING TILES THIS AREA
|
INSP - Framing/Rough-in | 5/19/1998 | 5/19/1998 | 5/19/1998 | P | PART |
|
|
|
fire caulking 2nd floor/ ###-#### made ok above the restrooms
|
INSP - Wall cover | 4/24/1998 | 4/24/1998 | 4/24/1998 | P | PASS |
|
|
|
04/28/98 338 - made ok fire caulk ok above the restrooms no answer on the contact #
|
90 day tracking............. | | 10/28/1997 | 1/26/1998 | | PEND |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/12/1998 | | 1/20/1998 | | PASS |
|
|
|
REVISED SUPPLEMENTAL STRUCTURAL CALCULATIONS FOR SYRINGA BANK PHASE II SENT TO CH2MHILL. KMM 1-20-98 1 COPY OF SYRINGA BANK PHASE II SHELL AND CORE RESUBMITTAL NO. 1 AND STRUCTURAL REVIEW LETTER BY CH2MHILL DATED 1-20-98. ROUTED TO MIKE OTTO
|
Print Occupancy Form | | | 1/20/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/1998 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 1/20/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/20/1998 | | |
|
|
|
|
Plan assigned to (M_O) | 12/8/1997 | | 1/20/1998 | | PASS |
|
|
|
|
Telephone call | | | 1/16/1998 | | PEND |
|
|
|
LEFT MESSAGE WITH CH2MHILL TO PROVIDE STATUS ON RESUBMITTAL. PERMIT IS READY TO ISSUE EXCEPT FOR FINAL APPROVAL OF STRUCTURAL. MO
|
Plan resubmittals received | | | 1/13/1998 | | |
|
|
|
RECEIVED 2 COPIES OF REVISED SHEET S1.1. ROUTED TO MIKE OTTO
|
Routing - FIRE | 12/18/1997 | | 12/31/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 12/8/1997 | | 12/17/1997 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 12/17/1997 | | FAIL |
|
|
|
CORRECTIONS FOR STRUCTRUAL FAXED TO ARCHITECT. MO
|
Routing Off Site - A.C.H.D | 10/29/1997 | | 12/16/1997 | | PASS |
|
|
|
PACKAGE#2 CONTACTED JIM AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES NOT PAID.
|
Plan assigned to (JCM) | 11/14/1997 | | 12/8/1997 | | PASS |
John Menard
|
|
|
BOB ASSIGNED THIS PROJECT TO ME, BUT AFTER REVIEWING THE PROJECT IT SEEMED MORE LOGICAL FOR MIKE OTTO TO DO IT SINCE HE DID THE FIRST PHASE.
|
Routing Off Site - STRUCTURAL | 10/29/1997 | | 12/2/1997 | | FAIL |
|
|
|
GAVE PLANS TO JOHN TO EVALUATE FOR OUT SIDE ENGINEERING. PACKAGE #3 JOHN WANTS ROUTED TO OUT SIDE ENGINEERING. WILL CONTACT PDQ TO SEND PLANS OUT TO CH2MHILL.
|
Plan assigned to (RGG) | 10/29/1997 | | 11/14/1997 | | PASS |
|
|
|
|
Routing - PLUMBING | 11/10/1997 | | 11/10/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - ELECTRICAL | 11/10/1997 | | 11/10/1997 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW FIELD VERIFY
|
Routing - PLANNING | 10/31/1997 | | 11/6/1997 | | PASS |
|
|
|
PACKAGE #1 X-REF: CU-29-96 & DR-47-96. APPROVED BY RC & MGS.
|
Routing - PUBLIC WORKS | 10/29/1997 | | 10/30/1997 | | PASS |
|
|
|
PACKAGE #1
|
Plan assigned to (MYS) | 10/28/1997 | | 10/29/1997 | | |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/29/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 10/29/1997 | | PASS |
|
|
|
|
Received Certificate of Value | | | 10/28/1997 | | HOLD |
|
|
|
CONTACTED JIM ###-#### TO REQUEST A SIGNED CERT. OF VALUE
|
Recd Pcfee & Taken To Pln CK | | | 10/28/1997 | | |
|
|
|
|
Application received | | | 10/28/1997 | | |
|
|
|
|
Received Certificate of Value | | | 10/28/1997 | | PASS |
|
|
|
RECEIVED SIGNED CERT. OF VALUE. (IN WALL FILE READY TO PUT WITH PLANS)
|