INSP - Final | 8/5/1998 | 8/7/1998 | 8/12/1998 | A | PASS |
Wes Worcester
|
|
|
JOHN RYAN ###-####
|
INSP - Final | 8/7/1998 | 8/7/1998 | 8/7/1998 | | NR |
Wes Worcester
|
|
|
08/07/98 342 - JOHN RYAN ###-#### finishing hard wood floors
|
INSP - Energy code compliance | 4/9/1998 | 4/9/1998 | 4/9/1998 | | PASS |
Wes Worcester
|
|
|
04/08/98 342 - JOHN ###-#### ì
|
INSP - Energy code compliance | 4/7/1998 | 4/8/1998 | 4/8/1998 | P | PASS |
Wes Worcester
|
|
|
JOHN ###-####
|
INSP - Framing/Rough-in | 4/3/1998 | 4/6/1998 | 4/6/1998 | P | PART |
Wes Worcester
|
|
|
04/06/98 342 - nail off floor and if using 14 gauge stales 6/12 shear ok 3/6
|
INSP - Energy code compliance | 4/3/1998 | 4/6/1998 | 4/6/1998 | P | NR |
Wes Worcester
|
|
|
04/06/98 342 - still insulating
|
INSP - Framing/Rough-in | 4/2/1998 | 4/2/1998 | 4/2/1998 | P | PART |
Wes Worcester
|
|
|
04/02/98 342 - JOHN ###-#### no plan or eng on site, penetrations not do
|
INSP - Wall cover | 2/4/1998 | 2/4/1998 | 2/4/1998 | P | PASS |
Wes Worcester
|
|
|
02/04/98 342 - ###-#### pat prob getting gate call
|
INSP - Footings | 2/4/1998 | 2/4/1998 | 2/4/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Footings | 2/3/1998 | 2/3/1998 | 2/3/1998 | P | NH |
Wes Worcester
|
|
|
02/03/98 342 - 3:00 gate key 0626 ###-#### access code inop
|
INSP - Footings | 12/11/1997 | 12/11/1997 | 12/11/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Footings | 12/11/1997 | 12/11/1997 | 12/11/1997 | P | NR |
Wes Worcester
|
|
|
12/11/97 342 -
|
Plans ACCEPTED BY PLAN CHECK | | | 12/3/1997 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/1997 | | PAS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/3/1997 | | PASS |
|
|
|
|
Print Occupancy Form | | | 12/3/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/3/1997 | | |
|
|
|
|
Telephone call | | | 12/3/1997 | | |
|
|
|
left message permit is ready
|
Plan assigned to (DJO) | 12/1/1997 | | 12/3/1997 | | PASS |
Dan Overy
|
|
|
HILLSIDE 12/03/97 11:59:59 DJO - this action updated by action script from <<>> in Case No. BLD97-3250
|
Issue PAID IN FULL permit | | | 12/3/1997 | | |
|
|
|
|
Plan assigned to (PRP) | 10/29/1997 | | 12/1/1997 | | PEND |
|
|
|
TO DJO--HILLSIDE
|
Routing - PLANNING | 11/24/1997 | | 11/25/1997 | | PASS |
|
|
|
approved by MH
|
Routing - PUBLIC WORKS | 10/29/1997 | | 11/24/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/24/1997 | | 11/24/1997 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS GRADING | 10/30/1997 | | 10/30/1997 | | FAIL |
Rita DeYoung
|
|
|
Soils report referred to Sub soils report which required setback from descending slope as specified by UBC. This requirement was not met. Talked with Roger Smith at Pinnacle and told him that he must do a site specific soils report to reduce setback required by UBC.
|
Application received | | | 10/29/1997 | | |
|
|
|
|